Belleair Shore, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Belleair Shore, straight from the official fee schedule, with a free permit fee calculator below.
Building/electrical/plumbing/mechanical/roofing permits for Belleair Shore are issued by Pinellas County Building and Development Review Services; a Town-contracted private provider (SafeBuilt) performs a required Town land-development/floodplain pre-certification under Resolution 2022-08 before any permit application reaches the County. See the Pinellas County fee schedule
In Belleair Shore, a building permit for a $50,000 remodel runs $1,198.75 in permit fees, a re-roof $812.50, a $10,000 HVAC change-out $744.00, a $10,000 electrical panel upgrade or rewire $744.00, and a $10,000 whole-house repipe $744.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorPinellas County FY25 Adopted Budget, User Fees, Building and Development Review Services fee schedule (effective Oct. 1, 2024; carried unchanged in the FY26 Adopted Budget)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Building/electrical/plumbing/mechanical/roofing permits for Belleair Shore are issued by Pinellas County Building and Development Review Services; a Town-contracted private provider (SafeBuilt) performs a required Town land-development/floodplain pre-certification under Resolution 2022-08 before any permit application reaches the County. See the Pinellas County fee schedule
Apply online at the Belleair Shore permit portal, or call (727) 464-3888.
How Belleair Shore values a job: Pinellas County bases permit fees on the construction valuation of the work, including all labor and materials for all trades. For new construction the valuation must be at least the latest International Code Council building valuation data for the gross work area; shell buildings use at least 60 percent of that data and remodels, rehabs, and repairs at least 40 percent.
Schedule effective October 1, 2024. Last verified: September 16, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Belleair Shore Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Belleair Shore
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Belleair Shore building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBelleair Shore Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Belleair Shore are the same either way.
8 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Pinellas County bases permit fees on the construction valuation of the work, including all labor and materials for all trades. For new construction the valuation must be at least the latest International Code Council building valuation data for the gross work area; shell buildings use at least 60 percent of that data and remodels, rehabs, and repairs at least 40 percent.
Permit fees for Belleair Shore are administered by Pinellas County; the fees shown are the Pinellas County schedule.
Estimate only. Confirm with the Pinellas County building department before applying. Apply online. Phone: (727) 464-3888. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Belleair Shore building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Belleair Shore
Belleair Shore has no building department. Before applying for a permit, complete the Town's Pre-Permit Application, pay the Town's $500 site plan review fee online through the Town's Payments page, and email the application and receipt to clerk@belleairshore.com and bcooper@safebuilt.com. Send plans and a survey to SafeBuilt (17985 Gulf Blvd., Redington Shores), which reviews them for the Town and issues the Town's compliance letter. With that letter, apply to Pinellas County Building and Development Review Services through the county's Access Portal, which issues the permit and performs all inspections. Schedule inspections with Pinellas County through the same portal.
Source: Belleair Shore application instructions
Apply online: Belleair Shore permit portal- Phone
- (727) 464-3888 (Pinellas County Building Services); Town office (727) 593-9296
- clerk@belleairshore.com (Town pre-permit); bcooper@safebuilt.com (Town site plan review)
- Address
- Pinellas County Building and Development Review Services, 440 Court Street, Clearwater, FL 33756
- Hours
- Monday to Friday, 8 a.m. to 4 p.m.
- Source
- https://pinellas.gov/building-departments-in-pinellas-county/ ; https://belleairshore.com/building-services/
Belleair Shore Permit Fee FAQs
How Much Does a Building Permit Cost in Belleair Shore?
How Much Does a Roofing Permit Cost in Belleair Shore?
How Are Permit Fees Calculated in Belleair Shore?
What Surcharges Are Added to Permits in Belleair Shore?
Do I Need a Permit for a Small Residential Job in Belleair Shore?
Where Do These Fees Come From?
Other Jurisdictions in Pinellas County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.