Kissimmee, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Kissimmee, straight from the official fee schedule, with a free permit fee calculator below.
Kissimmee adjusts these fees every October 1 by the CPI-U under Resolution 24-2025. Figures shown are the schedule effective November 1, 2025; the October 2026 adjustment may not yet be reflected. See the official notice
In Kissimmee, a building permit for a $50,000 remodel runs $1,510.19 in permit fees, a $20,000 re-roof $618.61, a $10,000 HVAC change-out $133.90, a $10,000 electrical panel upgrade or rewire $133.90, and a $10,000 whole-house repipe $133.90. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution 24-2025 Exhibit A: Fees for Building, Mechanical, Plumbing and Electrical Permits (effective November 1, 2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Kissimmee permit portal, or call 407-518-2379.
How Kissimmee values a job: Kissimmee bases valuation fees on construction value including labor, determined from the most recent ICC building valuation data; the city's valuation may differ from your contract price.
Schedule effective November 1, 2025. Last verified: September 19, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Kissimmee Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Kissimmee
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Kissimmee building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageKissimmee Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
‡ Awaiting confirmation from the jurisdiction.
Kissimmee adjusts these fees every October 1 by the CPI-U under Resolution 24-2025. Figures shown are the schedule effective November 1, 2025; the October 2026 adjustment may not yet be reflected. See the official notice
This fee rate is higher than in most Florida jurisdictions; it matches Kissimmee's official schedule as published.
Kissimmee bases valuation fees on construction value including labor, determined from the most recent ICC building valuation data; the city's valuation may differ from your contract price.
Estimate only. Confirm with the Kissimmee building department before applying. Apply online. Phone: 407-518-2379. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Kissimmee building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Kissimmee
Kissimmee's Building Division issues building, roofing, electrical, plumbing, and mechanical permits for properties inside city limits; if your address is in unincorporated Osceola County, apply with the county instead. Apply online through the city's EnerGov Citizen Self-Service portal, where you register, submit your application and plans, pay fees, and track review status. City staff review the plans for code compliance before the permit is issued, and you download the approved documents from the portal. Request inspections through your project in the same portal by 2 p.m. the business day before; inspections run 7 a.m. to 4 p.m., Monday through Friday.
Source: Kissimmee application instructions
Apply online: Kissimmee permit portal- Phone
- 407-518-2379
- Address
- Development Services Center, 101 Church Street, Kissimmee, FL 34741
- Source
- Official contact page
Kissimmee Permit Fee FAQs
How Much Does a Building Permit Cost in Kissimmee?
How Much Does a Roofing Permit Cost in Kissimmee?
How Are Permit Fees Calculated in Kissimmee?
What Surcharges Are Added to Permits in Kissimmee?
Do I Need a Permit for a Small Residential Job in Kissimmee?
Where Do These Fees Come From?
Other Jurisdictions in Osceola County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.