FreeEvery fee straight from the official city and county fee schedules. No signup.

Yavapai County, AZ Permit Fees (2026)

Building permit fees for unincorporated Yavapai County, with a free permit fee calculator. Inside city limits? Pick your city below; incorporated cities have their own fee schedules.

Unincorporated communities such as Verde Village, Village of Oak Creek and Paulden pay these county rates rather than a city schedule.

In Unincorporated Yavapai County, a building permit for a $50,000 remodel runs $1,163.01 in permit fees, a $20,000 re-roof $200.00, a $10,000 HVAC change-out $150.00, a $10,000 electrical panel upgrade or rewire $300.00, and a $10,000 whole-house repipe $300.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Yavapai County Development Services Approved Fees and Refund Policy (Building Safety and Planning fees adopted 12/4/2024, effective 1/6/2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Unincorporated Yavapai County permit portal, or call 928-771-3214.

How Unincorporated Yavapai County values a job: Building permit fees are priced on the total job valuation, taken from the county's table of 2024 ICC square-foot construction costs by occupancy and construction type, or from the licensed commercial contractor's bid price for tenant improvements and commercial trade work.

Schedule effective January 6, 2025. Last verified: October 13, 2026

Jurisdictions in Yavapai County

Jobs inside city limits are permitted by the city, not the county. Across Yavapai County's 10 covered jurisdictions, a building permit for a $50,000 remodel runs from $458.85 (Prescott) to $1,858.31 (Cottonwood).

Unincorporated Yavapai County Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Unincorporated Yavapai County

Residential (1–2 family): Above-ground water tank over 5,000 gallons, residential
$300.00 flat‡
Residential (1–2 family): Manufactured home, county permit fee
$150.00 flat‡
Commercial / 3+ units: Above-ground water tank over 5,000 gallons, commercial
$700.00 flat‡
New building, addition, remodel, or accessory building (by job value)
tiered rates by job value
Printed band bases do not reconcile: the $5,001 to $25,000 band reaches $380.00 at $25,000 but the next band prints $391.75, and $644.25 at $50,000 against $643.75 printed. Each band uses its own printed base.
Up to $5,000
$100.00
Over $5,000, up to $25,000
$100.00 plus $14.00 per additional $1,000
Over $25,000, up to $50,000
$391.75 plus $10.10 per additional $1,000
Over $50,000, up to $100,000
$643.75 plus $7.00 per additional $1,000
Over $100,000, up to $500,000
$993.75 plus $5.60 per additional $1,000
Over $500,000, up to $1,000,000
$3,233.75 plus $4.75 per additional $1,000
Over $1,000,000
$5,608.75 plus $3.65 per additional $1,000
Concrete or masonry fireplace or stove, plans required
$425.00 flat‡
Demolition of an existing structure
$150.00 flat‡
Exterior fireplace or barbecue, plans required
$425.00 flat‡
Pre-manufactured free-standing swimming pool, spa, or whirlpool
$300.00 flat‡

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Unincorporated Yavapai County

Homeowners and contractors planning a project check Unincorporated Yavapai County building permit fees here first. One sponsor per trade, $49 a month, month to month.

Run a contracting business? Leave your email and we'll send availability and how it works.

Or see sponsor details

Unincorporated Yavapai County Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

8 documented rates for this permit type; pick the one that matches your job.

$
$2,500$500,000
Estimated building permit fee
$1,163.01
Included in this total
Building Permit Fee$644.25
$391.75 + 25 × $10.10 per $1,000 over $25,000 (see the fee table above)
Printed band bases do not reconcile: the $5,001 to $25,000 band reaches $380.00 at $25,000 but the next band prints $391.75, and $644.25 at $50,000 against $643.75 printed. Each band uses its own printed base.
Zoning Clearance (Residential Remodel)$100.00‡
Plan Review Fee$418.76
Total Estimate$1,163.01
Paid when you apply, counts toward this total
Plan Check Deposit$250.00
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

‡ Awaiting confirmation from the jurisdiction.

Building permit fees are priced on the total job valuation, taken from the county's table of 2024 ICC square-foot construction costs by occupancy and construction type, or from the licensed commercial contractor's bid price for tenant improvements and commercial trade work.

Estimate only. Confirm with the Unincorporated Yavapai County building department before applying. Apply online. Phone: 928-771-3214. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Unincorporated Yavapai County

Homeowners and contractors planning a project check Unincorporated Yavapai County building permit fees here first. One sponsor per trade, $49 a month, month to month.

Run a contracting business? Leave your email and we'll send availability and how it works.

Or see sponsor details

How to Apply for a Permit in Unincorporated Yavapai County

Apply online through the Yavapai County OpenGov permit portal. The Development Services Customer Service and Permitting Unit handles intake, review, and issuance of permits for the unincorporated areas of the county. A permit technician reviews each application for completeness and contacts you for any missing information or payment. A plan check deposit is collected when plans are submitted and deducted from the total fees, and exact fees are set during plan review. Allow at least 10 to 15 days of processing after the application is complete and the initial payment is received; commercial projects and alternate construction methods may take longer. Request inspections through the OpenGov portal at least one day in advance; inspections are performed from 7:30 a.m. to 3:00 p.m., Monday through Friday. Permit technicians answer questions from 7:00 a.m. to 5:00 p.m., Monday through Friday, at 1120 Commerce Drive in Prescott (928-771-3214) and 10 S. 6th Street in Cottonwood (928-639-8151). The county accepts check, cash, Visa, MasterCard, cashier's check, and money order.

Source: Unincorporated Yavapai County application instructions

Apply online: Unincorporated Yavapai County permit portal
Building Department Contact
Address
1120 Commerce Drive, Prescott, AZ 86305 (Cottonwood office: 10 S. 6th Street, Cottonwood, AZ 86326, phone 928-639-8151)
Hours
Monday to Friday, 7:00 a.m. to 5:00 p.m.

Unincorporated Yavapai County Permit Fee FAQs

How Much Does a Building Permit Cost in Unincorporated Yavapai County?

The building permit for a $50,000 residential remodel runs $1,163.01, including the documented surcharges and minimum fees. The estimate is built from Unincorporated Yavapai County's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Unincorporated Yavapai County?

The roofing permit for a $20,000 residential re-roof runs $200.00, based on Unincorporated Yavapai County's sourced fee schedule.

How Are Permit Fees Calculated in Unincorporated Yavapai County?

A residential building permit is tiered rates by job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Unincorporated Yavapai County?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee), Plan Review Fee (Commercial Trade Permits) (65% of the permit fee) and Plan Review Fee (Fireplaces, Plans Required) (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do Verde Village and Village of Oak Creek Pay Yavapai County Permit Fees?

Yes. Verde Village, Village of Oak Creek, Paulden and Lake Montezuma are unincorporated, so a job there is permitted by Yavapai County and pays the fees on this page. Inside city limits the city's own schedule applies; pick the city above.

Where Do These Fees Come From?

Every figure on this page is sourced from Yavapai County Development Services Approved Fees and Refund Policy (Building Safety and Planning fees adopted 12/4/2024, effective 1/6/2025). See the official schedule. Last verified .
Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.