St. Marks, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for St. Marks, straight from the official fee schedule, with a free permit fee calculator below.
Wakulla County issues building permits and collects its Resolution 13-61 permit fees for the City of St. Marks; the city has adopted the county building code (city Code Sec. 14-1) and its own Sec. 14-2 requires a city compliance letter to the county building inspector. St. Marks separately charges its own application, plan review, and hearing fees under Ordinance 2025-05 as published by the city; the codified Sec. 14-2 prints earlier $25 and $40 figures, and the current amounts are pending confirmation with the city. See the Wakulla County fee schedule
In St. Marks, a building permit for a $50,000 remodel runs $275.00 in permit fees, a $20,000 re-roof $199.00, a $10,000 HVAC change-out $149.00, a $10,000 electrical panel upgrade or rewire $149.00, and a $10,000 whole-house repipe $149.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, and a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Resolution 13-61: Schedule of Fees for Inspections and Enforcement of the Florida Building Code and Fire Prevention Code
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Wakulla County issues building permits and collects its Resolution 13-61 permit fees for the City of St. Marks; the city has adopted the county building code (city Code Sec. 14-1) and its own Sec. 14-2 requires a city compliance letter to the county building inspector. St. Marks separately charges its own application, plan review, and hearing fees under Ordinance 2025-05 as published by the city; the codified Sec. 14-2 prints earlier $25 and $40 figures, and the current amounts are pending confirmation with the city. See the Wakulla County fee schedule
Schedule effective November 4, 2013. Last verified: September 8, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
St. Marks Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in St. Marks
† Corroborated across official sources, but not printed line-for-line in the linked schedule.
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check St. Marks plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSt. Marks Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Permit fees for St. Marks are administered by Wakulla County; the fees shown are the Wakulla County schedule.
Estimate only. Confirm with the Wakulla County building department before applying.
Homeowners and contractors planning a project check St. Marks plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageSt. Marks Permit Fee FAQs
How Much Does a Building Permit Cost in St. Marks?
How Much Does a Roofing Permit Cost in St. Marks?
How Are Permit Fees Calculated in St. Marks?
What Surcharges Are Added to Permits in St. Marks?
Do I Need a Permit for a Small Residential Job in St. Marks?
Where Do These Fees Come From?
Other Jurisdictions in Wakulla County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.