FreeEvery fee straight from the official city and county fee schedules. No signup.

Maricopa, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Maricopa, straight from the official fee schedule, with a free permit fee calculator below.

In Maricopa, a building permit for a $50,000 remodel runs $1,319.90 in permit fees, a $20,000 re-roof $705.70, a $10,000 HVAC change-out $440.10, a $10,000 electrical panel upgrade or rewire $440.10, and a $10,000 whole-house repipe $440.10. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

City of Maricopa Development Services Fee Schedule, Rev. 10/2025 (Resolution 25-35, effective October 2, 2025)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Apply online at the Maricopa permit portal, or call (520) 316-6920.

How Maricopa values a job: New commercial construction is valued by occupancy and construction type from the current ICC valuation table, per the city's fee schedule.

Schedule effective October 2, 2025. Last verified: October 9, 2026

Maricopa Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Mechanical / HVAC Permit Fees in Maricopa

Residential (1–2 family): Major mechanical work, residential (priced on project valuation)
tiered rates by job value‡
Each band uses the base printed for it, which sits below what the band beneath reaches at every edge ($107 vs $116 at $2,000; $465 vs $475 at $25,000; $745 vs $765 at $50,000; $1,134 vs $1,145 at $100,000; $3,623 vs $3,934 at $500,000; $6,261 vs $6,623 at $1,000,000), so the fee dips just above each edge.
Up to $500
$56.00
Over $500, up to $2,000
$56.00 plus $4.00 per additional $100
Over $2,000, up to $25,000
$107.00 plus $16.00 per additional $1,000
Over $25,000, up to $50,000
$465.00 plus $12.00 per additional $1,000
Over $50,000, up to $100,000
$745.00 plus $8.00 per additional $1,000
Over $100,000, up to $500,000
$1,134.00 plus $7.00 per additional $1,000
Over $500,000, up to $1,000,000
$3,623.00 plus $6.00 per additional $1,000
Over $1,000,000
$6,261.00 plus $5.00 per additional $1,000
Residential (1–2 family): Minor residential mechanical work
$56.00 flat‡
Commercial / 3+ units: Major mechanical work, commercial (priced on project valuation)
tiered rates by job value‡
Each band uses the base printed for it, which sits below what the band beneath reaches at every edge ($107 vs $116 at $2,000; $465 vs $475 at $25,000; $745 vs $765 at $50,000; $1,134 vs $1,145 at $100,000; $3,623 vs $3,934 at $500,000; $6,261 vs $6,623 at $1,000,000), so the fee dips just above each edge.
Up to $500
$56.00
Over $500, up to $2,000
$56.00 plus $4.00 per additional $100
Over $2,000, up to $25,000
$107.00 plus $16.00 per additional $1,000
Over $25,000, up to $50,000
$465.00 plus $12.00 per additional $1,000
Over $50,000, up to $100,000
$745.00 plus $8.00 per additional $1,000
Over $100,000, up to $500,000
$1,134.00 plus $7.00 per additional $1,000
Over $500,000, up to $1,000,000
$3,623.00 plus $6.00 per additional $1,000
Over $1,000,000
$6,261.00 plus $5.00 per additional $1,000
Permit Issuance Fee (Commercial)
5% of job value, maximum $2,500.00 (5% of total project valuation, capped at $2,500, as printed.)‡
Permit Issuance Fee (Residential)
$50.00‡
Plan Review Fee (Trade, Roofing, and Flat-Fee Permits)
66% of the permit fee‡
66% of the permit fee, as printed for general plan review; whether trade, re-roof and flat-fee permits pay it is not printed.
Permit Extension (if applicable)
50% of the permit fee
Re-inspection Fee (if applicable)
$150.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured HVAC Company in Maricopa

Homeowners and contractors planning a project check Maricopa mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Maricopa Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work

Fees in Maricopa are the same either way.

Job type

2 documented rates for this permit type; pick the one that matches your job.

$
$500$50,000
Estimated mechanical / HVAC permit fee
$440.10
Included in this total
Mechanical / HVAC Permit Fee$235.00‡
$107.00 + 8 × $16.00 per $1,000 over $2,000 (see the fee table above)
Each band uses the base printed for it, which sits below what the band beneath reaches at every edge ($107 vs $116 at $2,000; $465 vs $475 at $25,000; $745 vs $765 at $50,000; $1,134 vs $1,145 at $100,000; $3,623 vs $3,934 at $500,000; $6,261 vs $6,623 at $1,000,000), so the fee dips just above each edge.
Permit Issuance Fee (Residential)$50.00‡
Plan Review Fee (Trade, Roofing, and Flat-Fee Permits)$155.10‡
Total Estimate$440.10

‡ Awaiting confirmation from the jurisdiction.

New commercial construction is valued by occupancy and construction type from the current ICC valuation table, per the city's fee schedule.

Estimate only. Confirm with the Maricopa building department before applying. Apply online. Phone: (520) 316-6920. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured HVAC Company in Maricopa

Homeowners and contractors planning a project check Maricopa mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Maricopa

Maricopa takes building permit applications and plans electronically only; paper plan submittals are no longer accepted. Apply, pay and track through the city's VIP Portal. Questions go to the Development Services Permit Center at (520) 316-6920 or dsd@maricopa-az.gov, open Monday to Thursday, 7 a.m. to 6 p.m., closed Fridays.

Source: Maricopa application instructions

Apply online: Maricopa permit portal
Building Department Contact
Address
39700 W Civic Center Plaza, Maricopa, AZ 85138
Hours
Monday to Thursday, 7 a.m. to 6 p.m., closed Fridays

Maricopa Permit Fee FAQs

How Much Does a Building Permit Cost in Maricopa?

The building permit for a $50,000 residential remodel runs $1,319.90, including the documented surcharges and minimum fees. The estimate is built from Maricopa's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Maricopa?

The roofing permit for a $20,000 residential re-roof runs $705.70, based on Maricopa's sourced fee schedule.

How Are Permit Fees Calculated in Maricopa?

A residential building permit is tiered rates by job value. Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Maricopa?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (Building Permits) (66% of the permit fee (66% of the permit fee, as printed for general plan review.)) and Plan Review Fee (Trade, Roofing, and Flat-Fee Permits) (66% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from City of Maricopa Development Services Fee Schedule, Rev. 10/2025 (Resolution 25-35, effective October 2, 2025). See the official schedule. Last verified .

Other Jurisdictions in Pinal County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.