Baker County, FL Permit Fees (2026)
Building permit fees for unincorporated Baker County, with a free permit fee calculator. Inside city limits? Pick your city below; incorporated cities have their own fee schedules.
In Unincorporated Baker County, a $10,000 HVAC change-out runs $79.00 in permit fees, a $10,000 electrical panel upgrade or rewire $79.00, and a whole-house repipe $119.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorBaker County Community Development Department permit fees page (captured September 15, 2026)
Covers building, electrical, plumbing, and mechanical/HVAC permits.
Apply online at the Unincorporated Baker County permit portal, or call 904-259-2403.
Last verified: September 16, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Jurisdictions in Baker County
Jobs inside city limits are permitted by the city, not the county.
Unincorporated Baker County Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Unincorporated Baker County
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Unincorporated Baker County building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageUnincorporated Baker County Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Unincorporated Baker County are the same either way.
Unincorporated Baker County does not have a documented building fee for this project type in our sourced data yet. Check the official fee schedule linked above, or ask the building department.
Estimate only. Confirm with the Unincorporated Baker County building department before applying. Apply online. Phone: 904-259-2403. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Unincorporated Baker County building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Unincorporated Baker County
Baker County Community Development issues permits in person at 360 E Shuey Ave, Macclenny; the Permit Application and Mobile Home Installation Packet are linked under Forms and Applications on the department page. Permits must be purchased by the license holder, or by someone holding an original notarized authorization (such as a Power of Attorney) signed by the contractor naming who may pull permits. State certified contractors must provide a current state license, liability insurance and workers comp (or a workers comp exemption form), and an occupational license before building permits are issued. Schedule inspections through the Inspection Line at 904-259-4896; calls before 4pm are scheduled for the next business day, and later calls for two business days out.
Source: Unincorporated Baker County application instructions
Apply online: Unincorporated Baker County permit portal- Phone
- 904-259-2403
- Inspection Line
- 904-259-4896
- Address
- 360 E Shuey Ave, Macclenny, FL 32063
- Hours
- Monday - Friday 8:30am to 5pm
- Source
- https://www.bakercountyfl.org/communitydevelopment.php (owner browser capture 2026-09-15)
Unincorporated Baker County Permit Fee FAQs
How Are Permit Fees Calculated in Unincorporated Baker County?
What Surcharges Are Added to Permits in Unincorporated Baker County?
Do I Need a Permit for a Small Residential Job in Unincorporated Baker County?
Where Do These Fees Come From?
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.