Building Permit Fees in Holly Hill, FL (2026)
In Holly Hill, a $50,000 kitchen remodel runs about $381.38 in permit fees, an $8,000 HVAC change-out about $79.00, an $8,000 whole-house repipe about $89.00, and a new $350,000 single-family home about $1,720.00. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.
Covers building, plumbing, and mechanical/HVAC permits. Fees from City of Holly Hill - City Wide Fee Schedule EFFECTIVE 10/01/2025, last verified July 21, 2026.
Fee details
Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
City of Holly Hill - City Wide Fee Schedule EFFECTIVE 10/01/2025
Schedule effective October 1, 2025. Last verified: July 21, 2026
Fee calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Holly Hill are the same either way.
Fees are charged on the value your jurisdiction assigns to the work — many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Holly Hill building department before applying.