Florida cities and counties have been adopting new building permit fee schedules at an unusual pace in 2026. Of the 411 Florida jurisdictions this site covers, 131 in 35 counties now carry a fee schedule that took effect on or after July 1, 2026, and 47 have a change adopted or under consideration that their page here does not yet reflect. This page lists both, with a link to each jurisdiction's sourced fee page and calculator, where you will find the current schedule, the official document it comes from, and the date we last verified it.
Why so many Florida fee schedules changed in 2026
Two things drove the wave. The first is Florida House Bill 803 (chapter 2026-63, Laws of Florida), whose fee provisions took effect July 1, 2026. It bars inspection fees based on a project's total cost, requires permit fee reductions when a licensed private provider handles plan review or inspections, and exempts some small residential jobs from permitting. Schedules built on percent-of-value inspection fees had to be rewritten, and many jurisdictions used the occasion to restructure their fees entirely. Our HB 803 overview covers what the law changed, and the HB 803 fee savings guide covers what an applicant can save under it.
The second is the budget calendar. Florida cities and counties run on a fiscal year that starts October 1, so fee resolutions are often adopted alongside the budget in September and take effect on October 1. A schedule you looked up in the summer may already be replaced.
Schedules that took effect in October 2026
55 jurisdictions' current schedule took effect in October 2026: Archer, Avon Park, Belle Isle, Boca Raton, Boynton Beach, Crescent City, Davie, DeLand, Deltona, Doral, Edgewood, Flagler Beach, Fort Myers Beach, Gulf Stream, Hallandale Beach, Hawthorne, Highland Beach, Holly Hill, Keystone Heights, LaCrosse, Lake Clarke Shores, Lake Helen, Lake Park, Lake Placid, Lake Wales, Lake Worth Beach, Lantana, Malabar, Miami Beach, Micanopy, Mulberry, New Port Richey, Newberry, Oakland Park, Ormond Beach, Palatka, Palm Beach, Palm Beach Gardens, Pembroke Pines, Pomona Park, Pompano Beach, Ponce Inlet, South Daytona, Treasure Island, Unincorporated Alachua County, Unincorporated Clay County, Unincorporated Highlands County, Unincorporated Miami-Dade County, Unincorporated Orange County, Unincorporated Osceola County, Unincorporated Putnam County, Unincorporated St. Johns County, Unincorporated Volusia County, Weston, and Winter Park. Check the linked page before pricing a job there, since a quote built on the old schedule may no longer match what the building department charges.
Fee changes adopted or under consideration
These jurisdictions have a fee change on the way that their page does not yet reflect: a schedule adopted but not yet in effect or not yet published, a vote that has been scheduled or held without a published outcome, an announced update, or an annual adjustment not yet posted. Estimates on their pages use the schedule in force today until the change is confirmed.
- Apalachicola (Franklin County): Apalachicola has scheduled adoption of a new fee schedule (Ordinance 2026-04) with fees effective October 1, 2026. Several residential fees are set to increase, including roof permits from $100 to $200. Fees shown reflect the current schedule. Official notice
- Bartow (Polk County): The Building Department has proposed a comprehensive update of this fee schedule, noting its fees have been unchanged for more than 25 years. Watch for a new schedule in the coming months. Official notice
- Belleair Beach (Pinellas County): Pinellas County, which issues Belleair Beach's building permits, has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Belleair Bluffs (Pinellas County): SAFEbuilt runs Belleair Bluffs' building department and applies Pinellas County's fee schedule. Pinellas County has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Belleair Shore (Pinellas County): Pinellas County, which issues Belleair Shore's building permits, has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Bonifay (Holmes County): Holmes County's Building Department, which issues permits in Bonifay, has announced that, effective October 1, 2026, plan review fees will be $300 for residential and $500 for commercial permits, due at submittal. Estimates here use the currently adopted schedule; confirm with the Building Department at 850-547-1119. Official notice
- Daytona Beach (Volusia County): Daytona Beach is waiving permit and inspection fees for eligible commercial and residential projects through January 31, 2027. The fees shown here are the city's 2025-2026 schedule, which projects not covered by the waiver pay until the waiver ends; the city adopted a recalibrated fee schedule (Resolution 2026-269, August 19, 2026) that takes effect when the waiver period ends. Confirm eligibility with Permits and Licensing at (386) 671-8178. Official notice
- Dundee (Polk County): The Town Commission took up a complete replacement building fee schedule on October 6, 2026; the outcome has not been published yet. If it was adopted, the fees shown here will change. Official notice
- Esto (Holmes County): Holmes County's Building Department, which issues permits in Esto, has announced that, effective October 1, 2026, plan review fees will be $300 for residential and $500 for commercial permits, due at submittal. Estimates here use the currently adopted schedule; confirm with the Building Department at 850-547-1119. Official notice
- Fort Myers (Lee County): The City of Fort Myers adopted Resolution No. 2026-94 on October 5, 2026, which reduces certain building, permitting and inspection fees by 75% for six months, starting October 6, 2026 according to city staff. The resolution's list of reduced fees has not been published, so the estimates here show the full adopted fees and may be higher than what the City currently charges. Confirm current fees with the Building, Permitting and Inspections Division at 239-321-7925. Official notice
- Fort White (Columbia County): Columbia County, which issues building permits in Fort White, took up Resolution 2026R-054 on October 1, 2026, a new building and zoning fee schedule that would take effect January 1, 2027 if adopted; the outcome has not yet been confirmed. It would replace the county's current valuation-based permit and plan review fees with flat application fees plus $180 per standard inspection. Estimates on this page use the fee schedule in effect today. Official notice
- Frostproof (Polk County): Frostproof staff told the City Council in May 2026 that this valuation-based schedule must be replaced to comply with Florida HB 399 (effective January 1, 2027), and the Council directed staff to bring a new fee proposal. No replacement had been adopted as of September 28, 2026; fees may change before January 1, 2027. Official notice
- Golf (Palm Beach County): The Village Council took up Resolution No. 2026-34 on October 21, 2026, which replaces this fee schedule (Res. 2026-27) to comply with 2026 HB 803; the outcome has not been published yet, and the new figures are not shown until the adopted schedule is published. Remodels and commercial interior buildouts show no estimate: the Village's schedule does not say how an interior remodel is priced. Ask the Village Clerk at 561-732-0236. Official notice
- Holmes Beach (Manatee County): Holmes Beach considered an amended Master Fee Schedule (Resolution 26-08) at its September 22, 2026 City Commission meeting, and building permit fees may change. Confirm current fees with the Building Department before you apply. Official notice
- Indian Rocks Beach (Pinellas County): Pinellas County, which issues Indian Rocks Beach's building permits, has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Kenneth City (Pinellas County): Pinellas County, which issues Kenneth City's building permits, has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Key Biscayne (Miami-Dade County): The Village Council has an item to amend the building permit fee methodology on its October 13, 2026 working agenda. Until a new schedule is adopted, estimates use the fee schedule effective March 1, 2022. Official notice
- Kissimmee (Osceola County): Kissimmee adjusts these fees every October 1 by the CPI-U under Resolution 24-2025. Figures shown are the schedule effective November 1, 2025; the October 2026 adjustment may not yet be reflected. Official notice
- Lighthouse Point (Broward County): On September 24, 2026 the City Commission took up a revised building permit fee schedule (Resolution 2026-2748) which the staff memo lists as effective October 1, 2026. It keeps the $125 minimum and the 1.35% valuation rate shown here, adds private provider discounts (20% residential; 25% or 50% commercial), and raises hourly review and re-inspection fees. Its adoption record has not been published yet; confirm current fees with the Building Department. Official notice
- Melbourne Beach (Brevard County): Melbourne Beach is preparing a new flat fee schedule to comply with 2026 Florida legislation that ends percent of value permit pricing on January 1, 2027. The current schedule below remains in effect until the town adopts the replacement, which the Building Official presented to the Town Commission on September 3, 2026. Official notice
- Miami Shores (Miami-Dade County): Miami Shores placed a new Building Department fee schedule on its November 17, 2026 Village Council agenda (per-square-foot permit fees, higher minimums and application fees), after taking no action on it in July and September. Whether it was adopted is not yet published here. Confirm current fees with the Building Department. Official notice
- Miramar (Broward County): Miramar's adopted fee schedule adjusts city fees automatically each October 1 by the lesser of 3% or the change in the Consumer Price Index. The October 2026 adjusted amounts are kept on file with the City Clerk and are not published, so city fees may be up to 3% higher than shown. County and state fees are not adjusted.
- New Smyrna Beach (Volusia County): New Smyrna Beach did not publish an October 1, 2026 fee update, and its October 1, 2025 schedule remains in effect. Ordinance No. 36-26, which would move permit fees to a new fee resolution based on the city's actual costs, is scheduled for a public hearing on November 17, 2026. Fees may change if the ordinance and a new fee resolution are adopted. Official notice
- Noma (Holmes County): Holmes County's Building Department, which issues permits in Noma, has announced that, effective October 1, 2026, plan review fees will be $300 for residential and $500 for commercial permits, due at submittal. Estimates here use the currently adopted schedule; confirm with the Building Department at 850-547-1119. Official notice
- North Bay Village (Miami-Dade County): North Bay Village adopted this square-foot fee schedule on June 29, 2026 to comply with HB 803 and re-adopted it in its master fee schedule on July 28, 2026. At the June 29 meeting the Village Manager said any reimbursements due under a later revised schedule would be paid; no revision had been scheduled as of September 28, 2026. Roof permit estimates include the Village's 50% roof permit discount, which the prior fee schedule set to expire December 31, 2026 unless renewed. Official notice
- North Palm Beach (Palm Beach County): The North Palm Beach Village Council took up a resolution on October 22, 2026 that would replace the per-square-foot building, electrical, mechanical and plumbing fees shown here with a flat $170 (single-family) or $255 (multifamily and commercial) plus $75 per required inspection, raise the administrative fee from 4% to 8%, and change several flat fees; the outcome has not been published yet. These estimates use the schedule in force before that vote. Separately, under Florida HB 803 some single-family projects under $7,500 may not need a Village permit; the exemption excludes electrical, plumbing, structural, mechanical and gas work and flood-zone properties, and requires a notarized request. Official notice
- Ocala (Marion County): Ocala adopted an updated citywide fee schedule with its FY2026-27 budget on September 15, 2026. These estimates use the FY2025-26 schedule until the new fee pages are published. Official notice
- Oldsmar (Pinellas County): Pinellas County, which issues Oldsmar's building permits, has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Orlando (Orange County): The city has announced that it is reviewing amended permit fees required by Florida HB 803 and will post an updated fee schedule once approved. The figures shown are the adopted January 2026 schedule, which is still the schedule the city publishes as current. Official notice
- Oviedo (Seminole County): Oviedo also charges a building technology fee that is not included in this estimate. On September 21, 2026 the City Council adopted Resolution 4762-26 on its consent agenda by a 5-0 vote, which replaces the valuation-based technology fee ($5.00, $25.00, or $250.00) with flat amounts from $10.00 to $300.00 by application type and square footage, effective on adoption. As of October 27, 2026 the city's online fee table still lists the old amounts. Confirm the current technology fee with Building Services before relying on this estimate. Official notice
- Ponce de Leon (Holmes County): Holmes County's Building Department, which issues permits in Ponce de Leon, has announced that, effective October 1, 2026, plan review fees will be $300 for residential and $500 for commercial permits, due at submittal. Estimates here use the currently adopted schedule; confirm with the Building Department at 850-547-1119. Official notice
- Safety Harbor (Pinellas County): Pinellas County, which issues Safety Harbor's building permits, has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule. Official notice
- Sebastian (Indian River County): The City of Sebastian adopted a new building permit fee schedule (Resolution R-26-42, adopted October 14, 2026) that takes effect December 1, 2026. Estimates here use the current schedule until then. Under the new schedule a permit costs 0.35% of the construction cost (0.25% from $100,000) plus plan review and $75 per inspection, and a residential re-roof is $225. Official notice
- St. Petersburg (Pinellas County): St. Petersburg is proposing a restructured building permit fee schedule with lower valuation rates, a new $75 per-inspection fee, a $15 technology fee, and plan review folded into the permit fee. A City Council committee endorsed it on August 27, 2026, but it has not been adopted. Estimates here use the fee schedule currently in the City Code. Official notice
- Sunrise (Broward County): Sunrise adjusts its flat permit fees, the $222.44 minimum and its other building fees for inflation (CPI) every October 1. The October 2026 schedule has not been posted yet, so flat fees shown here may be slightly lower than what the city now bills. The 5.50% valuation rate is set by ordinance and did not change.
- Tallahassee (Leon County): Tallahassee building permit fees adjust each October 1 by the annual CPI increase (Land Development Code Sec. 3-180(b)). Estimates show the fees effective October 1, 2025 until the city posts its October 1, 2026 schedule. Official notice
- Unincorporated Brevard County: Brevard County's commercial Fire Prevention Review fee is scheduled to change to $56.00 plus 0.35% of job value on October 1, 2026 under the FY 2026-27 fire rates resolution heard August 25, 2026; adoption is not yet confirmed in posted minutes. Estimates use the FY 2025-26 rate of $54.00 plus 0.35%. Official notice
- Unincorporated Columbia County: Columbia County's Board of County Commissioners took up Resolution 2026R-054 on October 1, 2026, a new building and zoning fee schedule that would take effect January 1, 2027 if adopted; the outcome has not yet been confirmed. It would replace the current valuation-based permit and plan review fees with flat application fees plus $180 per standard inspection. Estimates on this page use the fee schedule in effect today. Official notice
- Unincorporated Gulf County: On September 22, 2026 the Gulf County Board of County Commissioners considered a Building Department request to raise permit base prices (mechanical, electrical and plumbing to $150, roofing to $175, residential pools to $300) and to include the Land Development Regulations review fee in permit costs for private-provider applicants. The outcome and effective date are not yet published, so this estimate uses the codified Sec. 10-3 fees. Confirm current fees with the Building Department at (850) 229-8944. Official notice
- Unincorporated Holmes County: Holmes County's Building Department has announced that, effective October 1, 2026, plan review fees will be $300 for residential and $500 for commercial permits, due at submittal. Estimates here use the currently adopted schedule (plan review at 25% of the building permit fee, $25 minimum, residential; 50%, $50 minimum, commercial). Confirm plan review charges with the Building Department at 850-547-1119. Official notice
- Unincorporated Liberty County: Liberty County adopted an updated Building Department fee schedule on October 8, 2026. Estimates here still show the schedule adopted April 9, 2026 and are being updated. Official notice
- Unincorporated Pinellas County: Pinellas County has announced that its inspection and private provider fees will change under Florida House Bill 803, but it has not yet published the updated schedule. Estimates use the county's current published schedule, which the county carried unchanged into its FY2027 budget. Official notice
- Welaka (Putnam County): The Town Council is discussing revisions to existing fees and new fees (September 29, 2026 agenda), and a new supplemental fee schedule ordinance (Ordinance 2026-12) was scheduled for first reading on September 9, 2026. Nothing has been adopted yet. Confirm current fees with Town Hall before you apply.
- West Park (Broward County): West Park has proposed Resolution 2026-75, which adds private provider fee reductions (25% or 50% commercial, 5% or 10% residential) and two private provider charges ($150 submittal compliance check, $75 inspection reports). Its outcome at the October 7, 2026 commission meeting is not yet published; other permit fees are unchanged.
- Westville (Holmes County): Holmes County's Building Department, which issues permits in Westville, has announced that, effective October 1, 2026, plan review fees will be $300 for residential and $500 for commercial permits, due at submittal. Estimates here use the currently adopted schedule; confirm with the Building Department at 850-547-1119. Official notice
- Wewahitchka (Gulf County): On September 22, 2026 the Gulf County Board of County Commissioners, which administers building permits for Wewahitchka, considered a Building Department request to raise permit base prices (mechanical, electrical and plumbing to $150, roofing to $175, residential pools to $300) and to include the Land Development Regulations review fee in permit costs for private-provider applicants. The outcome and effective date are not yet published, so this estimate uses the county's codified Sec. 10-3 fees. Confirm current fees with the Gulf County Building Department at (850) 229-8944. Official notice
- Winter Garden (Orange County): Some single family projects under $7,500 no longer need a building permit. Under Florida HB 803, effective July 1, 2026, Winter Garden exempts certain minor residential work such as painting, floor coverings, interior trim, cabinet replacement on unchanged utilities, and roof repairs under 100 square feet. You must submit a Single Family Dwelling Permit Exemption Request and have it approved before work begins. The exemption does not cover any electrical, plumbing, mechanical, gas or solar work, roofing, siding, windows, exterior doors, structural work, or any property in a flood hazard area. Since late September 2026, new buildings and additions also need a separate city Zoning Compliance Review (Ordinance 26-26), with its own fee set by a resolution the City Commission has not yet adopted. Official notice
New fee schedules since July 1, 2026, by county
Each entry shows the date its current schedule took effect. A city that has its building permits handled by another jurisdiction uses that jurisdiction's schedule, and the entry says so.
Alachua County
- Archer: effective October 1, 2026 (uses Alachua County's schedule)
- Hawthorne: effective October 1, 2026 (uses Alachua County's schedule)
- LaCrosse: effective October 1, 2026 (uses Alachua County's schedule)
- Micanopy: effective October 1, 2026 (uses Alachua County's schedule)
- Newberry: effective October 1, 2026
- Unincorporated Alachua County: effective October 1, 2026
Bay County
- Panama City Beach: effective July 1, 2026
Brevard County
- Cocoa: effective July 1, 2026
- Indian Harbour Beach: effective July 1, 2026
- Malabar: effective October 1, 2026
- Melbourne: effective August 7, 2026
- Palm Bay: effective September 23, 2026
Broward County
- Coral Springs: effective July 1, 2026
- Davie: effective October 1, 2026
- Fort Lauderdale: effective August 28, 2026
- Hallandale Beach: effective October 1, 2026
- Hillsboro Beach: effective July 1, 2026
- Hollywood: effective September 16, 2026
- Lauderdale-by-the-Sea: effective July 1, 2026
- Margate: effective July 1, 2026
- Miramar: effective September 14, 2026
- Oakland Park: effective October 1, 2026
- Parkland: effective July 1, 2026
- Pembroke Pines: effective October 1, 2026
- Pompano Beach: effective October 1, 2026
- Weston: effective October 1, 2026
Calhoun County
- Unincorporated Calhoun County: effective August 4, 2026
Clay County
- Keystone Heights: effective October 1, 2026 (uses Clay County's schedule)
- Unincorporated Clay County: effective October 1, 2026
DeSoto County
- Arcadia: effective September 8, 2026 (uses DeSoto County's schedule)
- Unincorporated DeSoto County: effective September 8, 2026
Duval County
- Atlantic Beach: effective July 13, 2026
- Neptune Beach: effective July 20, 2026
Flagler County
- Flagler Beach: effective October 1, 2026
Hardee County
- Bowling Green: effective July 1, 2026 (uses Hardee County's schedule)
- Unincorporated Hardee County: effective July 1, 2026
- Wauchula: effective July 1, 2026 (uses Hardee County's schedule)
- Zolfo Springs: effective July 1, 2026 (uses Hardee County's schedule)
Hendry County
- Unincorporated Hendry County: effective August 11, 2026
Highlands County
- Avon Park: effective October 1, 2026 (uses Highlands County's schedule)
- Lake Placid: effective October 1, 2026 (uses Highlands County's schedule)
- Sebring: effective July 7, 2026
- Unincorporated Highlands County: effective October 1, 2026
Indian River County
- Indian River Shores: effective July 1, 2026
- Orchid: effective July 1, 2026
Jefferson County
- Monticello: effective August 20, 2026 (uses Jefferson County's schedule)
- Unincorporated Jefferson County: effective August 20, 2026
Lake County
- Groveland: effective August 3, 2026
- Howey-in-the-Hills: effective August 10, 2026
- Mascotte: effective July 1, 2026
- Montverde: effective July 1, 2026
- Umatilla: effective August 4, 2026
Lee County
- Estero: effective July 2, 2026
- Fort Myers Beach: effective October 1, 2026
Madison County
- Greenville: effective August 26, 2026 (uses Madison County's schedule)
- Lee: effective August 26, 2026 (uses Madison County's schedule)
- Unincorporated Madison County: effective August 26, 2026
Manatee County
- Bradenton: effective July 1, 2026
Marion County
Martin County
- Jupiter Island: effective July 1, 2026
- Sewall's Point: effective July 1, 2026
- Stuart: effective September 14, 2026
- Unincorporated Martin County: effective July 1, 2026
Miami-Dade County
- Aventura: effective July 8, 2026
- Biscayne Park: effective July 1, 2026
- Doral: effective October 1, 2026
- Medley: effective July 6, 2026
- Miami Beach: effective October 1, 2026
- Miami Gardens: effective September 23, 2026
- Miami Springs: effective July 1, 2026
- North Bay Village: effective July 28, 2026
- South Miami: effective July 1, 2026
- Unincorporated Miami-Dade County: effective October 1, 2026
- West Miami: effective September 8, 2026
Nassau County
- Fernandina Beach: effective September 15, 2026
- Hilliard: effective August 7, 2026
Okaloosa County
Okeechobee County
- Unincorporated Okeechobee County: effective July 1, 2026
Orange County
- Belle Isle: effective October 1, 2026
- Edgewood: effective October 1, 2026 (uses Orange County's schedule)
- Maitland: effective July 1, 2026
- Unincorporated Orange County: effective October 1, 2026
- Winter Park: effective October 1, 2026
Osceola County
- St. Cloud: effective July 1, 2026
- Unincorporated Osceola County: effective October 2, 2026
Palm Beach County
- Boca Raton: effective October 1, 2026
- Boynton Beach: effective October 1, 2026
- Golf: effective July 8, 2026
- Gulf Stream: effective October 1, 2026 (uses Highland Beach's schedule)
- Highland Beach: effective October 1, 2026
- Lake Clarke Shores: effective October 13, 2026
- Lake Park: effective October 1, 2026
- Lake Worth Beach: effective October 1, 2026
- Lantana: effective October 1, 2026
- Manalapan: effective July 14, 2026
- North Palm Beach: effective July 9, 2026
- Ocean Ridge: effective July 8, 2026
- Palm Beach: effective October 13, 2026
- Palm Beach Gardens: effective October 1, 2026
- Palm Beach Shores: effective September 28, 2026
- Royal Palm Beach: effective September 17, 2026
Pasco County
- New Port Richey: effective October 1, 2026
- Unincorporated Pasco County: effective July 1, 2026
- Zephyrhills: effective July 13, 2026
Pinellas County
- Indian Shores: effective August 19, 2026
- Madeira Beach: effective September 9, 2026
- Pinellas Park: effective August 11, 2026
- Treasure Island: effective November 1, 2026
Polk County
- Lake Wales: effective October 1, 2026
- Mulberry: effective October 1, 2026
Putnam County
- Crescent City: effective October 1, 2026 (uses Putnam County's schedule)
- Palatka: effective October 1, 2026 (uses Putnam County's schedule)
- Pomona Park: effective October 1, 2026 (uses Putnam County's schedule)
- Unincorporated Putnam County: effective October 1, 2026
Seminole County
- Longwood: effective July 1, 2026
- Unincorporated Seminole County: effective July 1, 2026
St. Johns County
- St. Augustine: effective July 27, 2026
- St. Augustine Beach: effective July 1, 2026
- Unincorporated St. Johns County: effective October 1, 2026
St. Lucie County
- Unincorporated St. Lucie County: effective July 7, 2026
Volusia County
- DeLand: effective October 9, 2026
- Deltona: effective October 1, 2026
- Edgewater: effective August 3, 2026
- Holly Hill: effective October 1, 2026
- Lake Helen: effective October 1, 2026 (uses Volusia County's schedule)
- Ormond Beach: effective October 1, 2026
- Ponce Inlet: effective November 1, 2026
- South Daytona: effective October 1, 2026
- Unincorporated Volusia County: effective October 1, 2026
Older schedules re-verified under HB 803
These jurisdictions' schedules took effect before July 1, 2026, but we found evidence that they were adopted or affirmatively re-confirmed on or after the law's effective date, so they are current under HB 803 even though the fees did not change.
- Bronson
- Cooper City
- Everglades City
- Fruitland Park
- Golden Beach
- Inverness
- Juno Beach
- Marco Island
- Orange City
- Tequesta
- Unincorporated Bay County
- Unincorporated Collier County
- Unincorporated Leon County
- Unincorporated Levy County
- Winter Garden
How to check whether a fee schedule is current
Every jurisdiction page on this site names the official fee document it uses, links to it, and shows the date we last verified it. We re-check every live source weekly against the jurisdiction's own publications, and when a new schedule is adopted but not yet in effect, or a revision is pending, the page carries a notice above the fee schedule. A schedule that predates July 2026 is not necessarily out of date; many jurisdictions have not changed their fees. Before you bid a job, it is still worth asking the building department whether a revision is pending.
Common questions
Did Florida permit fees go up in 2026?
It depends on the jurisdiction and the job. HB 803 pushed schedules away from percent-of-value inspection fees toward flat fees per permit type or per-inspection pricing. That tends to lower the fee on high-value jobs and can raise it on small ones. Compare your jurisdiction's current page against your last permit rather than assuming a direction.
When does a new permit fee schedule take effect?
On the date the adopting resolution or ordinance sets. In Florida that is often October 1, the start of the local fiscal year, but schedules adopted in response to HB 803 took effect throughout the summer. The date on each entry above is the effective date we recorded from the official schedule.
How do I find out whether my city's permit fees changed?
Find your city in the list above or on the Florida permit fees by county and city page. Each page shows the schedule's source and verification date, and the calculator prices your job on the current schedule.
Are the estimates on this site the final fee?
No. They are estimates computed from the official schedule; the building department determines the fee it actually charges. For how Florida schedules are built, read Florida Building Permit Fees, Explained.