Panama City Beach, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Panama City Beach, straight from the official fee schedule, with a free permit fee calculator below.
In Panama City Beach, a building permit for a $50,000 remodel runs $247.68 in permit fees, a re-roof $129.00, a $10,000 HVAC change-out $54.00, a $10,000 electrical panel upgrade or rewire $39.00, and a $10,000 whole-house repipe $54.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Panama City Beach Building and Planning Fee Schedules (Exhibit A to Res. 26-128, eff. 7/1/26)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Panama City Beach permit portal, or call 850-233-5100.
Schedule effective July 1, 2026. Last verified: September 4, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Panama City Beach Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Panama City Beach
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Panama City Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PagePanama City Beach Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
‡ Awaiting confirmation from the jurisdiction.
Fees are charged on the value your jurisdiction assigns to the work; many use ICC square-footage valuation tables or your contract price, whichever is greater. If the assigned value is higher than your contract, the actual fee will be higher too.
Estimate only. Confirm with the Panama City Beach building department before applying. Apply online. Phone: 850-233-5100. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Panama City Beach building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Panama City Beach
Panama City Beach issues its own building, roofing, electrical, plumbing, mechanical and gas permits through the Building Division on the first floor of the Public Services Building, 17005 Panama City Beach Parkway. Download the permit application, the trade permit worksheet or the submittal packet for your project type from the city's Building Forms and Permit Applications page, and submit it with the required documents to the Building Division. Permits are issued to Florida licensed contractors registered with the city, or to qualifying owner-builders. The city's iWorQ portal is for searching permits and inspection results. Request inspections with the city's online Inspection Request form, by email to buildingdepartment@pcbfl.gov, or by phone at 850-233-5100 ext. 2601.
Source: Panama City Beach application instructions
Apply online: Panama City Beach permit portal- Phone
- 850-233-5100 ext. 2601
- Address
- 17005 Panama City Beach Parkway, Panama City Beach, FL 32413
- Hours
- Monday through Friday, 7:30 am to 4 pm
- Source
- Official contact page
Panama City Beach Permit Fee FAQs
How Much Does a Building Permit Cost in Panama City Beach?
How Much Does a Roofing Permit Cost in Panama City Beach?
How Are Permit Fees Calculated in Panama City Beach?
What Surcharges Are Added to Permits in Panama City Beach?
Do I Need a Permit for a Small Residential Job in Panama City Beach?
Where Do These Fees Come From?
Other Jurisdictions in Bay County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.