FreeEvery fee straight from the official city and county fee schedules. No signup.

Hampton, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Hampton, straight from the official fee schedule, with a free permit fee calculator below.

Building permits for the City of Hampton are issued by the Bradford County Building Department under Hampton Code Sec. 6-19 (Ord. 95-01), which adopts the state building codes to be enforced in the city by the county. Bradford County's Resolution 2026-02 fee schedule applies to those permits. See the Bradford County fee schedule

In Hampton, a building permit for a $50,000 remodel runs $84.00 in permit fees, a $20,000 re-roof $149.18, a $10,000 HVAC change-out $99.00, a $10,000 electrical panel upgrade or rewire $99.00, and a $10,000 whole-house repipe $99.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Resolution 2026-02, Building and Fire Prevention Fees

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $50.00.

Building permits for the City of Hampton are issued by the Bradford County Building Department under Hampton Code Sec. 6-19 (Ord. 95-01), which adopts the state building codes to be enforced in the city by the county. Bradford County's Resolution 2026-02 fee schedule applies to those permits. See the Bradford County fee schedule

How Hampton values a job: Bradford County calculates a building permit's value from a per square foot table by structure type, rounded to the nearest $1,000. For residential work the table value is used. For commercial and multifamily work the county uses the higher of the table value and the contractor's declared contract price, so a project costing more than $80 per square foot will be charged on the contract price. Electrical, plumbing, mechanical, roofing, and other trade permits are priced on the declared contract price, per Resolution 2026-02.

Schedule effective March 3, 2026. Last verified: September 8, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Hampton Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in Hampton

Declared value (standard)
tiered rates (see fee table), minimum $50.00 (Tier 1: flat $50 for value $0 to $1,000. Tier 2: $50 + $0.005 x (value minus $1,000) for value over $1,000, i.e. $5 per $1,000 of value, continuous (no fraction-thereof wording printed).)
$0–$1,000
$50.00
Over $1,000
$50.00 + $5.00 per $1,000
State DBPR Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00
State Radon/Building Code Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00
Re-inspection Fee (if applicable)
$40.00
Re-submittal of Plans Fee (if applicable)
$75.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

Sponsor This Page
Be the Featured Roofer in Hampton

Homeowners and contractors planning a project check Hampton roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Hampton Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
$
$500$100,000
Estimated roofing permit fee
$149.18
Roofing permit fee$145.00
tiered rates (see fee table), minimum $50.00 (Tier 1: flat $50 for value $0 to $1,000. Tier 2: $50 + $0.005 x (value minus $1,000) for value over $1,000, i.e. $5 per $1,000 of value, continuous (no fraction-thereof wording printed).)
State DBPR Surcharge (F.S. 468.631)$2.18
State Radon/Building Code Surcharge (F.S. 553.721)$2.00
Total Estimate$149.18

Bradford County calculates a building permit's value from a per square foot table by structure type, rounded to the nearest $1,000. For residential work the table value is used. For commercial and multifamily work the county uses the higher of the table value and the contractor's declared contract price, so a project costing more than $80 per square foot will be charged on the contract price. Electrical, plumbing, mechanical, roofing, and other trade permits are priced on the declared contract price, per Resolution 2026-02.

Permit fees for Hampton are administered by Bradford County; the fees shown are the Bradford County schedule.

Estimate only. Confirm with the Bradford County building department before applying.

Sponsor This Page
Be the Featured Roofer in Hampton

Homeowners and contractors planning a project check Hampton roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Hampton Permit Fee FAQs

How Much Does a Building Permit Cost in Hampton?

The building permit for a $50,000 residential remodel runs $84.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Hampton's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Hampton?

The roofing permit for a $20,000 residential re-roof runs $149.18, based on Hampton's sourced fee schedule.

How Are Permit Fees Calculated in Hampton?

A residential building permit is $45.00 base, plus $0.175 per sq ft of involved area, minimum $50.00 (Fee = $45 base + $0.175/sq ft, from Sec. 10's formula applied to the $35/sq ft rate (Sec. 11.A).). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Hampton?

The sourced schedule sets a minimum permit fee of $50.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Hampton?

On top of the base permit fee, the sourced schedule adds State DBPR Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Radon/Building Code Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Hampton?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution 2026-02, Building and Fire Prevention Fees. See the official schedule. Last verified .

Other Jurisdictions in Bradford County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.