Building Permit Fees in Estero, FL (2026)
In Estero, a building permit for a $50,000 remodel runs $256.25 in permit fees, a $20,000 re-roof $256.25, a $10,000 HVAC change-out $179.63, a $10,000 electrical panel upgrade or rewire $230.63, and a $10,000 whole-house repipe $230.63. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Village of Estero Resolution No. 2026-13, Exhibit "A", Building Department Fee Schedule (Revised July 2, 2026); combined into one PDF with Resolution No. 2025-28 Exhibit "B", Planning, Zoning and Land Use Fee Schedule (Dec 3, 2025), which is out of scope (zoning/land-use, not a building-permit trade fee)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Schedule effective July 2, 2026. Last verified: August 26, 2026
Schedule adopted under Florida's HB 803 permit fee rules (effective July 2026). What HB 803 changed
Estero Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Estero
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Estero building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageEstero Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Estimate only. Confirm with the Estero building department before applying.
Homeowners and contractors planning a project check Estero building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageEstero Permit Fee FAQs
How Much Is a Building Permit in Estero?
How Much Is a Roofing Permit in Estero?
How Are Permit Fees Calculated in Estero?
What Surcharges Are Added to Permits in Estero?
Do I Need a Permit for a Small Residential Job in Estero?
Where Do These Fees Come From?
Compare Permit Fees Across Lee County
The same job, priced by each jurisdiction's own fee schedule. Across Lee County's 7 covered jurisdictions, a building permit for a $50,000 remodel runs from $224.40 (Cape Coral) to $1,302.58 (Fort Myers).
| Jurisdiction | Building permit ($50k remodel) | Roofing permit ($20k re-roof) |
|---|---|---|
| Unincorporated Lee County | $1,248.38 | $214.00 |
| Bonita Springs | $815.37 | $255.00 |
| Cape Coral | $224.40 | n/a |
| Estero | $256.25 | $256.25 |
| Fort Myers | $1,302.58 | $157.00 |
| Fort Myers Beach | $871.25 | $358.75 |
| Sanibel | $304.25 | $560.00 |
Estimates from each jurisdiction's sourced fee schedule, surcharges and minimum fees included. Where a schedule prices by unit, figures assume a 200 sq ft remodel area and a 2,000 sq ft roof. "n/a" means the fee isn't documented in our sourced data.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026.