Noma, FL Permit Fees (2026)
Building permit fees and building, electrical, mechanical/HVAC, and roofing permit fees for Noma, straight from the official fee schedule, with a free permit fee calculator below.
Holmes County's Building Department issues permits and collects fees for construction within Noma town limits, with the town providing only a separate compliance sign-off; the fees shown are the county's schedule. See the Holmes County fee schedule
In Noma, a building permit for a $50,000 remodel runs $629.76 in permit fees, a $20,000 re-roof $89.00, a $10,000 HVAC change-out $89.00, and a $10,000 electrical panel upgrade or rewire $89.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Holmes County Construction Permit Fees
Covers building, electrical, mechanical/HVAC, and roofing permits.
Holmes County's Building Department issues permits and collects fees for construction within Noma town limits, with the town providing only a separate compliance sign-off; the fees shown are the county's schedule. See the Holmes County fee schedule
How Noma values a job: Valuation is based on the applicant's declared job or construction cost entered on the permit application, except that for new construction the County has, since March 17, 2026, calculated square footage cost using 90% of the International Code Council's Building Valuation Table rather than a self declared contract price.
Schedule effective February 8, 2021. Last verified: September 9, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Noma Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Electrical Permit Fees in Noma
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Noma electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageNoma Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Permit fees for Noma are administered by Holmes County; the fees shown are the Holmes County schedule.
Estimate only. Confirm with the Holmes County building department before applying.
Homeowners and contractors planning a project check Noma electrical permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageNoma Permit Fee FAQs
How Much Does a Building Permit Cost in Noma?
How Much Does a Roofing Permit Cost in Noma?
How Are Permit Fees Calculated in Noma?
What Surcharges Are Added to Permits in Noma?
Do I Need a Permit for a Small Residential Job in Noma?
Where Do These Fees Come From?
Other Jurisdictions in Holmes County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.