Greenville, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Greenville, straight from the official fee schedule, with a free permit fee calculator below.
Building permit administration, inspections, and fees are delegated to Madison County under Greenville Code of Ordinances Sec. 8-2 (Delegation of Authority), adopted pursuant to F.S. Section 553.79(9). See the Madison County fee schedule
In Greenville, a building permit for a $50,000 remodel runs $470.75 in permit fees, a $20,000 re-roof $134.00, a $10,000 HVAC change-out $94.00, a $10,000 electrical panel upgrade or rewire $89.00, and a $10,000 whole-house repipe $109.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof, a 3-ton system, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Madison County BOCC Resolution No. 2021-07-28 (Schedule of Fees, Section III Building Permit Fees)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $55.00.
Building permit administration, inspections, and fees are delegated to Madison County under Greenville Code of Ordinances Sec. 8-2 (Delegation of Authority), adopted pursuant to F.S. Section 553.79(9). See the Madison County fee schedule
Schedule effective July 28, 2021. Last verified: September 9, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Greenville Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Greenville
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Greenville building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGreenville Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Permit fees for Greenville are administered by Madison County; the fees shown are the Madison County schedule.
Estimate only. Confirm with the Madison County building department before applying.
Homeowners and contractors planning a project check Greenville building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGreenville Permit Fee FAQs
How Much Does a Building Permit Cost in Greenville?
How Much Does a Roofing Permit Cost in Greenville?
How Are Permit Fees Calculated in Greenville?
What Is the Minimum Permit Fee in Greenville?
What Surcharges Are Added to Permits in Greenville?
Do I Need a Permit for a Small Residential Job in Greenville?
Where Do These Fees Come From?
Other Jurisdictions in Madison County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.