Haines City, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Haines City, straight from the official fee schedule, with a free permit fee calculator below.
In Haines City, a building permit for a $50,000 remodel runs $875.12 in permit fees, a $20,000 re-roof $389.71, a $10,000 HVAC change-out $228.71, a $10,000 electrical panel upgrade or rewire $228.71, and a $10,000 whole-house repipe $228.71. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Haines City – Building Permit Fee Schedule (webpage, "2025 Building Permit Fee Schedule")
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Haines City values a job: Building valuation for permit fee purposes is based on the most current ICC Building Valuation Data Tables, revised every six months; fees for alterations, conversions, and modifications are based on the flat fee schedule itself.
Schedule effective January 1, 2025. Last verified: August 3, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Haines City Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Haines City
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Haines City building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHaines City Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Haines City are the same either way.
Fees in Haines City are the same either way.
Building valuation for permit fee purposes is based on the most current ICC Building Valuation Data Tables, revised every six months; fees for alterations, conversions, and modifications are based on the flat fee schedule itself.
Estimate only. Confirm with the Haines City building department before applying.
Homeowners and contractors planning a project check Haines City building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHaines City Permit Fee FAQs
How Much Does a Building Permit Cost in Haines City?
How Much Does a Roofing Permit Cost in Haines City?
How Are Permit Fees Calculated in Haines City?
What Surcharges Are Added to Permits in Haines City?
Do I Need a Permit for a Small Residential Job in Haines City?
Where Do These Fees Come From?
Other Jurisdictions in Polk County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.