Building Permit Fees in Holly Hill, FL (2026)

In Holly Hill, a $50,000 kitchen remodel runs about $381.38 in permit fees, an $8,000 HVAC change-out about $79.00, an $8,000 whole-house repipe about $89.00, and a new $350,000 single-family home about $1,720.00. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.

Covers building, plumbing, and mechanical/HVAC permits. Fees from City of Holly Hill - City Wide Fee Schedule EFFECTIVE 10/01/2025, last verified July 21, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Standard
tiered rates (see fee table)
$0–$2,000
$20.00
$2,000–$4,000
$30.00
$4,000–$100,000
$75.00 + $4.00 per $1,000
$100,000–$500,000
$450.00 + $3.00 per $1,000
$500,000–$1,000,000
$1,650.00 + $1.50 per $1,000
Over $1,000,000
$2,150.00 + $1.00 per $1,000
Building Application Fee – Commercial
$60.00
Building Application Fee – Residential
$30.00
FL BCAIF surcharge (DBPR, §468.631)
1.5% of the permit fee, minimum $2.00
FL building-code enforcement surcharge (§553.721)
1% of the permit fee, minimum $2.00
Plan Review Fee (Valuation-Based)
tiered by job value
$0–$5,000
$25.00
$5,000–$10,000
$30.00
$10,000–$50,000
$60.00
$50,000–$100,000
$80.00
$100,000–$200,000
$100.00
$200,000–$500,000
$340.00
Over $500,000
$340.00 + $20.00 per $50,000
Technology Fee
10% of the permit fee, minimum $10.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Source

City of Holly Hill - City Wide Fee Schedule EFFECTIVE 10/01/2025

Schedule effective October 1, 2025. Last verified: July 21, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Holly Hill are the same either way.

$
$50,000$2,000,000
Estimated building permit fee
$1,720.00
Building permit fee$1,200.00
tiered rates (see fee table)
Building Application Fee – Residential$30.00
'APPLIC FEE-RES BLDG PRMIT $30.00' (residential accessory structure application fee is also $30.00, same value, no separate add-on needed).
FL BCAIF surcharge (DBPR, §468.631)$18.00
The citywide fee schedule PDF does not print the statutory state surcharges; statutory 1.5% / $2.00 minimum applied (Winter Garden precedent). Added 2026-07-21 review.
FL building-code enforcement surcharge (§553.721)$12.00
The citywide fee schedule PDF does not print the statutory state surcharges; statutory 1.0% / $2.00 minimum applied (Winter Garden precedent). Added 2026-07-21 review.
Plan Review Fee (Valuation-Based)$340.00
Valuation-banded plan review fee table immediately following BUILDING PERMIT FEES. No 'or fraction thereof' language in source for the top band's per-$50,000 increment, so Round Up Increments left unchecked.
Technology Fee$120.00
'TECHNOLOGY FEE: The greater of $10.00 or 10% of permits and business tax receipt fees.' Modeled as 10% of the permit fee with a $10 minimum, applied to all permit types (source does not restrict to a specific trade).
Total estimate$1,720.00

Fees are charged on the value your jurisdiction assigns to the work — many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Holly Hill building department before applying.

Other jurisdictions in Volusia County