Surfside, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Surfside, straight from the official fee schedule, with a free permit fee calculator below.
Surfside's Building Department posts a fee guide with lower new-construction and commercial rates than the schedule the Town Commission adopted in Resolution 2026-3494, shown here; confirm your fees with the Building Department before you apply. Miami-Dade Fire Rescue plan review and permit fees are charged separately and are not included.
In Surfside, a building permit for a $50,000 remodel runs $1,531.50 in permit fees, a $20,000 re-roof $710.25, a $10,000 HVAC change-out $252.80, a $10,000 electrical panel upgrade or rewire $361.50, and a $10,000 whole-house repipe $361.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Surfside Resolution No. 2026-3494 (adopted March 10, 2026), Exhibit A Building Department Fee Guide
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Surfside values a job: Surfside charges on the estimated cost of construction, which the Town treats as no less than $500 per square foot ($200 per square foot for a detached single-family home) unless the Building Official approves otherwise.
Schedule effective March 10, 2026. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Surfside Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Surfside
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Surfside building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSurfside Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Surfside's Building Department posts a fee guide with lower new-construction and commercial rates than the schedule the Town Commission adopted in Resolution 2026-3494, shown here; confirm your fees with the Building Department before you apply. Miami-Dade Fire Rescue plan review and permit fees are charged separately and are not included.
This fee rate is higher than in most Florida jurisdictions; it matches Surfside's official schedule as published.
Surfside charges on the estimated cost of construction, which the Town treats as no less than $500 per square foot ($200 per square foot for a detached single-family home) unless the Building Official approves otherwise.
Estimate only. Confirm with the Surfside building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Surfside building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSurfside Permit Fee FAQs
How Much Does a Building Permit Cost in Surfside?
How Much Does a Roofing Permit Cost in Surfside?
How Are Permit Fees Calculated in Surfside?
What Surcharges Are Added to Permits in Surfside?
Do I Need a Permit for a Small Residential Job in Surfside?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.