FreeEvery fee straight from the official city and county fee schedules. No signup.

Sopchoppy, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Sopchoppy, straight from the official fee schedule, with a free permit fee calculator below.

Wakulla County issues and inspects building permits inside Sopchoppy city limits and charges its Resolution 13-61 fees, so the county schedule applies here. The city's council minutes record that the county administers city permits, the city approved a county-city services agreement covering building codes in 2018, and the city books no building permit revenue of its own. The city code still has 2007 sections for a city building official and a city permit fee list, but the city has not used them since at least 2014. Before applying to the county, get a city development permit from Sopchoppy City Hall; the city's development permit and zoning fees (Ordinance 2018-02) are not published and are not included here. See the Wakulla County fee schedule

In Sopchoppy, a building permit for a $50,000 remodel runs $240.00 in permit fees, a $20,000 re-roof $164.00, a $10,000 HVAC change-out $114.00, a $10,000 electrical panel upgrade or rewire $114.00, and a $10,000 whole-house repipe $114.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, and a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Resolution 13-61: Schedule of Fees for Inspections and Enforcement of the Florida Building Code and Fire Prevention Code

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Wakulla County issues and inspects building permits inside Sopchoppy city limits and charges its Resolution 13-61 fees, so the county schedule applies here. The city's council minutes record that the county administers city permits, the city approved a county-city services agreement covering building codes in 2018, and the city books no building permit revenue of its own. The city code still has 2007 sections for a city building official and a city permit fee list, but the city has not used them since at least 2014. Before applying to the county, get a city development permit from Sopchoppy City Hall; the city's development permit and zoning fees (Ordinance 2018-02) are not published and are not included here. See the Wakulla County fee schedule

Schedule effective November 4, 2013. Last verified: September 28, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Sopchoppy Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Sopchoppy

Residential (1–2 family) (remodel/alteration)
$200.00 for the first 2,000 sq ft renovated, plus $0.15 per sq ft renovated
Residential (1–2 family) (new construction)
$0.48 per sq ft under roof, minimum $765.00
Residential (1–2 family): Above-ground swimming pool (non-seasonal)
$125.00 flat
Residential (1–2 family): Boat lift
$65.00 flat
Residential (1–2 family): Deck (standard)
$75.00 flat
Residential (1–2 family): Deck on pilings (5 ft+)
$240.00 for the first 250 sq ft, plus $0.07 per sq ft
Residential (1–2 family): Demolition
$100.00 flat
Residential (1–2 family): Dock
$175.00 for the first 250 sq ft, plus $0.07 per sq ft
Residential (1–2 family): Foundation only permit
$200.00 for the first 3,000 sq ft, plus $0.05 per sq ft†
Residential (1–2 family): House moving - set-up
$315.00 flat
Residential (1–2 family): In-ground swimming pool
$275.00 flat
Residential (1–2 family): Mobile home/DCA unit set-up
$765.00 flat
Residential (1–2 family): Solar panel water heater
$150.00 flat
Residential (1–2 family): Solar PV (residential flat)
$100.00 flat‡
Residential (1–2 family): Vinyl/Hardy siding
$100.00 for the first 3,000 sq ft, plus $0.05 per sq ft†
Residential (1–2 family): Addition (1-2 family dwelling)
$300.00 for the first 625 sq ft addition, plus $0.48 per sq ft addition
Commercial / 3+ units: Business alterations
$0.23 per sq ft (commercial building), minimum $722.00
Commercial / 3+ units
$0.46 per sq ft (commercial building), minimum $722.00
Commercial / 3+ units: Commercial DCA/modular unit set-up
$765.00 base, plus $0.59 per sq ft
Commercial / 3+ units: Deck (standard)
$175.00 flat
Commercial / 3+ units: Demolition
$200.00 flat
Commercial / 3+ units: Dock
$275.00 for the first 250 sq ft, plus $0.07 per sq ft
Commercial / 3+ units: Foundation only permit
$300.00 for the first 3,000 sq ft, plus $0.05 per sq ft†
Commercial / 3+ units: In-ground swimming pool
$350.00 flat
Commercial / 3+ units: Solar panel water heater
$225.00 flat
Commercial / 3+ units: Vinyl/Hardy siding
$150.00 for the first 3,000 sq ft, plus $0.05 per sq ft†
Commercial / 3+ units: Additions rate
$1.20 per sq ft (commercial building)
Attached/detached garage (frame or block)
$225.00 flat†
Change of use/occupancy
$80.00 flat
Closed shelter
tiered rates by sq ft†
Up to 400 sq ft
$150.00
Over 400, up to 1,500 sq ft
$225.00
Over 1,500 sq ft
$225.00 plus $0.05 per additional sq ft
Cover over existing deck
$100.00 flat
Fuel dispensing pump
$100.00 per pump
Impact fee exemption letter inspection
$50.00 flat
Open shelter
tiered rates by sq ft†
Up to 400 sq ft
$125.00
Over 400, up to 1,500 sq ft
$200.00
Over 1,500 sq ft
$200.00 plus $0.05 per additional sq ft
Petroleum product tank
$350.00 per tank
Pre-manufactured lawn storage shed/carport
$75.00 flat
Pre-move mobile home inspection
$65.00 flat
Raising structures
$300.00 for the first 1,800 sq ft, plus $0.10 per sq ft†
Safety inspection
$65.00 flat
Screen pool enclosure
$150.00 flat
Screen porch
$100.00 flat
Screen porch on foundation
$150.00 flat
Seawall/bulkhead
$300.00 for the first 50 linear feet, plus $0.50 per linear foot
Solar PV (by system size)
$150.00 for the first 4 KW, plus $0.25 per KW‡
Temporary tent/event/festival
$80.00 flat
Application and Plans Review Fee (Residential)
$35.00‡
Application Fee (Commercial)
$65.00‡
Fire Application Fee (Commercial) (select fee rules only)
$40.00‡
Fire Application Fee per Square Foot (Commercial) (select fee rules only)
$0.05 per sq ft‡
State Building Code Administrators Surcharge (F.S. 468.631)
1.5% of the permit fee, minimum $2.00†
State Building Permit Surcharge (F.S. 553.721)
1% of the permit fee, minimum $2.00†
FEMA or Engineered Foundation Fee (select fee rules only) (if applicable)
$125.00
Foundation Extra (Shed/Carport) (if applicable)
$50.00
Gas Appliance Permit (Commercial) (if applicable)
$115.00 by appliance
Up to 3 appliances
$115.00
Over 3 appliances
$115.00 plus $25.00 per additional appliance
Gas Appliance Permit (Residential) (if applicable)
$75.00 by appliance†
Up to 3 appliances
$75.00
Over 3 appliances
$75.00 plus $15.00 per additional appliance
Re-Inspection Fee (if applicable)
$50.00 per re-inspection
Shelter Foundation Addition Fee (if applicable)
$75.00†

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Sopchoppy

Homeowners and contractors planning a project check Sopchoppy building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Sopchoppy Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

33 documented rates for this permit type; pick the one that matches your job.

sq ft
505,000 sq ft
Estimated building permit fee
$240.00
Included in this total
Building Permit Fee$200.00
$200.00 for the first 2,000 sq ft renovated, plus $0.15 per sq ft renovated
Application and Plans Review Fee (Residential)$35.00‡
State Building Code Administrators Surcharge (F.S. 468.631)$3.00
State Building Permit Surcharge (F.S. 553.721)$2.00
Total Estimate$240.00

‡ Awaiting confirmation from the jurisdiction.

Permit fees for Sopchoppy are administered by Wakulla County; the fees shown are the Wakulla County schedule.

Estimate only. Confirm with the Wakulla County building department before applying. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Sopchoppy

Homeowners and contractors planning a project check Sopchoppy building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Sopchoppy Permit Fee FAQs

How Much Does a Building Permit Cost in Sopchoppy?

The building permit for a $50,000 residential remodel runs $240.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from Sopchoppy's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Sopchoppy?

The roofing permit for a $20,000 residential re-roof runs $164.00, assuming a 2,000 sq ft roof where the schedule prices per unit, based on Sopchoppy's sourced fee schedule.

How Are Permit Fees Calculated in Sopchoppy?

A residential building permit is $200.00 for the first 2,000 sq ft renovated, plus $0.15 per sq ft renovated. Electrical and Plumbing permits are flat fees; Mechanical / HVAC permits are priced per ton; Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Sopchoppy?

On top of the base permit fee, the sourced schedule adds State Building Code Administrators Surcharge (F.S. 468.631) (1.5% of the permit fee, minimum $2.00) and State Building Permit Surcharge (F.S. 553.721) (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in Sopchoppy?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution 13-61: Schedule of Fees for Inspections and Enforcement of the Florida Building Code and Fire Prevention Code. See the official schedule. Last verified .

Other Jurisdictions in Wakulla County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.