Building Permit Fees in Indian Harbour Beach, FL (2026)

In Indian Harbour Beach, a $50,000 kitchen remodel runs about $64.00 in permit fees, a $15,000 re-roof about $226.98, an $8,000 HVAC change-out about $125.50, a $12,000 electrical panel upgrade or rewire about $125.50, an $8,000 whole-house repipe about $176.13, and a new $350,000 single-family home about $1,342.00. Totals include the documented surcharges and minimum fees, with unit-priced trades assuming a typical job scope — pick a project to load it in the calculator below.

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Fees from Permit Fee Chart (Indian Harbour Beach) — consolidated schedule per Resolutions 630 (2011), 757 (2024), and 26-05 (2026), last verified July 22, 2026.

Fee details

Every documented rule for each permit type, straight from the official schedule. The calculator below uses the default rule; variants are listed for reference.

Plumbing Permit Fees in Indian Harbour Beach

Plumbing (General)
$114.75 flat
Re-Pipe
$67.50 flat
Water Heater
$27.00 flat
Residential (1–2 family)
$85.00 flat
Commercial / 3+ units
$135.00 base, plus $20.00 per unit
FL BCAIF surcharge (DBPR, §468.631)
1.5% of the permit fee, minimum $2.00
FL building-code enforcement surcharge (§553.721)
1% of the permit fee, minimum $2.00
Plan Review Fee
50% of the permit fee, jobs over $1,000 only
Re-Inspection Fee (if applicable)
$54.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Source

Permit Fee Chart (Indian Harbour Beach) — consolidated schedule per Resolutions 630 (2011), 757 (2024), and 26-05 (2026)

Schedules effective August 9, 2011 – July 8, 2026. Last verified: July 22, 2026

Fee calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Rate type
Estimated plumbing permit fee
$176.13
Plumbing permit fee$114.75
$114.75 flat
FL BCAIF surcharge (DBPR, §468.631)$2.00
The city's fee chart and resolutions do not print the statutory state surcharges and contain no surcharge-inclusive language; statutory 1.5% / $2.00 minimum applied (Winter Garden precedent). Added 2026-07-22 review.
FL building-code enforcement surcharge (§553.721)$2.00
The city's fee chart and resolutions do not print the statutory state surcharges and contain no surcharge-inclusive language; statutory 1.0% / $2.00 minimum applied (Winter Garden precedent). Added 2026-07-22 review.
Plan Review Fee$57.38
Resolution 630 §2 (2011, p.4): when construction valuation exceeds $1,000 and FBC §104.2 requires a plan to be submitted, plan checking fee = one-half of the permit fee, IN ADDITION to the permit fee. Not itemized in the current compiled fee chart (Doc 1037) — sourced from the original resolution text; later fee resolutions (757 in 2024, 26-05 in 2026) only amended the §1 fee tables with no indication §2 was repealed. SCOPE (2026-07-22 review): §2's own text says 'building permit fee', but Res. 630 §1(a)'s footnote '** Plan review fee will be charged at half of the permit fee where applicable' attaches to the itemized list that includes electrical/plumbing/mechanical/roofing lines — genuinely ambiguous, so broadened to ALL permit types as needs_confirmation per the 2026-07-21 owner broad-scope policy (no parallel per-trade review lines exist, so no double-count risk). Ask the city whether trade permits are charged plan review.
Total estimate$176.13

Estimate only. Confirm with the Indian Harbour Beach building department before applying.

Other jurisdictions in Brevard County