Building Permit Fees in DeLand, FL (2026)

In DeLand, a $50,000 kitchen remodel runs about $630.47 in permit fees, a $15,000 re-roof about $116.50, an $8,000 HVAC change-out about $96.50, a $12,000 electrical panel upgrade or rewire about $129.00, an $8,000 whole-house repipe about $160.59, and a new $350,000 single-family home about $3,638.28. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from City of DeLand Exhibit A – Building Permit Fees (effective June 1, 2026), last verified July 17, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Residential (1–2 family)
0.9375% of job value, minimum $62.50
Commercial / 3+ units
0.9375% of job value, minimum $125.00
BCAI State Surcharge (§468.631 F.S.)
1.5% of the permit fee, minimum $2.00
DCA State Surcharge (§553.721 F.S.)
1% of the permit fee, minimum $2.00
Plan review – commercial/multi-family
0.14375% of job value, minimum $125.00
Plan review – residential
0.05% of job value, minimum $50.00
Submittal fee – commercial building
$200.00
Submittal fee – residential building
$100.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Source

City of DeLand Exhibit A – Building Permit Fees (effective June 1, 2026)

Schedule effective June 1, 2026. Last verified: July 17, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in DeLand are the same either way.

$
$50,000$2,000,000
Estimated building permit fee
$3,638.28
Building permit fee$3,281.25
0.9375% of job value, minimum $62.50
BCAI State Surcharge (§468.631 F.S.)$49.22
Schedule confirms the pass-through applies but does not print the rate; statutory 1.5% of permit fee, $2 min. Exempt from the +25% header (highlighted).
DCA State Surcharge (§553.721 F.S.)$32.81
Schedule confirms the pass-through applies but does not print the rate; statutory 1.0% of permit fee, $2 min. Exempt from the +25% header (highlighted).
Plan review – residential$175.00
Applications requiring plan review: 1–2 family dwellings, mobile homes, remodels, additions, alterations, accessory structures, pools/spas. Listed $0.40 per $1,000 valuation, $40 min; +25% header → charged $0.50/$1,000 (0.05%), $50 min.
Submittal fee – residential building$100.00
Due at submittal; non-refundable and NOT credited toward the permit fee. Highlighted in the schedule → exempt from the +25% increase (charged as listed).
Total estimate$3,638.28

DeLand values work at the current ICC Building Valuation Data Table or your actual contract value, whichever is higher (signed contracts may be required) — if the ICC valuation is higher, the actual fee will be too.

Estimate only. Confirm with the DeLand building department before applying.

Other jurisdictions in Volusia County