Holly Hill, FL Permit Fees (2026)
Building permit fees and building, plumbing, and mechanical/HVAC permit fees for Holly Hill, straight from the official fee schedule, with a free permit fee calculator below.
In Holly Hill, a building permit for a $50,000 remodel runs $401.38 in permit fees, an HVAC change-out $79.00, and a whole-house repipe $89.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Holly Hill City Wide Fee Schedule Effective 10/01/2026 (Resolution 2026-R-60, Exhibit A)
Covers building, plumbing, and mechanical/HVAC permits.
Apply online at the Holly Hill permit portal, or call 386-248-9420.
Schedule effective October 1, 2026. Last verified: September 27, 2026
This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed
Holly Hill Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Holly Hill
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Holly Hill building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHolly Hill Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Holly Hill building department before applying. Apply online. Phone: 386-248-9420. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Holly Hill building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Holly Hill
Holly Hill issues its own building, electrical, plumbing, mechanical, gas and roofing permits through the Building Division at City Hall. Permit applications and their supporting documents or digital plans are emailed to permitdesk@hollyhillfl.org; large signed and sealed plans are delivered to the Building and Zoning office in person or by courier with an application and a thumb drive of the digital copies if those were not already emailed. Every application needs certificates of insurance for general liability and workers compensation (or the state exemption certificate). Application forms for each trade are posted on the city's Building Permit Applications page, including a combined application covering building, electrical, mechanical and plumbing work. For commercial building permits the $60 application fee, the plan review fee and the technology fee are all due at submission. Inspections are requested through the city's Tyler self service portal. City Hall is at 1065 Ridgewood Avenue and the main number is 386-248-9420.
Sources: https://www.hollyhillfl.org/node/4922 and https://www.hollyhillfl.org/cd/page/building-permit-applications
Apply online: Holly Hill permit portal- Phone
- 386-248-9420 (City Hall main)
- Phone
- 386-248-9442 (permit tech)
- Address
- 1065 Ridgewood Avenue, Holly Hill, FL 32117
- Source
- Official contact page
Holly Hill Permit Fee FAQs
How Much Does a Building Permit Cost in Holly Hill?
How Are Permit Fees Calculated in Holly Hill?
What Surcharges Are Added to Permits in Holly Hill?
Do I Need a Permit for a Small Residential Job in Holly Hill?
Where Do These Fees Come From?
Other Jurisdictions in Volusia County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.