Starke, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, and mechanical/HVAC permit fees for Starke, straight from the official fee schedule, with a free permit fee calculator below.
In Starke, a $10,000 HVAC change-out runs $79.00 in permit fees, a $10,000 electrical panel upgrade or rewire $79.00, and a $10,000 whole-house repipe $79.00. Totals include the documented surcharges and minimum fees. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Jump to Permit Fee CalculatorResolution 2025-14, City of Starke, Florida, Adopting Fee Schedule for Planning, Zoning and Building Fees (Exhibit A)
Covers building, electrical, plumbing, and mechanical/HVAC permits.
Apply online at the Starke permit portal, or call 904-930-3243.
How Starke values a job: For residential, commercial, and industrial building permits, chargeable valuation is determined using ICC Building Valuation Data by construction type and occupancy group, per Exhibit A of Resolution 2025-14.
Schedule effective May 20, 2025. Last verified: September 26, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Starke Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Mechanical / HVAC Permit Fees in Starke
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Starke mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageStarke Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Fees in Starke are the same either way.
2 documented rates for this permit type; pick the one that matches your job.
Estimate only. Confirm with the Starke building department before applying. Apply online. Phone: 904-930-3243. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.
Homeowners and contractors planning a project check Starke mechanical / HVAC permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageHow to Apply for a Permit in Starke
The City of Starke Building & Zoning Department issues building, roofing, electrical, mechanical and plumbing permits for work inside city limits. Apply online through the city's iWorQ Citizen Portal using the Building Permit Application or the Roofing Permit Application. Upload the notarized form the portal links, together with your plans and documents. Contractors register through the city's separate Contractor Verification Portal. Documents can also be emailed to buildzone@cityofstarke.org, and paper applications are posted on the Building & Zoning page. The city accepts only cash or checks for fees. Inspections are done Tuesday, Wednesday and Thursday mornings; schedule at least one day in advance. When a Notice of Commencement is required, a certified copy must be submitted before the first inspection.
Source: Starke application instructions
Apply online: Starke permit portal- Phone
- 904-930-3243
- Address
- City Hall, 209 North Thompson Street, Starke, FL 32091
- Hours
- Monday through Thursday 8:00 AM to 4:30 PM; closed Fridays except by appointment made 24 hours in advance
- Director
- Nick Krahl, Director of Building & Zoning
- Source
- Official contact page
Starke Permit Fee FAQs
How Are Permit Fees Calculated in Starke?
What Surcharges Are Added to Permits in Starke?
Do I Need a Permit for a Small Residential Job in Starke?
Where Do These Fees Come From?
Other Jurisdictions in Bradford County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.