Building Permit Fees in Melbourne, FL (2026)
In Melbourne, a building permit for a $50,000 remodel runs $599.84 in permit fees, a $20,000 re-roof $302.58, a $10,000 HVAC change-out $204.25, a $10,000 electrical panel upgrade or rewire $204.25, and a $10,000 whole-house repipe $204.25. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
City of Melbourne Building Permit Fees (Effective July 1, 2025)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $65.00.
How Melbourne values a job: Melbourne calculates permit fees from the estimated cost of construction (the greater of the contracted price or current ICC building valuation data) applied against a tiered fee table.
Schedule effective July 1, 2025. Last verified: July 19, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Melbourne Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Melbourne
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Melbourne building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMelbourne Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Melbourne are the same either way.
Melbourne calculates permit fees from the estimated cost of construction (the greater of the contracted price or current ICC building valuation data) applied against a tiered fee table.
Estimate only. Confirm with the Melbourne building department before applying.
Homeowners and contractors planning a project check Melbourne building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageMelbourne Permit Fee FAQs
How Much Is a Building Permit in Melbourne?
How Much Is a Roofing Permit in Melbourne?
How Are Permit Fees Calculated in Melbourne?
What Is the Minimum Permit Fee in Melbourne?
What Surcharges Are Added to Permits in Melbourne?
Do I Need a Permit for a Small Residential Job in Melbourne?
Where Do These Fees Come From?
Compare Permit Fees Across Brevard County
The same job, priced by each jurisdiction's own fee schedule. Across Brevard County's 11 covered jurisdictions, a building permit for a $50,000 remodel runs from $64.00 (Indian Harbour Beach) to $717.50 (Melbourne Beach).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Brevard County | $275.10 | $175.80 |
| Cape Canaveral | $577.90 | $338.49 |
| Cocoa Beach | $367.98 | $183.69 |
| Indian Harbour Beach | $64.00 | $226.98 |
| Melbourne | $599.84 | $302.58 |
| Melbourne Beach | $717.50 | $410.00 |
| Melbourne Village | $491.33 | $202.31 |
| Rockledge | $404.88 | $174.25 |
| Satellite Beach | $550.91 | $265.24 |
| Titusville | $397.70 | $213.20 |
| West Melbourne | $472.75 | $114.00 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.