FreeEvery fee straight from the official city and county fee schedules. No signup.

Biscayne Park, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Biscayne Park, straight from the official fee schedule, with a free permit fee calculator below.

In Biscayne Park, a building permit for a remodel runs $1,342.00 in permit fees, a re-roof $1,112.00, an HVAC change-out $184.55, an electrical panel upgrade or rewire $184.55, and a whole-house repipe $184.55. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, and a 200 sq ft job area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Village of Biscayne Park Master Fee Schedule, Amended June 2026 (Resolution No. 2026-49, Exhibit A)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Biscayne Park permit portal, or call 305-899-8000.

Schedule effective July 1, 2026. Last verified: September 6, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Biscayne Park Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Biscayne Park

Residential (1–2 family): Alteration or Remodel (SFR or Duplex)
$6.00 per sq ft, minimum $130.00
Residential (1–2 family): New Construction (SFR or Duplex)
$12.00 per sq ft, minimum $130.00‡
Residential (1–2 family): Pool or Spa Installation, Residential
$2,000.00 flat
Residential (1–2 family): Addition (SFR or Duplex)
$12.00 per sq ft, minimum $130.00‡
Commercial / 3+ units: Pool or Spa Installation, Commercial or Multi-Family
$3,000.00 flat
Commercial / 3+ units: Storefront, Commercial (each)
$40.00 per storefront, minimum $130.00
Awnings and Canopies
$2.00 per sq ft, minimum $130.00
Backup Generator (Building Permit Portion)
$500.00 flat
Concrete Driveway, Slab, or Walkway
$0.50 per sq ft, minimum $130.00
Demolition of Building
$1,200.00 flat
Fence, Concrete (Prefab) (per linear foot)
$3.00 per linear foot, minimum $130.00
Fence, Wood, Metal, or PVC (per linear foot)
$1.50 per linear foot, minimum $130.00
Glass Doors (each)
$60.00 per glass door, minimum $130.00
Gravel Driveway
$0.20 per sq ft, minimum $130.00
Hand Rails or Balcony Rails (per linear foot)
$4.00 per linear foot, minimum $130.00
Retaining Wall (per linear foot)
$20.00 per linear foot, minimum $130.00
Screen Enclosure
$500.00 flat
Shop Drawings (Trusses, Stairs)
$275.00 flat
Skylights (each)
$90.00 per skylight, minimum $130.00
Solar Panels (Building Permit Portion)
$500.00 flat
Spa, Hot Tub, or Hydro Massage Installation
$800.00 flat
Windows (each)
$40.00 per window, minimum $130.00
Administrative Fee
$40.00†
BCAIB Surcharge
1.5% of the permit fee, minimum $2.00†
Miami-Dade County Surcharge (Legacy Per-1000 Form)
0.06% of job value‡
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Technology Fee
2.5% of the permit fee†
Training and Education Fee
1% of the permit fee†
Change of Contractor Architect or Engineer (if applicable)
$75.00
Minor plan revision (if applicable)
$250.00‡
Permit and Plan Review Fee (One Hour Minimum per Trade) (if applicable)
$95.00‡
Permit Cancellation Fee (if applicable)
$100.00
Permit Extension (One-Time, Before Expiration) (if applicable)
$125.00
Re-inspection Fee (First Occurrence) (if applicable)
$95.00
Upfront Fee (paid when you apply, counts toward the permit fee)
0.33% of the permit fee, minimum $130.00‡

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Biscayne Park

Homeowners and contractors planning a project check Biscayne Park building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Biscayne Park Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

18 documented rates for this permit type; pick the one that matches your job.

sq ft
505,000 sq ft
Estimated building permit fee
$1,342.00
Included in this total
Building Permit Fee$1,200.00
200 sq ft × $6.00 per sq ft
Administrative Fee$40.00
Miami-Dade County Surcharge (Legacy Per-1000 Form)$30.00‡
BCAIB Surcharge$18.00
State Building Permit Surcharge (F.S. 553.721)$12.00
Technology Fee$30.00
Training and Education Fee$12.00
Total Estimate$1,342.00
Paid when you apply, counts toward this total
Upfront Fee$130.00‡
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

‡ Awaiting confirmation from the jurisdiction.

Assumes a $50,000.00 total job value for valuation-based surcharges.

Estimate only. Confirm with the Biscayne Park building department before applying. Apply online. Phone: 305-899-8000. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Biscayne Park

Homeowners and contractors planning a project check Biscayne Park building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Biscayne Park

Apply for Biscayne Park building, roofing, electrical, plumbing and mechanical permits online through the CAP Plan Review Portal; register an account first, then submit your application and full plans electronically. Exterior work (such as roofs, windows and doors, fences, driveways, pools, additions and new construction) must also go before the Planning and Design Review Board, and applications for that board are due by 4 PM on the Monday one week before the meeting. Request inspections through the CAP portal or by emailing inspection@biscayneparkfl.gov by 4 PM the day before, with the permit number, address, inspection type and a contact name and phone number. Questions go to the Building Permit Coordinator at 305-899-8000 or building@biscayneparkfl.gov.

Source: Biscayne Park application instructions

Apply online: Biscayne Park permit portal
Building Department Contact
Address
600 NE 114 Street, Biscayne Park, FL 33161
Hours
Monday to Thursday 9:00am-1:00pm and 2:00pm-5:00pm; Friday 9:00am-noon (closed holidays)

Biscayne Park Permit Fee FAQs

How Much Does a Building Permit Cost in Biscayne Park?

The building permit for a residential remodel runs $1,342.00, assuming a 200 sq ft remodel area (the schedule prices per unit), including the documented surcharges and minimum fees. The estimate is built from Biscayne Park's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Biscayne Park?

The roofing permit for a residential re-roof runs $1,112.00, assuming a 2,000 sq ft roof (the schedule prices per unit), based on Biscayne Park's sourced fee schedule.

How Are Permit Fees Calculated in Biscayne Park?

A residential building permit is $6.00 per sq ft, minimum $130.00. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Biscayne Park?

On top of the base permit fee, the sourced schedule adds BCAIB Surcharge (1.5% of the permit fee, minimum $2.00), State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00), Technology Fee (2.5% of the permit fee) and Training and Education Fee (1% of the permit fee). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Biscayne Park?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Village of Biscayne Park Master Fee Schedule, Amended June 2026 (Resolution No. 2026-49, Exhibit A). See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.