Frostproof, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Frostproof, straight from the official fee schedule, with a free permit fee calculator below.
Frostproof staff told the City Council in May 2026 that this valuation-based schedule must be replaced to comply with Florida HB 399 (effective January 1, 2027), and the Council directed staff to bring a new fee proposal. No replacement had been adopted as of September 28, 2026; fees may change before January 1, 2027. See the official notice
In Frostproof, a building permit for a $50,000 remodel runs $712.18 in permit fees, a $20,000 re-roof $346.18, a $10,000 HVAC change-out $86.50, a $10,000 electrical panel upgrade or rewire $86.50, and a $10,000 whole-house repipe $86.50. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Frostproof Resolution 2019-11, Exhibit A: Building Department Permit Fees, Revised October 1, 2019 (September 16, 2019 council packet)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
How Frostproof values a job: Frostproof prices building permits on total job valuation, with the cost per square foot taken from the latest International Code Council (ICC) Building Valuation Data chart (Resolution 2019-11), so the valuation the city uses can differ from your contract price.
Schedule effective October 1, 2019. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Frostproof Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Frostproof
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
Homeowners and contractors planning a project check Frostproof building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageFrostproof Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
2 documented rates for this permit type; pick the one that matches your job.
Frostproof staff told the City Council in May 2026 that this valuation-based schedule must be replaced to comply with Florida HB 399 (effective January 1, 2027), and the Council directed staff to bring a new fee proposal. No replacement had been adopted as of September 28, 2026; fees may change before January 1, 2027. See the official notice
Frostproof prices building permits on total job valuation, with the cost per square foot taken from the latest International Code Council (ICC) Building Valuation Data chart (Resolution 2019-11), so the valuation the city uses can differ from your contract price.
Estimate only. Confirm with the Frostproof building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Frostproof building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageFrostproof Permit Fee FAQs
How Much Does a Building Permit Cost in Frostproof?
How Much Does a Roofing Permit Cost in Frostproof?
How Are Permit Fees Calculated in Frostproof?
What Surcharges Are Added to Permits in Frostproof?
Do I Need a Permit for a Small Residential Job in Frostproof?
Where Do These Fees Come From?
Other Jurisdictions in Polk County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.