Belleair Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Belleair Beach, straight from the official fee schedule, with a free permit fee calculator below.
Permit fees for Belleair Beach are administered by Pinellas County Building and Development Review Services under an Interlocal Agreement (Pinellas County serves as the city's building department for permitting and inspections). Before applying to the county, you must register with the city and obtain its pre-permit approval, which carries a separate city fee by project type. Confirm current city fees with Belleair Beach City Hall at (727) 595-4646. See the Pinellas County fee schedule
In Belleair Beach, a building permit for a $50,000 remodel runs $898.75 in permit fees, a re-roof $352.50, a $10,000 HVAC change-out $284.00, a $10,000 electrical panel upgrade or rewire $244.00, and a $10,000 whole-house repipe $244.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorPinellas County FY25 Adopted Budget, User Fees, Building and Development Review Services fee schedule (effective Oct. 1, 2024; carried unchanged in the FY26 Adopted Budget)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Permit fees for Belleair Beach are administered by Pinellas County Building and Development Review Services under an Interlocal Agreement (Pinellas County serves as the city's building department for permitting and inspections). Before applying to the county, you must register with the city and obtain its pre-permit approval, which carries a separate city fee by project type. Confirm current city fees with Belleair Beach City Hall at (727) 595-4646. See the Pinellas County fee schedule
Apply online at the Belleair Beach permit portal, or call (727) 464-3888.
How Belleair Beach values a job: Pinellas County bases permit fees on the construction valuation of the work, including all labor and materials for all trades. For new construction the valuation must be at least the latest International Code Council building valuation data for the gross work area; shell buildings use at least 60 percent of that data and remodels, rehabs, and repairs at least 40 percent.
Schedule effective October 1, 2024. Last verified: September 16, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Belleair Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Belleair Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Belleair Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageBelleair Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Belleair Beach are the same either way.
8 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Pinellas County bases permit fees on the construction valuation of the work, including all labor and materials for all trades. For new construction the valuation must be at least the latest International Code Council building valuation data for the gross work area; shell buildings use at least 60 percent of that data and remodels, rehabs, and repairs at least 40 percent.
Permit fees for Belleair Beach are administered by Pinellas County; the fees shown are the Pinellas County schedule.
Estimate only. Confirm with the Pinellas County building department before applying. Apply online. Phone: (727) 464-3888. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Belleair Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Belleair Beach
Belleair Beach contracts with Pinellas County Building and Development Review Services for building permits and inspections. Before applying to the county, register with the City of Belleair Beach and submit its Pre-Permit Application and Pre-Construction Permit Application by email to permits@cityofbelleairbeach.com or in person at City Hall, 444 Causeway Blvd. Once the city approves, submit the approved city paperwork with your building permit application to Pinellas County through the Pinellas County Access Portal. Schedule county inspections by calling (727) 453-4000; the cut-off for next-day inspections is 3:30 p.m.
Source: Belleair Beach application instructions
Apply online: Belleair Beach permit portal- Phone
- (727) 464-3888 (Pinellas County Building Services); City pre-permit (727) 595-4646
- BuildingServices@pinellas.gov; City pre-permit permits@cityofbelleairbeach.com
- Address
- 440 Court Street, Clearwater, FL 33756 (county); City Hall, 444 Causeway Blvd, Belleair Beach, FL 33786
- Hours
- County Monday to Friday, 8 a.m. to 4 p.m.; City Hall Monday to Friday, 9:00 a.m. to 3:30 p.m.
- Source
- Official contact page
Belleair Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Belleair Beach?
How Much Does a Roofing Permit Cost in Belleair Beach?
How Are Permit Fees Calculated in Belleair Beach?
What Surcharges Are Added to Permits in Belleair Beach?
Do I Need a Permit for a Small Residential Job in Belleair Beach?
Where Do These Fees Come From?
Other Jurisdictions in Pinellas County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.