Davenport, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Davenport, straight from the official fee schedule, with a free permit fee calculator below.
Since July 1, 2026, single family work valued under $7,500 (excluding electrical, plumbing, mechanical, gas and structural work) may qualify for a permit exemption for a $40 administrative fee. Ask the Building Department about the exemption request form. See the official notice
In Davenport, a building permit for a $50,000 remodel runs $502.25 in permit fees, a $20,000 re-roof $274.10, a $10,000 HVAC change-out $199.00, a $10,000 electrical panel upgrade or rewire $199.00, and a $10,000 whole-house repipe $199.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Davenport Code of Ordinances, Ch. 5, Sec. 5-51 "Building permit and development review fee schedules" (codebase codified through Ord. No. 1447, adopted 4-20-2026, Supp. No. 28 Update 1; Sec. 5-51 itself last substantively amended by Ord. No. 931, § 2(Exh. A), 4-6-2020); corroborated by City of Davenport Building Department "City and County Impact Fees" handout, effective 01/01/2026
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $50.00.
Apply online at the Davenport permit portal, or call (863) 419-3300.
How Davenport values a job: New construction valuation is based on the current ICC Building Valuation Data (BVD) table; for alterations or repairs, a signed contract for the scope of work may be used.
Schedule effective April 6, 2020. Last verified: September 30, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Davenport Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Davenport
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Davenport building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageDavenport Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Since July 1, 2026, single family work valued under $7,500 (excluding electrical, plumbing, mechanical, gas and structural work) may qualify for a permit exemption for a $40 administrative fee. Ask the Building Department about the exemption request form. See the official notice
New construction valuation is based on the current ICC Building Valuation Data (BVD) table; for alterations or repairs, a signed contract for the scope of work may be used.
Estimate only. Confirm with the Davenport building department before applying. Apply online. Phone: (863) 419-3300. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Davenport building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Davenport
Davenport takes applications online through the city's iWorq Citizen's Engagement Portal. Upload all required documents before review begins; the application must be signed by a licensed qualifier or an owner builder with a notarized signature, and corporate-owned property must use a licensed contractor. Contractors and private providers register first by emailing license, liability and workers compensation certificates naming the City of Davenport to permitting@mydavenport.org. Anyone can look up permit status and inspection results in the public portal without an account. Inspections are requested through the portal, by email to buildinginspections@mydavenport.org, or by QR code; a contractor code issued at registration is required. A recorded Notice of Commencement is required at issuance for permits of $5,000 or more (mechanical $15,000).
Source: Davenport application instructions
Apply online: Davenport permit portal- Phone
- (863) 419-3300
- Address
- 201 West Magnolia Street, Davenport, FL 33837
- Hours
- Monday to Friday, 8:00 am to 5:00 pm
- Source
- Official contact page
Davenport Permit Fee FAQs
How Much Does a Building Permit Cost in Davenport?
How Much Does a Roofing Permit Cost in Davenport?
How Are Permit Fees Calculated in Davenport?
What Is the Minimum Permit Fee in Davenport?
What Surcharges Are Added to Permits in Davenport?
Do I Need a Permit for a Small Residential Job in Davenport?
Where Do These Fees Come From?
Other Jurisdictions in Polk County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.