Gila County, AZ Permit Fees (2026)
Building permit fees for unincorporated Gila County, with a free permit fee calculator. Inside city limits? Pick your city below; incorporated cities have their own fee schedules.
Unincorporated communities such as Pine, Strawberry and Tonto Basin pay these county rates rather than a city schedule.
A note on these figures from the official schedule. Details
Residential electrical, plumbing and mechanical work done under a building permit for a home, addition or remodel is included in the building permit fee; the trade permit fees shown here apply to stand-alone trade jobs. See the official notice
In Unincorporated Gila County, a building permit for a $50,000 remodel runs $1,063.01 in permit fees, a $20,000 re-roof $530.06, an HVAC change-out $35.00, a $10,000 electrical panel upgrade or rewire $50.00, and a whole-house repipe $175.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume one compressor and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorGila County Fee Schedule for Building Safety, Permits and Services (effective March 22, 2007; revised 12-2019)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Call the building department at (928) 402-4224.
How Unincorporated Gila County values a job: Building permit fees are priced from a construction valuation taken from the Building Valuation Data table in the county fee schedule (square foot costs per the Building Safety Journal, August 2005), or from actual valuation or the Means Construction Cost Guide for other structures.
Schedule effective March 22, 2007. Last verified: October 13, 2026
Jurisdictions in Gila County
Jobs inside city limits are permitted by the city, not the county. Across Gila County's 4 covered jurisdictions, a building permit for a $50,000 remodel runs from $221.10 (Star Valley) to $1,503.60 (Globe).
Unincorporated Gila County Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Unincorporated Gila County
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Unincorporated Gila County building permit fees here first. One sponsor per trade, $39 a month, month to month.
Run a contracting business? Leave your email and we'll send availability and how it works.
Or see sponsor detailsUnincorporated Gila County Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
3 documented rates for this permit type; pick the one that matches your job.
A note on these figures from the official schedule. Details
Residential electrical, plumbing and mechanical work done under a building permit for a home, addition or remodel is included in the building permit fee; the trade permit fees shown here apply to stand-alone trade jobs. See the official notice
Building permit fees are priced from a construction valuation taken from the Building Valuation Data table in the county fee schedule (square foot costs per the Building Safety Journal, August 2005), or from actual valuation or the Means Construction Cost Guide for other structures.
Estimate only. Confirm with the Unincorporated Gila County building department before applying. Phone: (928) 402-4224. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Unincorporated Gila County building permit fees here first. One sponsor per trade, $39 a month, month to month.
Run a contracting business? Leave your email and we'll send availability and how it works.
Or see sponsor detailsHow to Apply for a Permit in Unincorporated Gila County
Submit building plans by email as PDF documents to communitydevelopment@gilacountyaz.gov, or in person at the Community Development offices in Globe (745 N Rose Mofford Way) or Payson (608 E Hwy 260). Include two sets of plans that meet the design criteria, with two site plans. Permits from other departments, such as wastewater or floodplain, may be needed before a building permit can be issued. Once plans are approved, purchase the building permit; you can pay by credit or debit card over the phone, or by cash or check payable to Gila County. You will receive the list of required inspections when the permit is issued; call either office to schedule an inspection. Call either office for electrical, plumbing and mechanical permits. The county does not list an online permit portal.
Source: Unincorporated Gila County application instructions
- Phone
- (928) 402-4224 (Globe office); (928) 474-7110 (Payson office)
- Address
- 745 N Rose Mofford Way, Globe, AZ 85501 (Payson office: 608 E Hwy 260, Payson, AZ 85541)
- Hours
- Monday to Friday, 8am to 5pm
- Source
- Official contact page