Parker, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Parker, straight from the official fee schedule, with a free permit fee calculator below.
In Parker, a building permit for a $50,000 remodel runs $250.13 in permit fees, a $20,000 re-roof $84.00, a $10,000 HVAC change-out $44.00, a $10,000 electrical panel upgrade or rewire $44.00, and a $10,000 whole-house repipe $44.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorCity of Parker Resolution No. 2014-321, Development Order Review and Building Inspection/Permit Fees (adopted February 18, 2014)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Apply online at the Parker permit portal, or call (850) 818-0213.
How Parker values a job: Parker determines construction value from the most recent International Code Council (ICC) Building Valuation Data per square foot, including the regional modifier, for all areas under roof, by type of construction and use.
Schedule effective February 18, 2014. Last verified: September 28, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Parker Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Parker
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Parker building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageParker Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Parker are the same either way.
6 documented rates for this permit type; pick the one that matches your job.
Parker determines construction value from the most recent International Code Council (ICC) Building Valuation Data per square foot, including the regional modifier, for all areas under roof, by type of construction and use.
Estimate only. Confirm with the Parker building department before applying. Apply online. Phone: (850) 818-0213. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Parker building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Parker
The City of Parker contracts with EPCI (a Code South company) for building permits, plan review and inspections. First obtain the City's Development Order (application at Parker City Hall, 1001 W. Park St.). Then assemble the packet EPCI lists on its Parker page: the Parker building application, two sets of engineered plans, a site plan showing setbacks, the Development Order, and a recorded Notice of Commencement when required. Roofing, mechanical/electrical/plumbing and demolition work use EPCI's separate application forms on the same page. Contractors must first register with EPCI; homeowners acting as their own contractor also file the owner disclosure statement. Submit the packet to EPCI at 205 W. 7th St., Panama City, FL 32401, or by email to permits@codesouth.com. No online permitting portal was found. Request inspections through the inspection request form on EPCI's Parker page or by phone at (850) 818-0213.
Source: Parker application instructions
Apply online: Parker permit portal- Phone
- (850) 818-0213
- Address
- 205 W. 7th St., Panama City, FL 32401 (EPCI, contract building department for the City of Parker)
- City Hall (Development Orders)
- (850) 871-4104, 1001 W. Park St., Parker, FL 32404
- Hours
- City Hall 7:30 A.M. to 4:30 P.M., Monday through Friday (EPCI publishes no hours)
- Source
- https://epcicodeservices.com/city-information/parker/ ; https://cityofparker.com/doing-business/permitting/
Parker Permit Fee FAQs
How Much Does a Building Permit Cost in Parker?
How Much Does a Roofing Permit Cost in Parker?
How Are Permit Fees Calculated in Parker?
What Surcharges Are Added to Permits in Parker?
Do I Need a Permit for a Small Residential Job in Parker?
Where Do These Fees Come From?
Other Jurisdictions in Bay County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.