FreeEvery fee straight from the official city and county fee schedules. No signup.

St. Marks, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for St. Marks, straight from the official fee schedule, with a free permit fee calculator below.

Wakulla County issues building permits and collects its Resolution 13-61 permit fees for the City of St. Marks; the city has adopted the county building code (city Code Sec. 14-1) and its own Sec. 14-2 requires a city compliance letter to the county building inspector. St. Marks separately charges its own application, plan review, and hearing fees under Ordinance 2025-05 as published by the city; the codified Sec. 14-2 prints earlier $25 and $40 figures, and the current amounts are pending confirmation with the city. See the Wakulla County fee schedule

In St. Marks, a building permit for a $50,000 remodel runs $275.00 in permit fees, a $20,000 re-roof $199.00, a $10,000 HVAC change-out $149.00, a $10,000 electrical panel upgrade or rewire $149.00, and a $10,000 whole-house repipe $149.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 200 sq ft remodel area, a 2,000 sq ft roof, and a 3-ton system. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Source

Resolution 13-61: Schedule of Fees for Inspections and Enforcement of the Florida Building Code and Fire Prevention Code

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Wakulla County issues building permits and collects its Resolution 13-61 permit fees for the City of St. Marks; the city has adopted the county building code (city Code Sec. 14-1) and its own Sec. 14-2 requires a city compliance letter to the county building inspector. St. Marks separately charges its own application, plan review, and hearing fees under Ordinance 2025-05 as published by the city; the codified Sec. 14-2 prints earlier $25 and $40 figures, and the current amounts are pending confirmation with the city. See the Wakulla County fee schedule

Schedule effective November 4, 2013. Last verified: September 8, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

St. Marks Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Roofing Permit Fees in St. Marks

Residential (1–2 family)
$125.00 for the first 3000 sq ft, plus $0.05 per sq ft
Commercial / 3+ units
$200.00 for the first 3000 sq ft, plus $0.05 per sq ft
Application and Plans Review Fee (Residential)
$35.00
Application Fee (Commercial)
$65.00
F.S. 468.631 Building Code Administration Surcharge
1.5% of the permit fee, minimum $2.00
F.S. 553.721 Building Permit Surcharge
1% of the permit fee, minimum $2.00
St. Marks - Building Application Fee (Commercial)
$50.00
St. Marks - Building Application Fee (Residential)
$35.00
Re-Inspection Fee (if applicable)
$50.00 per re-inspection
St. Marks - Administrative Fee for Hearing (if applicable)
$25.00
St. Marks - Plan Review Fee (Commercial) (if applicable)
$65.00
St. Marks - Plan Review Fee (Residential) (if applicable)
$35.00
St. Marks - Pre-Application Conference (Commercial) (if applicable)
$300.00
St. Marks - Pre-Application Conference (Residential) (if applicable)
$150.00
St. Marks - Zoning Determination Request (if applicable)
$75.00

† Corroborated across official sources, but not printed line-for-line in the linked schedule.

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Roofer in St. Marks

Homeowners and contractors planning a project check St. Marks roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

St. Marks Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
sq ft
5006,000 sq ft
Estimated roofing permit fee
$199.00
Roofing permit fee$125.00
$125.00 for the first 3000 sq ft, plus $0.05 per sq ft
Application and Plans Review Fee (Residential)$35.00
F.S. 468.631 Building Code Administration Surcharge$2.00
F.S. 553.721 Building Permit Surcharge$2.00
St. Marks - Building Application Fee (Residential)$35.00
Total Estimate$199.00

Permit fees for St. Marks are administered by Wakulla County; the fees shown are the Wakulla County schedule.

Estimate only. Confirm with the Wakulla County building department before applying.

Sponsor This Page
Be the Featured Roofer in St. Marks

Homeowners and contractors planning a project check St. Marks roofing permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

St. Marks Permit Fee FAQs

How Much Does a Building Permit Cost in St. Marks?

The building permit for a $50,000 residential remodel runs $275.00, assuming a 200 sq ft remodel area where the schedule prices per unit, including the documented surcharges and minimum fees. The estimate is built from St. Marks's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in St. Marks?

The roofing permit for a $20,000 residential re-roof runs $199.00, assuming a 2,000 sq ft roof where the schedule prices per unit, based on St. Marks's sourced fee schedule.

How Are Permit Fees Calculated in St. Marks?

A residential building permit is $200.00 for the first 2000 sq ft renovated, plus $0.15 per sq ft renovated. Electrical and Plumbing permits are flat fees; Mechanical / HVAC permits are priced per ton; Roofing permits are priced per sq ft. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in St. Marks?

On top of the base permit fee, the sourced schedule adds F.S. 468.631 Building Code Administration Surcharge (1.5% of the permit fee, minimum $2.00) and F.S. 553.721 Building Permit Surcharge (1% of the permit fee, minimum $2.00). These are included in every estimate on this page.

Do I Need a Permit for a Small Residential Job in St. Marks?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Resolution 13-61: Schedule of Fees for Inspections and Enforcement of the Florida Building Code and Fire Prevention Code. See the official schedule. Last verified .

Other Jurisdictions in Wakulla County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.