Dundee, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Dundee, straight from the official fee schedule, with a free permit fee calculator below.
The Town Commission is scheduled to vote on October 6, 2026 on a complete replacement building fee schedule. If adopted, the fees shown here will change. See the official notice
In Dundee, a building permit for a $50,000 remodel runs $655.46 in permit fees, a $20,000 re-roof $296.06, a $10,000 HVAC change-out $176.26, a $10,000 electrical panel upgrade or rewire $176.26, and a $10,000 whole-house repipe $176.26. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorTown of Dundee Building Permit Fee Schedule (October 1, 2025 - September 30, 2027), per Resolution No. 01-07 (adopted 3/13/2001, with automatic 5% biennial escalator), page-footer stamped 'Revised 3/11/2026'
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Dundee permit portal, or call (863) 438-8330.
How Dundee values a job: Chargeable valuation is based on the signed construction contract, or the Standard Building Code Evaluation Schedule if no contract is provided.
Schedule effective October 1, 2025. Last verified: September 30, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Dundee Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Dundee
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Dundee building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDundee Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
2 documented rates for this permit type; pick the one that matches your job.
‡ Awaiting confirmation from the jurisdiction.
The Town Commission is scheduled to vote on October 6, 2026 on a complete replacement building fee schedule. If adopted, the fees shown here will change. See the official notice
Chargeable valuation is based on the signed construction contract, or the Standard Building Code Evaluation Schedule if no contract is provided.
Estimate only. Confirm with the Dundee building department before applying. Apply online. Phone: (863) 438-8330. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Dundee building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Dundee
Dundee has no online permitting portal. The Development Services Department takes everything by email: download the Building Permit Application and required forms from the Town's Building Department page and return the completed packet to permits@townofdundee.com, or walk in at 124 Dundee Road during office hours. Permits are processed in the order received; a Notice of Commencement is required for jobs over $5,000, and homeowners may pull a permit only for the home they live in. Inspections are requested by email to inspections@townofdundee.com by 4:00 PM the day before the desired date, with the permit number, job site address, inspection type and date; certificates go to co-info@townofdundee.com.
Source: Dundee application instructions
Apply online: Dundee permit portal- Phone
- (863) 438-8330 (main); (863) 438-8335 ext. 223 and ext. 244 (permit technicians)
- Address
- 124 Dundee Road, Dundee, FL 33838
- Hours
- Monday through Friday, 7:00 AM to 5:00 PM
- Source
- Official contact page
Dundee Permit Fee FAQs
How Much Does a Building Permit Cost in Dundee?
How Much Does a Roofing Permit Cost in Dundee?
How Are Permit Fees Calculated in Dundee?
What Surcharges Are Added to Permits in Dundee?
Do I Need a Permit for a Small Residential Job in Dundee?
Where Do These Fees Come From?
Other Jurisdictions in Polk County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.