Pinellas Park, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Pinellas Park, straight from the official fee schedule, with a free permit fee calculator below.
In Pinellas Park, a building permit for a $50,000 remodel runs $597.18 in permit fees, a $20,000 re-roof $329.11, an HVAC change-out $209.00, an electrical panel upgrade or rewire $209.00, and a whole-house repipe $209.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft job area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution No. 2026-13 (Exhibit A, Administrative Fee Schedule, Building Development Division section), City of Pinellas Park, adopted August 11, 2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Pinellas Park permit portal, or call 727-369-5647.
How Pinellas Park values a job: Valuation must be submitted with the building permit application and must not be less than the latest published ICC Construction Valuation Cost Schedule or local average.
Schedule effective August 11, 2026. Last verified: October 14, 2026
This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed
Pinellas Park Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Pinellas Park
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Pinellas Park building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PagePinellas Park Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Pinellas Park are the same either way.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
‡ Awaiting confirmation from the jurisdiction.
Valuation must be submitted with the building permit application and must not be less than the latest published ICC Construction Valuation Cost Schedule or local average.
Estimate only. Confirm with the Pinellas Park building department before applying. Apply online. Phone: 727-369-5647. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Pinellas Park building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Pinellas Park
Apply online through the City of Pinellas Park online permit portal, or in person at the Building Development Division permit counter in the Public Works / Technical Services Building, 6051 78th Avenue N. The counter is open Monday through Friday, 8 a.m. to 4:30 p.m. Contractors must first email or mail a Certificate of Insurance (general liability and workers' compensation, naming the City as certificate holder) to coi@pinellaspark.gov or the Building Development Division. Most projects need plan review before the permit is issued. Request inspections by emailing inspections@pinellaspark.gov.
Source: Pinellas Park application instructions
Apply online: Pinellas Park permit portal- Phone
- 727-369-5647
- Address
- Building Development Division, 6051 78th Avenue N, Pinellas Park, FL 33781
- Hours
- Monday to Friday, 8:00 a.m. to 4:30 p.m.
- Source
- Official contact page
Pinellas Park Permit Fee FAQs
How Much Does a Building Permit Cost in Pinellas Park?
How Much Does a Roofing Permit Cost in Pinellas Park?
How Are Permit Fees Calculated in Pinellas Park?
What Surcharges Are Added to Permits in Pinellas Park?
Do I Need a Permit for a Small Residential Job in Pinellas Park?
Where Do These Fees Come From?
Other Jurisdictions in Pinellas County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.