Groveland, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Groveland, straight from the official fee schedule, with a free permit fee calculator below.
In Groveland, a building permit for a remodel runs $399.50 in permit fees, a $20,000 re-roof $235.00, a $10,000 HVAC change-out $235.00, a $10,000 electrical panel upgrade or rewire $235.00, and a $10,000 whole-house repipe $235.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Groveland Revised Fee Schedule, Building Services, adopted by Resolution 2026-48 on August 3, 2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Groveland permit portal, or call 352-429-2141.
Schedule effective August 3, 2026. Last verified: September 25, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Groveland Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Groveland
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Groveland building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGroveland Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
13 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
Estimate only. Confirm with the Groveland building department before applying. Apply online. Phone: 352-429-2141. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Groveland building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Groveland
Groveland's Building Division issues its own permits through the eTRAKiT portal. Licensed contractors who register for eTRAKiT can apply and pay for simple building permits online; other permits are submitted to the Building Division counter at 6825 SR 50, 2nd floor, or by mail or email to permitting@groveland-fl.gov. Building inspections are scheduled through eTRAKiT, and fire inspections by calling the Fire Inspector at 352-467-0493.
Source: Groveland application instructions
Apply online: Groveland permit portal- Phone
- 352-429-2141, option 2
- Address
- 6825 SR 50, 2nd Floor, Groveland, FL 34736
- Hours
- Monday to Thursday 8 am to 5 pm; Friday 8 am to 3 pm (remote 3 pm to 5 pm)
- Source
- Official contact page
Groveland Permit Fee FAQs
How Much Does a Building Permit Cost in Groveland?
How Much Does a Roofing Permit Cost in Groveland?
How Are Permit Fees Calculated in Groveland?
What Surcharges Are Added to Permits in Groveland?
Do I Need a Permit for a Small Residential Job in Groveland?
Where Do These Fees Come From?
Other Jurisdictions in Lake County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.