FreeEvery fee straight from the official city and county fee schedules. No signup.

Lawtey, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Lawtey, straight from the official fee schedule, with a free permit fee calculator below.

Bradford County's Building Department issues building permits inside the City of Lawtey on the county's Resolution 2026-02 fee schedule; no written city-county agreement is published, so confirm with the county at 904-966-6223 before you apply. Lawtey handles its own zoning, so the county's $100 Certificate of Land Development Regulation Compliance included in these estimates may not apply there, and any city zoning fee is unpublished. See the Bradford County fee schedule

In Lawtey, a building permit for a $50,000 remodel runs $184.00 in permit fees, a $20,000 re-roof $149.18, a $10,000 HVAC change-out $99.00, a $10,000 electrical panel upgrade or rewire $99.00, and a $10,000 whole-house repipe $99.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Resolution 2026-02, Building and Fire Prevention Fees

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $50.00.

Bradford County's Building Department issues building permits inside the City of Lawtey on the county's Resolution 2026-02 fee schedule; no written city-county agreement is published, so confirm with the county at 904-966-6223 before you apply. Lawtey handles its own zoning, so the county's $100 Certificate of Land Development Regulation Compliance included in these estimates may not apply there, and any city zoning fee is unpublished. See the Bradford County fee schedule

How Lawtey values a job: Bradford County calculates a building permit's value from a per square foot table by structure type, rounded to the nearest $1,000. For residential work the table value is used. For commercial and multifamily work the county uses the higher of the table value and the contractor's declared contract price, so a project costing more than $80 per square foot will be charged on the contract price. Electrical, plumbing, mechanical, roofing, and other trade permits are priced on the declared contract price, per Resolution 2026-02.

Schedule effective March 3, 2026. Last verified: September 29, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Lawtey Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Lawtey

Residential (1–2 family): SFD remodel or repair
$45.00 base, plus $0.175 per sq ft of involved area, minimum $50.00 ($35/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Residential (1–2 family): Single family dwelling, modular home, or move-on residence (new)
$45.00 base, plus $0.30 per sq ft of involved area, minimum $50.00 ($60/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Residential (1–2 family): Agricultural building or carport, no concrete slab
$45.00 base, plus $0.065 per sq ft of involved area, minimum $50.00 ($13/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Residential (1–2 family): Agricultural building or carport, with concrete slab
$45.00 base, plus $0.12 per sq ft of involved area, minimum $50.00 ($24/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Residential (1–2 family): Detached garage (new)
$45.00 base, plus $0.175 per sq ft of involved area, minimum $50.00 ($35/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Residential (1–2 family): Mobile home, double wide, install or replace
$300.00 flat
Residential (1–2 family): Mobile home, single wide, install or replace
$200.00 flat
Residential (1–2 family): Residential utility building, over 100 sq ft total
$45.00 base, plus $0.075 per sq ft of involved area, minimum $50.00 ($15/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Commercial / 3+ units: Commercial/multifamily (all categories)
$45.00 base, plus $0.40 per sq ft of involved area, minimum $50.00 ($80/sq ft table value; $50 first $1,000 plus $5 per $1,000)
Commercial / 3+ units: Declared contract value, when higher than the table value
tiered rates by job value, minimum $50.00 ($50 first $1,000 of value plus $5 per $1,000 above)
Up to $1,000
$50.00
Over $1,000
$50.00 plus $5.00 per additional $1,000
Certificate of Land Development Regulation Compliance
$100.00‡
Fire First Inspection of Construction
$65.00 to $115.00 by sq ft of building area‡
Up to 5,000 sq ft
$65.00
Over 5,000, up to 15,000 sq ft
$70.00
Over 15,000, up to 25,000 sq ft
$75.00
Over 25,000, up to 35,000 sq ft
$80.00
Over 35,000, up to 45,000 sq ft
$85.00
Over 45,000 sq ft
$115.00
Fire Plan Review (Site and Building)
$55.00 to $110.00 by sq ft of building area‡
Up to 10,000 sq ft
$55.00
Over 10,000, up to 20,000 sq ft
$65.00
Over 20,000, up to 30,000 sq ft
$75.00
Over 30,000, up to 40,000 sq ft
$85.00
Over 40,000, up to 50,000 sq ft
$95.00
Over 50,000 sq ft
$110.00
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
Private Provider Inspections Reduction
may reduce the permit fee by 50%‡
Private Provider Plan Review Reduction
may reduce the permit fee by 50%‡
Private Provider Reduction (Plan Review and Inspections)
may reduce the permit fee by 50%‡
Development Permit (flood zone) (if applicable)
$50.00
Fire Plan Re-submittal (Site and Building) (if applicable)
$65.00 to $125.00 by sq ft of building area
Up to 10,000 sq ft
$65.00
Over 10,000, up to 20,000 sq ft
$75.00
Over 20,000, up to 30,000 sq ft
$85.00
Over 30,000, up to 40,000 sq ft
$95.00
Over 40,000, up to 50,000 sq ft
$105.00
Over 50,000 sq ft
$125.00
Fire Re-inspection (1st) (if applicable)
$40.00
Fire Re-inspection (2nd) (if applicable)
$80.00 to $150.00 by sq ft of building area
Up to 5,000 sq ft
$80.00
Over 5,000, up to 15,000 sq ft
$85.00
Over 15,000, up to 25,000 sq ft
$90.00
Over 25,000, up to 35,000 sq ft
$100.00
Over 35,000, up to 45,000 sq ft
$110.00
Over 45,000 sq ft
$150.00
Fire Re-inspection (3rd) (if applicable)
$95.00 to $160.00 by sq ft of building area
Up to 5,000 sq ft
$95.00
Over 5,000, up to 15,000 sq ft
$100.00
Over 15,000, up to 25,000 sq ft
$105.00
Over 25,000, up to 35,000 sq ft
$110.00
Over 35,000, up to 45,000 sq ft
$120.00
Over 45,000 sq ft
$160.00
Fire Review, Cell Tower (if applicable)
$25.00
Fire Review, Fuel Tank Install (if applicable)
$55.00
Fire Sprinkler, Fire Alarm and Standpipe Plan Review (if applicable)
$175.00 to $200.00 by sq ft of building area
Up to 50,000 sq ft
$175.00
Over 50,000 sq ft
$200.00
Fire Sprinkler, Fire Alarm and Standpipe Re-submittal (if applicable)
$85.00
Hood or Suppression Plan Review (if applicable)
$25.00
Mobile Home - Each Additional Section (if applicable)
$100.00
Re-inspection Fee (if applicable)
$40.00
Re-submittal of Plans Fee (if applicable)
$75.00
Underground Fire Line or Fire Pump Test (if applicable)
$70.00 (1st inspection; 2nd $95, 3rd $110)

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Lawtey

Homeowners and contractors planning a project check Lawtey building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lawtey Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
sq ft
505,000 sq ft
Estimated building permit fee
$184.00
Included in this total
Building Permit Fee$80.00
$45.00 base + 200 sq ft × $0.175 per sq ft, minimum $50.00
$35/sq ft table value; $50 first $1,000 plus $5 per $1,000
Certificate of Land Development Regulation Compliance$100.00‡
State Building Code Administrators Surcharge (F.S. 468.631)$2.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Private provider reductions (F.S. 553.791), not applied: 50% of the permit fee‡ with a private provider for inspections; 50% of the permit fee‡ with a private provider for plan review; 50% of the permit fee‡ with a private provider for plan review and inspections. Confirm eligibility and reduced figures with the building department.
Total Estimate$184.00

‡ Awaiting confirmation from the jurisdiction.

Permit fees for Lawtey are administered by Bradford County; the fees shown are the Bradford County schedule.

Estimate only. Confirm with the Bradford County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Lawtey

Homeowners and contractors planning a project check Lawtey building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Lawtey Permit Fee FAQs

How Much Does a Building Permit Cost in Lawtey?

The building permit for a $50,000 residential remodel runs $184.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Lawtey's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Lawtey?

The roofing permit for a $20,000 residential re-roof runs $149.18, based on Lawtey's sourced fee schedule.

How Are Permit Fees Calculated in Lawtey?

A residential building permit is $45.00 base, plus $0.175 per sq ft of involved area, minimum $50.00 ($35/sq ft table value; $50 first $1,000 plus $5 per $1,000). Electrical, Plumbing, Mechanical / HVAC, and Roofing permits scale with the value of the job. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Lawtey?

The sourced schedule sets a minimum permit fee of $50.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Lawtey?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Lawtey?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution 2026-02, Building and Fire Prevention Fees. See the official schedule. Last verified .

Other Jurisdictions in Bradford County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.