Hawthorne, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Hawthorne, straight from the official fee schedule, with a free permit fee calculator below.
Building permits inside Hawthorne city limits are issued, inspected and charged by Alachua County's Building Division, so the county's fee schedule applies here. Apply to the City first: its $25 Zoning Certification (City Hall, 6875 SE 221st Street) is required before the county permit and is included in the building, roofing, electrical and plumbing estimates here. See the Alachua County fee schedule
In Hawthorne, a building permit for a $50,000 remodel runs $498.25 in permit fees, a $20,000 re-roof $270.50, a $10,000 HVAC change-out $134.00, a $10,000 electrical panel upgrade or rewire $243.91, and a $10,000 whole-house repipe $243.91. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorAlachua County FY26/27 Schedule of Fees and Charges for Services (FY27 Fee Schedule, Effective 10/01/2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Building permits inside Hawthorne city limits are issued, inspected and charged by Alachua County's Building Division, so the county's fee schedule applies here. Apply to the City first: its $25 Zoning Certification (City Hall, 6875 SE 221st Street) is required before the county permit and is included in the building, roofing, electrical and plumbing estimates here. See the Alachua County fee schedule
Apply online at the Hawthorne permit portal, or call 352-374-5243.
How Hawthorne values a job: Chargeable valuation is the greater of the ICC Building Valuation Data (BVD) table figure or the stated contract price for the work.
Schedule effective October 1, 2026. Last verified: September 28, 2026
This schedule took effect after Florida's HB 803 (July 2026). We check sources weekly. What HB 803 changed
Hawthorne Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Hawthorne
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Hawthorne building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHawthorne Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
7 documented rates for this permit type; pick the one that matches your job.
Applies the jurisdiction's printed fee reduction (F.S. 553.791). How it works
‡ Awaiting confirmation from the jurisdiction.
Chargeable valuation is the greater of the ICC Building Valuation Data (BVD) table figure or the stated contract price for the work.
Permit fees for Hawthorne are administered by Alachua County; the fees shown are the Alachua County schedule.
Estimate only. Confirm with the Alachua County building department before applying. Apply online. Phone: 352-374-5243. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Hawthorne building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Hawthorne
Get a Zoning Certification from Hawthorne City Hall first (6875 SE 221st Street, 352-481-2432). The City checks zoning and setbacks for new construction, re-roofs, electrical, plumbing, additions, accessory buildings and mobile homes; new construction, accessory buildings and mobile homes need a site plan. The City charges $25 for the certification. Then apply to Alachua County's Building Division, which issues and inspects building permits in Hawthorne, through the county's Citizenserve online portal or in person at the County Annex Building, 10 SW 2nd Avenue, Gainesville. County staff review each application and email you when payment is due, and you schedule inspections through Citizenserve.
Source: Hawthorne application instructions
Apply online: Hawthorne permit portal- Phone
- 352-374-5243
- Address
- Alachua County Building Division, County Annex Building, 1st Floor, 10 SW 2nd Avenue, Gainesville, FL 32601
- Hours
- Monday to Thursday 8:00 am to 4:00 pm; Friday 8:00 am to 1:00 pm
- Zoning Certification
- City of Hawthorne City Hall, 6875 SE 221st Street, Hawthorne, FL 32640, 352-481-2432
- Source
- Official contact page
Hawthorne Permit Fee FAQs
How Much Does a Building Permit Cost in Hawthorne?
How Much Does a Roofing Permit Cost in Hawthorne?
How Are Permit Fees Calculated in Hawthorne?
What Surcharges Are Added to Permits in Hawthorne?
Do I Need a Permit for a Small Residential Job in Hawthorne?
Where Do These Fees Come From?
Other Jurisdictions in Alachua County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.