FreeEvery fee straight from the official city and county fee schedules. No signup.

Mascotte, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Mascotte, straight from the official fee schedule, with a free permit fee calculator below.

In Mascotte, a building permit for a remodel runs $425.50 in permit fees, a $20,000 re-roof $230.00, a $10,000 HVAC change-out $144.63, a $10,000 electrical panel upgrade or rewire $127.75, and a $10,000 whole-house repipe $127.75. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Mascotte Building Dept Fee Schedule 2026 (Res. 2026-07-869 Exhibit A, adopted 7/7/2026; Updated 6/25/2026, Effective 7/1/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Mascotte permit portal, or call 352-557-8888.

Schedule effective July 1, 2026. Last verified: August 3, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Mascotte Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Mascotte

Residential (1–2 family)
$1.40 per square foot
Residential (1–2 family): Demolition
$150.00 flat
Residential (1–2 family): Dock
$500.00 flat
Residential (1–2 family): Doors and/or windows (per item count)
tiered rates by items
Up to 5 items
$200.00
Over 5, up to 10 items
$250.00
Over 10 items
$300.00
Residential (1–2 family): Foundation Stabilization
$400.00 flat
Residential (1–2 family): Manufactured Home (includes setup, electric, plumbing, and mechanical)
$1,000.00 flat
Residential (1–2 family): Manufactured Home, setup only
$600.00 flat
Residential (1–2 family): Manufactured Home, trades only
$800.00 flat
Residential (1–2 family): Pool (electric/plumbing permit included)
$1,400.00 flat
Residential (1–2 family): Pool Screen Enclosure (over pool)
$400.00 flat
Residential (1–2 family): Retaining Wall (holding land)
$800.00 flat
Residential (1–2 family): Screen fill-in (on existing concrete/roof)
$200.00 flat
Residential (1–2 family): Slab/Concrete without footer (Zoning Approval)
$200.00 flat
Residential (1–2 family): Solar PV
$500.00 flat
Residential (1–2 family): Stucco / Siding
$200.00 flat
Commercial / 3+ units
$1.40 per square foot
Commercial / 3+ units: Demolition
$200.00 flat
Commercial / 3+ units: Pool (electric/plumbing permit included)
$2,000.00 flat
Commercial / 3+ units: Sign, Monument with electric
$550.00 flat
Commercial / 3+ units: Sign, Monument without electric
$300.00 flat
Commercial / 3+ units: Sign, Wall or Window
$300.00 flat
Commercial / 3+ units: Solar PV
$600.00 flat
Administrative Fee
7.5% of the permit fee plus designated fees, minimum $7.50†
Computed on the building permit fee plus the per square foot electric, plumbing and mechanical components, which together are the permit fee this schedule charges for a structure priced by floor area.
Electric component of building permit (per sq ft) (select fee rules only)
$0.15 per sq ft‡
Electronic Permitting Admin Fee
5% of the permit fee plus designated fees, minimum $5.00†
Computed on the building permit fee plus the per square foot electric, plumbing and mechanical components, which together are the permit fee this schedule charges for a structure priced by floor area.
Mechanical component of building permit (per sq ft) (select fee rules only)
$0.15 per sq ft‡
Plumbing component of building permit (per sq ft) (select fee rules only)
$0.15 per sq ft‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee plus designated fees, minimum $2.00†
Computed on the building permit fee plus the per square foot electric, plumbing and mechanical components, which together are the permit fee this schedule charges for a structure priced by floor area.
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee plus designated fees, minimum $2.00†
Computed on the building permit fee plus the per square foot electric, plumbing and mechanical components, which together are the permit fee this schedule charges for a structure priced by floor area.
Private Provider Rebate (Commercial) (with a private provider for plan review and inspections)
may reduce the permit fee by 50%†
The schedule prints a 50% private provider rebate as a reduction of permit fees without naming the service; applied here only when a private provider does both plan review and inspections.
Private Provider Rebate (Residential) (with a private provider for plan review and inspections)
may reduce the permit fee by 20%†
The schedule prints a 20% private provider rebate as a reduction of permit fees without naming the service; applied here only when a private provider does both plan review and inspections.
Failed Inspection Fee (Re-Inspection) (if applicable)
$75.00
Gas component of building permit (per sq ft) (select fee rules only) (if applicable)
$0.15 per sq ft‡
Revision / Re-Review (Commercial) (if applicable)
$100.00
Revision / Re-Review (Residential) (if applicable)
$75.00
Temporary Certificate of Occupancy (if applicable)
$250.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Mascotte

Homeowners and contractors planning a project check Mascotte building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Mascotte Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Mascotte are the same either way.

Job type

15 documented rates for this permit type; pick the one that matches your job.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

sq ft
505,000 sq ft
Estimated building permit fee
$425.50
Included in this total
Building Permit Fee$280.00
200 square feet × $1.40 per square foot
Electric Component of Building Permit (Per Sq Ft)$30.00‡
Mechanical Component of Building Permit (Per Sq Ft)$30.00‡
Plumbing Component of Building Permit (Per Sq Ft)$30.00‡
Administrative Fee$27.75
Electronic Permitting Admin Fee$18.50
State Building Code Administrators Surcharge (F.S. 468.631)$5.55
State Building Permit Surcharge (F.S. 553.721)$3.70
Total Estimate$425.50

‡ Awaiting confirmation from the jurisdiction.

Estimate only. Confirm with the Mascotte building department before applying. Apply online. Phone: 352-557-8888. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Mascotte

Homeowners and contractors planning a project check Mascotte building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Mascotte

Apply for building permits online through the City of Mascotte's iWorQ permit portal, where you can also pay fees, check permit status, and view submittal requirements. All plan reviews are electronic and need digital signatures from the design professional; paper plans are no longer accepted. Incomplete applications are rejected, so follow the checklist included with each application. Schedule inspections through the same portal; the cutoff for next-business-day inspections is 2:00 pm. Contractors must register first by emailing their license, general liability, and workers' compensation documents to Permits@CityofMascotte.com.

Source: Mascotte application instructions

Apply online: Mascotte permit portal
Building Department Contact
Phone
352-557-8888 ext. 111
Address
100 E Myers Blvd, Mascotte, FL 34753
Hours
Monday through Thursday, 7:00 am to 5:30 pm (closed Friday)

Mascotte Permit Fee FAQs

How Much Does a Building Permit Cost in Mascotte?

The building permit for a residential remodel runs $425.50, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from Mascotte's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Mascotte?

The roofing permit for a $20,000 residential re-roof runs $230.00, based on Mascotte's sourced fee schedule.

How Are Permit Fees Calculated in Mascotte?

A residential building permit is $1.40 per square foot. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Mascotte?

On top of the base permit fee, the sourced schedule adds Administrative Fee (7.5% of the permit fee plus designated fees, minimum $7.50), Electronic Permitting Admin Fee (5% of the permit fee plus designated fees, minimum $5.00), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee plus designated fees, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee plus designated fees, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Mascotte?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Mascotte Building Dept Fee Schedule 2026 (Res. 2026-07-869 Exhibit A, adopted 7/7/2026; Updated 6/25/2026, Effective 7/1/2026). See the official schedule. Last verified .

Other Jurisdictions in Lake County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.