St. Cloud, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for St. Cloud, straight from the official fee schedule, with a free permit fee calculator below.
In St. Cloud, a building permit for a $50,000 remodel runs $206.51 in permit fees, a $20,000 re-roof $91.55, a $10,000 HVAC change-out $94.38, a $10,000 electrical panel upgrade or rewire $87.43, and a $10,000 whole-house repipe $73.53. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of St. Cloud Building Department Fee Schedule, Exhibit "A" to Resolution No. 2026-048R (adopted 6/11/2026, effective 7/1/2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the St. Cloud permit portal, or call 407-957-7224.
How St. Cloud values a job: Valuation for the purpose of determining permit fees is based on the latest ICC Construction Square Footage Cost standards; building permit fees themselves are charged on physical square footage of the structure (everything under roof), not on a percentage of that valuation.
Schedule effective July 1, 2026. Last verified: September 30, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
St. Cloud Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in St. Cloud
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check St. Cloud building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSt. Cloud Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
Estimate only. Confirm with the St. Cloud building department before applying. Apply online. Phone: 407-957-7224. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check St. Cloud building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in St. Cloud
St. Cloud issues its own building permits through the City Building Department in Development Services. Applications are submitted online through the city's Digital Application Portal, with a separate web form for each permit type. Paper applications are accepted at the City Hall drop box, but a non-digital submittal fee of $250 applies to new single family construction and $500 to new commercial or multifamily, so applying online is the no-charge path. Permits received after 3 p.m. count as received the next business day. After issuance, the Building Permit Portal handles plan review status, inspection scheduling, document printing and payment. Inspections can also be scheduled by texting Schedule to 1-844-360-1552 or by the 24 hour inspection line at 407-979-4725, no later than 5:45 a.m. on the working day wanted.
Source: St. Cloud application instructions
Apply online: St. Cloud permit portal- Phone
- 407-957-7224
- Address
- 1300 9th Street, Atrium 2nd Floor, St. Cloud, FL 34769
- Hours
- Monday - Friday, 8:00 a.m. - 4:00 p.m.
- Source
- Official contact page
St. Cloud Permit Fee FAQs
How Much Does a Building Permit Cost in St. Cloud?
How Much Does a Roofing Permit Cost in St. Cloud?
How Are Permit Fees Calculated in St. Cloud?
What Surcharges Are Added to Permits in St. Cloud?
Do I Need a Permit for a Small Residential Job in St. Cloud?
Where Do These Fees Come From?
Other Jurisdictions in Osceola County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.