Monticello, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Monticello, straight from the official fee schedule, with a free permit fee calculator below.
Building permits, plan review, inspections, and certificates of occupancy within the City of Monticello are issued and administered by the Jefferson County Building Department; the City has no building department of its own and directs applicants to obtain (and pay for) their building permit directly from the County. Inside city limits the first-step Development Permit is issued by the City of Monticello (formal site plan review for new buildings or additions under 3,000 sq ft: $500 review fee plus $60 administrative fee, per the city's Development Fees), so the Jefferson County Planning Department development permit fees shown in these estimates likely do not apply here. See the Jefferson County fee schedule
In Monticello, a building permit for a $50,000 remodel runs $623.15 in permit fees, a $20,000 re-roof $134.00, a $10,000 HVAC change-out $119.00, a $10,000 electrical panel upgrade or rewire $104.00, and a $10,000 whole-house repipe $149.35. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorJefferson County Building Department, Schedule of Permit Fees (adopted August 20, 2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Building permits, plan review, inspections, and certificates of occupancy within the City of Monticello are issued and administered by the Jefferson County Building Department; the City has no building department of its own and directs applicants to obtain (and pay for) their building permit directly from the County. Inside city limits the first-step Development Permit is issued by the City of Monticello (formal site plan review for new buildings or additions under 3,000 sq ft: $500 review fee plus $60 administrative fee, per the city's Development Fees), so the Jefferson County Planning Department development permit fees shown in these estimates likely do not apply here. See the Jefferson County fee schedule
Apply online at the Monticello permit portal, or call (850) 342-0223.
How Monticello values a job: Job value equals the full construction cost, including labor, materials, and associated job costs; new single-family residential construction is valued at $105.00 per heated square foot (accessory structures at $25.00 per unheated square foot), per the county's Schedule of Permit Fees.
Schedule effective August 20, 2026. Last verified: September 26, 2026
This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed
Monticello Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Monticello
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Monticello building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMonticello Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
4 documented rates for this permit type; pick the one that matches your job.
Job value equals the full construction cost, including labor, materials, and associated job costs; new single-family residential construction is valued at $105.00 per heated square foot (accessory structures at $25.00 per unheated square foot), per the county's Schedule of Permit Fees.
Permit fees for Monticello are administered by Jefferson County; the fees shown are the Jefferson County schedule.
Estimate only. Confirm with the Jefferson County building department before applying. Apply online. Phone: (850) 342-0223. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Monticello building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Monticello
Inside Monticello city limits, first obtain a City Development Permit: submit a site plan and construction plans to the City Planner at Monticello City Hall, 245 S. Mulberry St., in person or by email to cityplanner@mymonticello.net, for review by the appropriate city board(s). Then take the approved Development Permit to the Jefferson County Building Department, which issues the building permit, reviews plans, and performs inspections. Apply through the county's iWorQ building permit portal (first-time users call 850-342-0223 for an access code), or in person or by mail at 445 W. Palmer Mill Road, Monticello, FL 32344. Fees are payable to Jefferson Co. B.O.C.C. by cash or check. Projects within city limits must show proof that city water and sewer are available and approved. Call 850-342-0223 to request inspections.
Source: Monticello application instructions
Apply online: Monticello permit portal- Phone
- (850) 342-0223
- Address
- 445 W. Palmer Mill Road, Monticello, FL 32344
- City Hall (Development Permit)
- 850-342-0153, 245 S. Mulberry St., Monticello, FL 32344
- City Hall Hours
- Monday-Friday 8am-5pm
- Source
- Official contact page
Monticello Permit Fee FAQs
How Much Does a Building Permit Cost in Monticello?
How Much Does a Roofing Permit Cost in Monticello?
How Are Permit Fees Calculated in Monticello?
What Surcharges Are Added to Permits in Monticello?
Do I Need a Permit for a Small Residential Job in Monticello?
Where Do These Fees Come From?
Other Jurisdictions in Jefferson County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.