Maricopa, AZ Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Maricopa, straight from the official fee schedule, with a free permit fee calculator below.
In Maricopa, a building permit for a $50,000 remodel runs $1,319.90 in permit fees, a $20,000 re-roof $705.70, a $10,000 HVAC change-out $440.10, a $10,000 electrical panel upgrade or rewire $440.10, and a $10,000 whole-house repipe $440.10. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Maricopa Development Services Fee Schedule, Rev. 10/2025 (Resolution 25-35, effective October 2, 2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Maricopa permit portal, or call (520) 316-6920.
How Maricopa values a job: New commercial construction is valued by occupancy and construction type from the current ICC valuation table, per the city's fee schedule.
Schedule effective October 2, 2025. Last verified: October 9, 2026
Maricopa Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Maricopa
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Maricopa electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMaricopa Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Maricopa are the same either way.
3 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
New commercial construction is valued by occupancy and construction type from the current ICC valuation table, per the city's fee schedule.
Estimate only. Confirm with the Maricopa building department before applying. Apply online. Phone: (520) 316-6920. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Maricopa electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Maricopa
Maricopa takes building permit applications and plans electronically only; paper plan submittals are no longer accepted. Apply, pay and track through the city's VIP Portal. Questions go to the Development Services Permit Center at (520) 316-6920 or dsd@maricopa-az.gov, open Monday to Thursday, 7 a.m. to 6 p.m., closed Fridays.
Source: Maricopa application instructions
Apply online: Maricopa permit portal- Phone
- (520) 316-6920
- dsd@maricopa-az.gov
- Address
- 39700 W Civic Center Plaza, Maricopa, AZ 85138
- Hours
- Monday to Thursday, 7 a.m. to 6 p.m., closed Fridays
- Source
- Official contact page
Maricopa Permit Fee FAQs
How Much Does a Building Permit Cost in Maricopa?
How Much Does a Roofing Permit Cost in Maricopa?
How Are Permit Fees Calculated in Maricopa?
What Surcharges Are Added to Permits in Maricopa?
Where Do These Fees Come From?
Other Jurisdictions in Pinal County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.