Wausau, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Wausau, straight from the official fee schedule, with a free permit fee calculator below.
Washington County administers building permits, plan review, and inspections for the Town of Wausau under the county's fee schedule. The Washington County Land Development Code, adopted by the Wausau Town Council together with the Board of County Commissioners (Ord. No. 2023-16, amended by Ord. No. 2026-01), directs building permit applications to the County Building Department (Sec. 10.06.01, 10.06.02) and sets permit fees by resolution of the Board of County Commissioners (Sec. 10.09.01). See the Washington County fee schedule
In Wausau, a building permit for a $50,000 remodel runs $615.56 in permit fees, a $20,000 re-roof $179.00, a $10,000 HVAC change-out $174.00, a $10,000 electrical panel upgrade or rewire $199.00, and a $10,000 whole-house repipe $227.08. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Washington County Building Department Fees (Schedule A eff. 9/1/2024; plan fees eff. 7/22/2024, rescanned 4/2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Washington County administers building permits, plan review, and inspections for the Town of Wausau under the county's fee schedule. The Washington County Land Development Code, adopted by the Wausau Town Council together with the Board of County Commissioners (Ord. No. 2023-16, amended by Ord. No. 2026-01), directs building permit applications to the County Building Department (Sec. 10.06.01, 10.06.02) and sets permit fees by resolution of the Board of County Commissioners (Sec. 10.09.01). See the Washington County fee schedule
How Wausau values a job: New construction valuation is based on the ICC Building Valuation Data square foot cost tables by occupancy and construction type; renovation, remodeling, and rehabilitation valuation is based on the contract price.
Schedule effective September 1, 2024. Last verified: September 8, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Wausau Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Building Permit Fees in Wausau
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Wausau building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageWausau Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
New construction valuation is based on the ICC Building Valuation Data square foot cost tables by occupancy and construction type; renovation, remodeling, and rehabilitation valuation is based on the contract price.
Permit fees for Wausau are administered by Washington County; the fees shown are the Washington County schedule.
Estimate only. Confirm with the Washington County building department before applying.
Homeowners and contractors planning a project check Wausau building permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageWausau Permit Fee FAQs
How Much Does a Building Permit Cost in Wausau?
How Much Does a Roofing Permit Cost in Wausau?
How Are Permit Fees Calculated in Wausau?
What Surcharges Are Added to Permits in Wausau?
Do I Need a Permit for a Small Residential Job in Wausau?
Where Do These Fees Come From?
Other Jurisdictions in Washington County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.