Mount Dora, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Mount Dora, straight from the official fee schedule, with a free permit fee calculator below.
In Mount Dora, a building permit for a $50,000 remodel runs $488.13 in permit fees, a $20,000 re-roof $179.25, a $10,000 HVAC change-out $124.00, a $10,000 electrical panel upgrade or rewire $124.00, and a $10,000 whole-house repipe $124.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Mount Dora Fee Schedule for Building Department (Effective 10/1/2025, revised 10/2/2025), pp.1-14; stapled with Meter and Impact Fees (Effective 1/1/2026, revised 1/8/2026), pp.15-23 [not used, out of scope]
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Mount Dora values a job: New one- and two-family residential construction and additions are valued using ICC (International Code Council) Building Valuation Data (value per square foot by construction type) multiplied by total square footage, rather than contractor-stated project cost.
Schedule effective October 1, 2025. Last verified: August 3, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Mount Dora Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Mount Dora
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Mount Dora building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMount Dora Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
New one- and two-family residential construction and additions are valued using ICC (International Code Council) Building Valuation Data (value per square foot by construction type) multiplied by total square footage, rather than contractor-stated project cost.
Estimate only. Confirm with the Mount Dora building department before applying.
Homeowners and contractors planning a project check Mount Dora building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMount Dora Permit Fee FAQs
How Much Does a Building Permit Cost in Mount Dora?
How Much Does a Roofing Permit Cost in Mount Dora?
How Are Permit Fees Calculated in Mount Dora?
What Surcharges Are Added to Permits in Mount Dora?
Do I Need a Permit for a Small Residential Job in Mount Dora?
Where Do These Fees Come From?
Other Jurisdictions in Lake County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.