FreeEvery fee straight from the official city and county fee schedules. No signup.

Golden Beach, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Golden Beach, straight from the official fee schedule, with a free permit fee calculator below.

In Golden Beach, a building permit for a $50,000 remodel runs $2,791.25 in permit fees, a $20,000 re-roof $2,314.25, a $10,000 HVAC change-out $2,042.75, a $10,000 electrical panel upgrade or rewire $2,347.75, and a $10,000 whole-house repipe $2,655.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Town of Golden Beach Resolution No. 3079.26, Amending the Town's Fiscal Year 2025-2026 Schedule of Building Permit Fees and Other Fees (adopted June 9, 2026), Exhibit A

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

How Golden Beach values a job: Golden Beach sets a minimum declared value for permit purposes of $300 per square foot for remodeling and $400 per square foot for additions, town wide (Zones 1 through 3). The value based fees below are charged on the declared value of the work.

Schedule effective June 9, 2026. Last verified: September 6, 2026

Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed

Golden Beach Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Golden Beach

All projects
$1,850.00 flat
Base Administrative Review Fee
$350.00
Building Code Compliance Fee
0.06% of job value
Building Plan Review Fee
$375.00
Educational Fund Fee
0.03% of job value
FL Building Code Administration Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
FL Building Permit Fee Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Street Sweeping Fee
0.25% of job value
Change of Contractor Fee (if applicable)
$750.00
Final Certificate of Occupancy or Completion Fee (if applicable)
$300.00
Lost Permit Card Fee (if applicable)
$125.00
Re-inspection Fee (1st or 2nd Failed Inspection) (if applicable)
$75.00
Re-inspection Fee (3rd Failed Inspection) (if applicable)
$125.00
Temporary Certificate of Occupancy Fee (if applicable)
$250.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Golden Beach

Homeowners and contractors planning a project check Golden Beach building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Golden Beach Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type

Fees in Golden Beach are the same either way.

Kind of work
$
$2,500$500,000
Estimated building permit fee
$2,791.25
Building permit fee$1,850.00
$1,850.00 flat
Base Administrative Review Fee$350.00
Building Code Compliance Fee$30.00
Building Plan Review Fee$375.00
Educational Fund Fee$15.00
FL Building Code Administration Surcharge (F.S. 468.631)$27.75
FL Building Permit Fee Surcharge (F.S. 553.721)$18.50
Street Sweeping Fee$125.00
Total Estimate$2,791.25

Golden Beach sets a minimum declared value for permit purposes of $300 per square foot for remodeling and $400 per square foot for additions, town wide (Zones 1 through 3). The value based fees below are charged on the declared value of the work.

Estimate only. Confirm with the Golden Beach building department before applying.

Sponsor This Page
Be the Featured General Contractor in Golden Beach

Homeowners and contractors planning a project check Golden Beach building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Golden Beach Permit Fee FAQs

How Much Does a Building Permit Cost in Golden Beach?

The building permit for a $50,000 residential remodel runs $2,791.25, including the documented surcharges and minimum fees. The estimate is built from Golden Beach's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Golden Beach?

The roofing permit for a $20,000 residential re-roof runs $2,314.25, based on Golden Beach's sourced fee schedule.

How Are Permit Fees Calculated in Golden Beach?

A residential building permit is $1,850.00 flat. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits are flat fees. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Golden Beach?

On top of the base permit fee, the sourced schedule adds FL Building Code Administration Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and FL Building Permit Fee Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Golden Beach?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Town of Golden Beach Resolution No. 3079.26, Amending the Town's Fiscal Year 2025-2026 Schedule of Building Permit Fees and Other Fees (adopted June 9, 2026), Exhibit A. See the official schedule. Last verified .

Other Jurisdictions in Miami-Dade County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.