FreeEvery fee straight from the official city and county fee schedules. No signup.

Pompano Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Pompano Beach, straight from the official fee schedule, with a free permit fee calculator below.

In Pompano Beach, a building permit for a $50,000 remodel runs $1,435.38 in permit fees, a $20,000 re-roof $574.15, an HVAC change-out $74.20, a $10,000 electrical panel upgrade or rewire $287.08, and a $10,000 whole-house repipe $287.08. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Pompano Beach Building Department Fee Schedule (Updated 2/10/26), online fee schedule, and FY 2026 Rates and Fees

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $65.00.

Apply online at the Pompano Beach permit portal, or call 954-786-4669.

Last verified: September 25, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Pompano Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Pompano Beach

Without zoning review (remodel/alteration)
tiered rates by job value
Up to $250,000
$0.00 plus $27.50 per additional $1,000
Over $250,000, up to $500,000
$6,875.00 plus $26.50 per additional $1,000
Over $500,000, up to $1,000,000
$13,500.00 plus $25.50 per additional $1,000
Over $1,000,000, up to $5,000,000
$26,250.00 plus $24.50 per additional $1,000
Over $5,000,000, up to $10,000,000
$124,250.00 plus $23.50 per additional $1,000
Over $10,000,000
$241,750.00 plus $22.50 per additional $1,000
With zoning review (new construction)
tiered rates by job value
Up to $250,000
$0.00 plus $16.50 per additional $1,000
Over $250,000, up to $500,000
$4,125.00 plus $15.50 per additional $1,000
Over $500,000, up to $1,000,000
$8,000.00 plus $14.50 per additional $1,000
Over $1,000,000, up to $5,000,000
$15,250.00 plus $13.50 per additional $1,000
Over $5,000,000, up to $10,000,000
$69,250.00 plus $12.50 per additional $1,000
Over $10,000,000
$131,750.00 plus $11.50 per additional $1,000
Foundation only permit
$1.00 per sq ft (foundation)
Photovoltaic system
$260.00 for the first 10 kW, plus $10.00 per kW or fraction thereof
Temporary tent or canopy, 500 sq ft and larger
$250.00 for the first 1 tent, plus $20.00 per tent
Temporary tent or canopy, over 120 to 500 sq ft
$150.00 for the first 1 tent, plus $20.00 per tent
With zoning review (remodel/alteration)
tiered rates by job value
Up to $250,000
$0.00 plus $16.50 per additional $1,000
Over $250,000, up to $500,000
$4,125.00 plus $15.50 per additional $1,000
Over $500,000, up to $1,000,000
$8,000.00 plus $14.50 per additional $1,000
Over $1,000,000, up to $5,000,000
$15,250.00 plus $13.50 per additional $1,000
Over $5,000,000, up to $10,000,000
$69,250.00 plus $12.50 per additional $1,000
Over $10,000,000
$131,750.00 plus $11.50 per additional $1,000
Without zoning review (new construction)
tiered rates by job value
Up to $250,000
$0.00 plus $27.50 per additional $1,000
Over $250,000, up to $500,000
$6,875.00 plus $26.50 per additional $1,000
Over $500,000, up to $1,000,000
$13,500.00 plus $25.50 per additional $1,000
Over $1,000,000, up to $5,000,000
$26,250.00 plus $24.50 per additional $1,000
Over $5,000,000, up to $10,000,000
$124,250.00 plus $23.50 per additional $1,000
Over $10,000,000
$241,750.00 plus $22.50 per additional $1,000
Broward County Board of Rules and Appeals Surcharge
0.052% of job value, minimum $2.00†
Fire Prevention Fee (New Construction and Alterations)
0.5% of job value, minimum $100.00‡
Fire Prevention Technology Fee
2% of designated fees (2% of the fire prevention fee)‡
Zoning Compliance Permit Fee (select fee rules only)
tiered by job value, minimum $65.00‡
Loaded at the city's adopted zoning fee table ($9,750 base for $1,000,001 to $5,000,000); the Building Department's schedule and estimator print $9,250 for that band
Up to $250,000
$0.00 plus $11.00 per additional $1,000
Over $250,000, up to $500,000
$2,750.00 plus $10.00 per additional $1,000
Over $500,000, up to $1,000,000
$5,250.00 plus $9.00 per additional $1,000
Over $1,000,000, up to $5,000,000
$9,750.00 plus $8.00 per additional $1,000
Over $5,000,000, up to $10,000,000
$41,750.00 plus $7.00 per additional $1,000
Over $10,000,000
$76,750.00 plus $6.00 per additional $1,000
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Private Provider Reduction (Inspections Only)
may reduce the permit fee by 25%†
The city prints private provider fee tables at 75% of the standard rates
Private Provider Reduction (Plan Review and Inspections)
may reduce the permit fee by 50%†
The city prints private provider fee tables at 50% of the standard rates
Certificate of Completion (if applicable)
$5.00
Certificate of Occupancy (Commercial) (if applicable)
$250.00
Certificate of Occupancy (Residential) (if applicable)
$150.00
Change of Contractor (per discipline) (if applicable)
$100.00
Dry Run Fee Deposit (one review, incomplete submittal) (if applicable)
25% of the permit fee
Permit Card Replacement (if applicable)
$25.00
Permit Extension (before expiration) (if applicable)
100% of the permit fee, maximum $125.00 ($125.00 or the base permit fee, whichever is less)
Reinspection (Additional Disapprovals) (if applicable)
$250.00
Reinspection (First Disapproval) (if applicable)
$60.00
Submittal Fee Deposit (select fee rules only) (paid when you apply, counts toward the permit fee)
50% of the permit fee
Technology Fee (per permit number) (if applicable)
$20.00‡
Temporary or Partial Certificate of Occupancy (per unit) (if applicable)
$550.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Pompano Beach

Homeowners and contractors planning a project check Pompano Beach building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Pompano Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

6 documented rates for this permit type; pick the one that matches your job.

Using a private provider?

Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works

$
$2,500$500,000
Estimated building permit fee
$1,435.38
Included in this total
Building Permit Fee$1,375.00
$0.00 + $50,000 × $27.50 per $1,000 over $0 (see the fee table above)
Broward County Board of Rules and Appeals Surcharge$26.00
State Building Code Administrators Surcharge (F.S. 468.631)$20.63
State Building Permit Surcharge (F.S. 553.721)$13.75
Total Estimate$1,435.38
Paid when you apply, counts toward this total
Submittal Fee Deposit$687.50
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.

Estimate only. Confirm with the Pompano Beach building department before applying. Apply online. Phone: 954-786-4669. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Pompano Beach

Homeowners and contractors planning a project check Pompano Beach building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Pompano Beach

Pompano Beach runs its own Building Department. Start an application online in the city's Click2Gov permitting portal; you do not need a Click2Gov account to create an application number. You will need the project address, a detailed scope of work, contractor information, and the total estimated job value. After the application number is issued, upload all plans and documents as PDFs in the city's separate ePlan system, where every discipline reviews them at the same time. You can also apply in person at the Building Department counter on the 3rd floor of City Hall, 100 W. Atlantic Blvd.; paper documents are scanned and scanning fees apply. Fees are assessed once every review discipline approves, can be paid online, and the permit is issued electronically. Schedule inspections and view results in the Click2Gov portal at any time; inspections run Monday through Thursday, and requests submitted by midnight go on the next available inspection day.

Source: Pompano Beach application instructions

Apply online: Pompano Beach permit portal
Building Department Contact
Address
Pompano Beach City Hall, 3rd Floor, 100 W. Atlantic Blvd., Pompano Beach, FL 33060
Hours
Monday to Thursday, 7:00 AM to 6:00 PM (excluding holidays)

Pompano Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Pompano Beach?

The building permit for a $50,000 residential remodel runs $1,435.38, including the documented surcharges and minimum fees. The estimate is built from Pompano Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Pompano Beach?

The roofing permit for a $20,000 residential re-roof runs $574.15, based on Pompano Beach's sourced fee schedule.

How Are Permit Fees Calculated in Pompano Beach?

A residential building permit is tiered rates by job value. Electrical, Plumbing, and Roofing permits scale with the value of the job; Mechanical / HVAC permits are priced per ton. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Pompano Beach?

The sourced schedule sets a minimum permit fee of $65.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Pompano Beach?

On top of the base permit fee, the sourced schedule adds Fire Prevention Technology Fee (2% of designated fees (2% of the fire prevention fee)), State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Pompano Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Pompano Beach Building Department Fee Schedule (Updated 2/10/26), online fee schedule, and FY 2026 Rates and Fees. See the official schedule. Last verified .

Other Jurisdictions in Broward County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.