Building Permit Fees in Miami Lakes, FL (2026)
In Miami Lakes, a $20,000 re-roof runs $441.40 in permit fees, a $10,000 HVAC change-out $116.74, a $10,000 electrical panel upgrade or rewire $116.74, and a $10,000 whole-house repipe $290.93. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof, a 3-ton system, 200 A service, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Town of Miami Lakes Building Department Fee Schedule (effective 10/1/2020)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Miami Lakes values a job: Miami Lakes prices most new construction by square footage rather than job value; valuation based fees use the estimated cost of construction, and the Town may require a copy of the executed construction contract as documentation.
Schedule effective October 1, 2020. Last verified: September 1, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Miami Lakes Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Miami Lakes
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Miami Lakes building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Lakes Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Miami Lakes does not have a documented building fee for this project type in our sourced data yet. Try the full calculator on the Miami Lakes page or check the official fee schedule there.
Estimate only. Confirm with the Miami Lakes building department before applying.
Homeowners and contractors planning a project check Miami Lakes building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMiami Lakes Permit Fee FAQs
How Much Is a Roofing Permit in Miami Lakes?
How Are Permit Fees Calculated in Miami Lakes?
What Surcharges Are Added to Permits in Miami Lakes?
Do I Need a Permit for a Small Residential Job in Miami Lakes?
Where Do These Fees Come From?
Compare Permit Fees Across Miami-Dade County
The same job, priced by each jurisdiction's own fee schedule. Across Miami-Dade County's 15 covered jurisdictions, a building permit for a $50,000 remodel runs from $239.47 (Unincorporated Miami-Dade County) to $2,250.00 (Pinecrest).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Miami-Dade County | $239.47 | $322.88 |
| Aventura | $295.63 | $258.00 |
| Coral Gables | $1,175.00 | $470.00 |
| Cutler Bay | n/a | n/a |
| Hialeah | $1,155.00 | $450.00 |
| Homestead | $1,567.50 | $422.00 |
| Key Biscayne | $384.75 | $614.25 |
| Miami | $418.75 | $203.50 |
| Miami Beach | $1,602.25 | $640.90 |
| Miami Gardens | $1,968.75 | $341.00 |
| Miami Lakes | n/a | $441.40 |
| Palmetto Bay | n/a | $333.36 |
| Pinecrest | $2,250.00 | $685.00 |
| South Miami | $806.25 | $752.50 |
| Sweetwater | $818.65 | $413.50 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.