FreeEvery fee straight from the official city and county fee schedules. No signup.

Lady Lake, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Lady Lake, straight from the official fee schedule, with a free permit fee calculator below.

In Lady Lake, a building permit for a $50,000 remodel runs $104.00 in permit fees, a $20,000 re-roof $104.00, a $10,000 HVAC change-out $104.00, a $10,000 electrical panel upgrade or rewire $104.00, and a $10,000 whole-house repipe $104.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Town of Lady Lake, FL - Permit Fee Schedule (official webpage, New Fees Effective 01/01/2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective January 1, 2025. Last verified: August 3, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Lady Lake Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Lady Lake

Driveway
$50.00 flat
Residential (1–2 family)
$0.30 per square foot, minimum $100.00
Residential (1–2 family)
$1,250.00 flat
Residential (1–2 family): Demolition
$110.00 flat
Residential (1–2 family): Fence - Fix or Replace (Like for Like)
$25.00 flat
Residential (1–2 family): Fence - New
$75.00 flat
Residential (1–2 family): Solar Panels
$150.00 flat
Residential (1–2 family): Swimming Pool - Above-Ground / Spa
$75.00 flat
Residential (1–2 family): Swimming Pool - In-Ground (Private)
$300.00 flat
Commercial / 3+ units
$0.47 per square foot, minimum $150.00
Commercial / 3+ units
$0.57 per square foot, minimum $150.00
Commercial / 3+ units: Demolition (per Parcel)
$150.00 flat
Commercial / 3+ units: Fence - Commercial
$150.00 flat
Commercial / 3+ units: Solar Panels
$225.00 flat
Commercial / 3+ units: Swimming Pool - Commercial
$350.00 flat
FL Building Code Administration (BCA) Surcharge
1.5% of the permit fee, minimum $2.00
FL DBPR Surcharge
1% of the permit fee, minimum $2.00
Sponsor This Page
Be the Featured General Contractor in Lady Lake

Homeowners and contractors planning a project check Lady Lake building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lady Lake Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
square foot
505,000 square foot
Estimated building permit fee
$104.00
Building permit fee$60.00
200 square foots × $0.30 per square foot
Minimum permit fee adjustment$40.00
Minimum permit fee: $100.00
FL Building Code Administration (BCA) Surcharge$2.00
FL DBPR Surcharge$2.00
Total Estimate$104.00

Estimate only. Confirm with the Lady Lake building department before applying.

Sponsor This Page
Be the Featured General Contractor in Lady Lake

Homeowners and contractors planning a project check Lady Lake building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lady Lake Permit Fee FAQs

How Much Does a Building Permit Cost in Lady Lake?

The building permit for a $50,000 residential remodel runs $104.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Lady Lake's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Lady Lake?

The roofing permit for a $20,000 residential re-roof runs $104.00, based on Lady Lake's sourced fee schedule.

How Are Permit Fees Calculated in Lady Lake?

A residential building permit is $0.30 per square foot, minimum $100.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Lady Lake?

On top of the base permit fee, the sourced schedule adds FL Building Code Administration (BCA) Surcharge (1.5% of the permit fee, minimum $2.00) and FL DBPR Surcharge (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Lady Lake?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Lady Lake, FL - Permit Fee Schedule (official webpage, New Fees Effective 01/01/2025). See the official schedule. Last verified .

Other Jurisdictions in Lake County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.