Greenville, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Greenville, straight from the official fee schedule, with a free permit fee calculator below.
Building permit administration, inspections, and fees are delegated to Madison County under Greenville Code of Ordinances Sec. 8-2 (Delegation of Authority), adopted pursuant to F.S. Section 553.79(9). See the Madison County fee schedule
In Greenville, a building permit for a $50,000 remodel runs $470.75 in permit fees, a $20,000 re-roof $134.00, a $10,000 HVAC change-out $94.00, a $10,000 electrical panel upgrade or rewire $89.00, and a $10,000 whole-house repipe $109.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft roof, a 3-ton system, and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Madison County BOCC Resolution No. 2021-07-28 (Schedule of Fees, Section III Building Permit Fees)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $55.00.
Building permit administration, inspections, and fees are delegated to Madison County under Greenville Code of Ordinances Sec. 8-2 (Delegation of Authority), adopted pursuant to F.S. Section 553.79(9). See the Madison County fee schedule
Schedule effective July 28, 2021. Last verified: September 9, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Greenville Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Roofing Permit Fees in Greenville
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Greenville roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGreenville Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Assumes a $20,000.00 total job value for valuation-based surcharges.
Permit fees for Greenville are administered by Madison County; the fees shown are the Madison County schedule.
Estimate only. Confirm with the Madison County building department before applying.
Homeowners and contractors planning a project check Greenville roofing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageGreenville Permit Fee FAQs
How Much Does a Building Permit Cost in Greenville?
How Much Does a Roofing Permit Cost in Greenville?
How Are Permit Fees Calculated in Greenville?
What Is the Minimum Permit Fee in Greenville?
What Surcharges Are Added to Permits in Greenville?
Do I Need a Permit for a Small Residential Job in Greenville?
Where Do These Fees Come From?
Other Jurisdictions in Madison County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.