Sunny Isles Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Sunny Isles Beach, straight from the official fee schedule, with a free permit fee calculator below.
Sunny Isles Beach's own fee calculator prices multifamily (including condominium) work on the commercial bands; residential estimates here use the residential bands printed for one- and two-family work. Ask the Building Department which bands apply to a condominium unit. See the official notice
In Sunny Isles Beach, a building permit for a $50,000 remodel runs $1,535.63 in permit fees, a $20,000 re-roof $614.25, a $10,000 HVAC change-out $307.13, a $10,000 electrical panel upgrade or rewire $307.13, and a $10,000 whole-house repipe $307.13. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorSunny Isles Beach Code Chapter 156, Attachment A: Building Department's Fee Schedule (Rev. 5/2021, Ord. 2021-567)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $25.00.
Apply online at the Sunny Isles Beach permit portal, or call 305-947-2150.
How Sunny Isles Beach values a job: Sunny Isles Beach charges permit fees on the estimated cost of construction you declare, including labor and materials. The Building Department may ask for a contract or invoices and may reassess a value it considers below industry standard.
Schedule effective June 17, 2021. Last verified: September 29, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Sunny Isles Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Sunny Isles Beach
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Sunny Isles Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSunny Isles Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Sunny Isles Beach are the same either way.
‡ Awaiting confirmation from the jurisdiction.
Sunny Isles Beach's own fee calculator prices multifamily (including condominium) work on the commercial bands; residential estimates here use the residential bands printed for one- and two-family work. Ask the Building Department which bands apply to a condominium unit. See the official notice
This fee rate is higher than in most Florida jurisdictions; it matches Sunny Isles Beach's official schedule as published.
Sunny Isles Beach charges permit fees on the estimated cost of construction you declare, including labor and materials. The Building Department may ask for a contract or invoices and may reassess a value it considers below industry standard.
Estimate only. Confirm with the Sunny Isles Beach building department before applying. Apply online. Phone: 305-947-2150. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Sunny Isles Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Sunny Isles Beach
Apply online through the City of Sunny Isles Beach SmartGov permitting portal, where you submit permit applications, pay permit fees, request inspections and track plan review and inspection results. Contractors must be registered with the city and request a company access code from the Building Department (305-792-1735 or info.building@sibfl.net) before applying; work in a condominium must be applied for by a licensed contractor, and owner-builder permits are allowed only on single-family homes. Upload a completed, signed and notarized Sunny Isles Beach permit application with your plans and documents. An up-front processing fee of 30% of the estimated permit fee (minimum $25) is due when you apply and is credited toward the final permit fee. New construction and additions must first complete the Planning and Zoning Pre-Development Review in the same portal. Your contractor requests inspections through the portal.
Source: Sunny Isles Beach application instructions
Apply online: Sunny Isles Beach permit portal- Phone
- 305-947-2150 (permits: 305-792-1735)
- Address
- Government Center, 3rd Floor, 18070 Collins Avenue, Sunny Isles Beach, FL 33160
- Hours
- Monday to Friday, 7:30 am to 3:30 pm (walk-in customers must obtain a number by 3 pm)
- Source
- Official contact page
Sunny Isles Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Sunny Isles Beach?
How Much Does a Roofing Permit Cost in Sunny Isles Beach?
How Are Permit Fees Calculated in Sunny Isles Beach?
What Is the Minimum Permit Fee in Sunny Isles Beach?
What Surcharges Are Added to Permits in Sunny Isles Beach?
Do I Need a Permit for a Small Residential Job in Sunny Isles Beach?
Where Do These Fees Come From?
Other Jurisdictions in Miami-Dade County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.