FreeEvery fee straight from the official city and county fee schedules. No signup.

Groveland, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Groveland, straight from the official fee schedule, with a free permit fee calculator below.

In Groveland, a building permit for a remodel runs $399.50 in permit fees, a $20,000 re-roof $235.00, a $10,000 HVAC change-out $235.00, a $10,000 electrical panel upgrade or rewire $235.00, and a $10,000 whole-house repipe $235.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Groveland Revised Fee Schedule, Building Services, adopted by Resolution 2026-48 on August 3, 2026

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Groveland permit portal, or call 352-429-2141.

Schedule effective August 3, 2026. Last verified: September 25, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Groveland Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Groveland

Residential (1–2 family) (remodel/alteration)
$1.25 per sq ft
Residential (1–2 family) (new construction)
$1.25 per sq ft
Residential (1–2 family): Demolition
$400.00 flat
Residential (1–2 family): Dock
$600.00 flat
Residential (1–2 family): Foundation stabilization or slab with footer
$400.00 flat
Residential (1–2 family): Mobile home or park model
$400.00 flat
Residential (1–2 family): Pool
$1,000.00 flat
Residential (1–2 family): Pool enclosure
$400.00 flat
Residential (1–2 family): Prebuilt shed
$400.00 flat
Residential (1–2 family): Replacement windows and doors
$200.00 flat
Residential (1–2 family): Retaining wall
$400.00 flat
Residential (1–2 family): Screen in-fill
$400.00 flat
Residential (1–2 family): Screen room with concrete
$600.00 flat
Residential (1–2 family): Solar PV
$600.00 flat‡
Commercial / 3+ units (remodel/alteration)
$1.45 per sq ft
Commercial / 3+ units (new construction)
$1.45 per sq ft
Commercial / 3+ units: Demolition
$400.00 flat
Commercial / 3+ units: Dock
$1,000.00 flat
Commercial / 3+ units: Foundation stabilization or slab with footer
$400.00 flat
Commercial / 3+ units: Pool
$5,000.00 flat
Commercial / 3+ units: Replacement windows and doors
$300.00 flat
Commercial / 3+ units: Retaining wall
$800.00 flat
Commercial / 3+ units: Solar PV
$1,500.00 flat‡
Electric component of building permit (per sq ft) (select fee rules only)
$0.15 per sq ft‡
Mechanical component of building permit (per sq ft) (select fee rules only)
$0.15 per sq ft‡
Permit Administrative Fee
15% of the permit fee plus designated fees†
The schedule states 15% of the total permit fees, computed here on the building permit fee plus the per square foot electric, plumbing and mechanical components.
Plumbing component of building permit (per sq ft) (select fee rules only)
$0.15 per sq ft‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee plus designated fees, minimum $2.00†
Computed on the building permit fee plus the per square foot electric, plumbing and mechanical components, which together are the permit fee this schedule charges for a structure priced by floor area.
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee plus designated fees, minimum $2.00†
Computed on the building permit fee plus the per square foot electric, plumbing and mechanical components, which together are the permit fee this schedule charges for a structure priced by floor area.
Private provider inspections reduction
may reduce the permit fee by 25%‡
Private provider plan review reduction
may reduce the permit fee by 25%‡
Early Start Permit (if applicable)
$250.00
Gas component of building permit (per sq ft) (select fee rules only) (if applicable)
$0.15 per sq ft‡
CRA Fee (Community Redevelopment Area) (if applicable)
$100.00‡
Electronic Filing Fee (Optional) (if applicable)
15% of the permit fee‡
Plan Re-Review Fee (Commercial, Optional) (if applicable)
$100.00 (printed as $100 per page)
Plan Re-Review Fee (Residential, Optional) (if applicable)
$100.00 (printed as $100 per document)
Utility Plan Review Fee (Commercial, Optional) (if applicable)
$640.00‡
Reinspection Fee (if applicable)
$85.00
Revision Fee (Residential, Optional) (if applicable)
$100.00 (printed as $100 per document)‡

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Groveland

Homeowners and contractors planning a project check Groveland building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Groveland Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

13 documented rates for this permit type; pick the one that matches your job.

sq ft
505,000 sq ft
Estimated building permit fee
$399.50
Included in this total
Building Permit Fee$250.00
200 sq ft × $1.25 per sq ft
Electric Component of Building Permit (Per Sq Ft)$30.00‡
Mechanical Component of Building Permit (Per Sq Ft)$30.00‡
Plumbing Component of Building Permit (Per Sq Ft)$30.00‡
Permit Administrative Fee$51.00
State Building Code Administrators Surcharge (F.S. 468.631)$5.10
State Building Permit Surcharge (F.S. 553.721)$3.40
Private provider reductions (F.S. 553.791), not applied: 25% of the permit fee‡ with a private provider for inspections; 25% of the permit fee‡ with a private provider for plan review. Confirm eligibility and reduced figures with the building department.
Total Estimate$399.50

‡ Awaiting confirmation from the jurisdiction.

Estimate only. Confirm with the Groveland building department before applying. Apply online. Phone: 352-429-2141. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Groveland

Homeowners and contractors planning a project check Groveland building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Groveland

Groveland's Building Division issues its own permits through the eTRAKiT portal. Licensed contractors who register for eTRAKiT can apply and pay for simple building permits online; other permits are submitted to the Building Division counter at 6825 SR 50, 2nd floor, or by mail or email to permitting@groveland-fl.gov. Building inspections are scheduled through eTRAKiT, and fire inspections by calling the Fire Inspector at 352-467-0493.

Source: Groveland application instructions

Apply online: Groveland permit portal
Building Department Contact
Phone
352-429-2141, option 2
Address
6825 SR 50, 2nd Floor, Groveland, FL 34736
Hours
Monday to Thursday 8 am to 5 pm; Friday 8 am to 3 pm (remote 3 pm to 5 pm)

Groveland Permit Fee FAQs

How Much Does a Building Permit Cost in Groveland?

The building permit for a residential remodel runs $399.50, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from Groveland's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Groveland?

The roofing permit for a $20,000 residential re-roof runs $235.00, based on Groveland's sourced fee schedule.

How Are Permit Fees Calculated in Groveland?

A residential building permit is $1.25 per sq ft. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Groveland?

On top of the base permit fee, the sourced schedule adds Permit Administrative Fee (15% of the permit fee plus designated fees), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee plus designated fees, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee plus designated fees, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Groveland?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Groveland Revised Fee Schedule, Building Services, adopted by Resolution 2026-48 on August 3, 2026. See the official schedule. Last verified .

Other Jurisdictions in Lake County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.