FreeEvery fee straight from the official city and county fee schedules. No signup.

Umatilla, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Umatilla, straight from the official fee schedule, with a free permit fee calculator below.

In Umatilla, a building permit for a $50,000 remodel runs $154.25 in permit fees, a $20,000 re-roof $184.70, a $10,000 HVAC change-out $179.25, a $10,000 electrical panel upgrade or rewire $179.25, and a $10,000 whole-house repipe $179.25. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, and a 200 sq ft job area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

City of Umatilla Resolution No. 2026-13, Fee Schedule Update, Exhibit A, Building Services Fee Schedule (adopted 8/4/2026), Aug 4, 2026 Regular City Council Meeting agenda packet (CivicClerk fileId 682)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Schedule effective August 4, 2026. Last verified: September 6, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Umatilla Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Umatilla

Residential (1–2 family)
$0.35 per square foot, minimum $150.00
Residential (1–2 family)
$0.70 per square foot, minimum $150.00
Commercial / 3+ units
$0.45 per square foot, minimum $250.00
Commercial / 3+ units
$0.90 per square foot, minimum $250.00
Commercial / 3+ units: Change of Use/Occupancy (inspection required)
$250.00 flat
Commercial / 3+ units: Warehouse/Shell Structure
$0.45 per square foot, minimum $250.00
Administrative Fee – New Construction (Commercial) (new construction)
5% of the permit fee
Administrative Fee – New Construction (Residential) (new construction)
20% of the permit fee
DBPR Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
Fire Plan Review (Commercial)
50% of the permit fee
FL Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Private Provider Reduction, Commercial Inspections and Review (with a private provider for plan review and inspections)
may reduce the permit fee by 50% (Printed as "Private Provider Commercial - Inspections & Review, 50% Reduction".)
Private Provider Reduction, Commercial Inspections Only (with a private provider for inspections)
may reduce the permit fee by 25% (Printed as "Private Provider Commercial Inspections only, 25% Reduction".)

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Umatilla

Homeowners and contractors planning a project check Umatilla building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Umatilla Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
square foot
505,000 square foot
Estimated building permit fee
$154.25
Building permit fee$70.00
200 square foots × $0.35 per square foot
Minimum permit fee adjustment$80.00
Minimum permit fee: $150.00
DBPR Surcharge (F.S. 468.631)$2.25
FL Building Code Surcharge (F.S. 553.721)$2.00
Total Estimate$154.25

Estimate only. Confirm with the Umatilla building department before applying.

Sponsor This Page
Be the Featured General Contractor in Umatilla

Homeowners and contractors planning a project check Umatilla building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Umatilla Permit Fee FAQs

How Much Does a Building Permit Cost in Umatilla?

The building permit for a $50,000 residential remodel runs $154.25, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Umatilla's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Umatilla?

The roofing permit for a $20,000 residential re-roof runs $184.70, assuming a 2,000 sq ft roof where the schedule prices per unit, based on Umatilla's sourced fee schedule.

How Are Permit Fees Calculated in Umatilla?

A residential building permit is $0.35 per square foot, minimum $150.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Umatilla?

On top of the base permit fee, the sourced schedule adds Administrative Fee – New Construction (Commercial) (5% of the permit fee), Administrative Fee – New Construction (Residential) (20% of the permit fee), DBPR Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00), Fire Plan Review (Commercial) (50% of the permit fee), FL Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00), Private Provider Reduction, Commercial Inspections and Review (may reduce the permit fee by 50% (Printed as "Private Provider Commercial - Inspections & Review, 50% Reduction".)) and Private Provider Reduction, Commercial Inspections Only (may reduce the permit fee by 25% (Printed as "Private Provider Commercial Inspections only, 25% Reduction".)). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Umatilla?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Umatilla Resolution No. 2026-13, Fee Schedule Update, Exhibit A, Building Services Fee Schedule (adopted 8/4/2026), Aug 4, 2026 Regular City Council Meeting agenda packet (CivicClerk fileId 682). See the official schedule. Last verified .

Other Jurisdictions in Lake County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.