Chipley, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Chipley, straight from the official fee schedule, with a free permit fee calculator below.

Washington County administers building permits, plan review, and inspections for the City of Chipley; the county building permit fees shown are the county's adopted Schedule A. The City of Chipley separately charges its own land use and construction application fees under its Schedule of Fees adopted December 13, 2022. Washington County's $50 Land Use Certificate fee appears in new-construction estimates, but it likely does not apply here: the county routes Chipley projects to the city's own Land Use Compliance Certification, which carries the city's $40 certificate fee instead. See the Washington County fee schedule

In Chipley, a building permit for a $50,000 remodel runs $686.20 in permit fees, a re-roof $209.00, a $10,000 HVAC change-out $154.00, a $10,000 electrical panel upgrade or rewire $179.00, and a whole-house repipe $207.08. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Washington County Building Department Fees (Schedule A eff. 9/1/2024; plan fees eff. 7/22/2024, rescanned 4/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Washington County administers building permits, plan review, and inspections for the City of Chipley; the county building permit fees shown are the county's adopted Schedule A. The City of Chipley separately charges its own land use and construction application fees under its Schedule of Fees adopted December 13, 2022. Washington County's $50 Land Use Certificate fee appears in new-construction estimates, but it likely does not apply here: the county routes Chipley projects to the city's own Land Use Compliance Certification, which carries the city's $40 certificate fee instead. See the Washington County fee schedule

Apply online at the Chipley permit portal, or call (850) 638-6195.

How Chipley values a job: New construction valuation is based on the ICC Building Valuation Data square foot cost tables by occupancy and construction type; renovation, remodeling, and rehabilitation valuation is based on the contract price.

Schedule effective September 1, 2024. Last verified: September 26, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Chipley Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Chipley

Residential (1–2 family): Mobile home setup (double wide)
$150.00 flat
Residential (1–2 family): Mobile home setup (single wide)
$125.00 flat
Residential (1–2 family): Mobile home setup (triple wide)
$175.00 flat
All projects
tiered rates by job value, minimum $100.00‡
Up to $10,000
$100.00
Over $10,000, up to $50,000
$100.00 plus $6.00 per additional $1,000
Over $50,000, up to $100,000
$492.00 plus $5.00 per additional $1,000
Over $100,000, up to $500,000
$742.00 plus $4.00 per additional $1,000
Over $500,000
$2,342.00 plus $3.00 per additional $1,000
Alarm (fire or burglary)
$100.00 flat
Enclosed pole barn
$35.00 flat
Open pole barn
$20.00 flat
Structure demolition
$140.00 flat
Structure relocation (moved into county)
$260.00 flat
Swimming pool
tiered rates by job value, minimum $115.00‡
Up to $10,000
$100.00
Over $10,000, up to $50,000
$100.00 plus $6.00 per additional $1,000
Over $50,000, up to $100,000
$492.00 plus $5.00 per additional $1,000
Over $100,000, up to $500,000
$742.00 plus $4.00 per additional $1,000
Over $500,000
$2,342.00 plus $3.00 per additional $1,000
Construction Permit Application Fee (City of Chipley)
0.5% of job value ($5 per $1,000 of total cost as printed by the City of Chipley)‡
Land Use Certificate (New) (new construction)
$50.00‡
Plan Review Fee
15% of the permit fee, minimum $35.00‡
Plan Submittal Fee
$35.00‡
State Surcharge (Radon)
3% of the permit fee, minimum $4.00‡
Certificate of Land Use Application (City of Chipley) (if applicable)
$40.00‡
Certified Contractor Admin Fee (if applicable)
$35.00‡
Concurrency Permit Application (City of Chipley) (if applicable)
$40.00‡
Demolition Permit (City of Chipley) (if applicable)
$50.00
Manufactured Home Siting Permit (City of Chipley) (if applicable)
$125.00
Moving Permit (City of Chipley) (if applicable)
$50.00
Reinspection Fee (if applicable)
$75.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Chipley

Homeowners and contractors planning a project check Chipley building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Chipley Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

10 documented rates for this permit type; pick the one that matches your job.

$
$2,500$500,000
Estimated building permit fee
$686.20
Included in this total
Building Permit Fee$340.00‡
$100.00 + 40 × $6.00 per $1,000 over $10,000, minimum $100.00 (see the fee table above)
Construction Permit Application Fee (City of Chipley)$250.00‡
Plan Submittal Fee$35.00‡
Plan Review Fee$51.00‡
State Surcharge (Radon)$10.20‡
Total Estimate$686.20

‡ Awaiting confirmation from the jurisdiction.

New construction valuation is based on the ICC Building Valuation Data square foot cost tables by occupancy and construction type; renovation, remodeling, and rehabilitation valuation is based on the contract price.

Permit fees for Chipley are administered by Washington County; the fees shown are the Washington County schedule.

Estimate only. Confirm with the Washington County building department before applying. Apply online. Phone: (850) 638-6195. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Chipley

Homeowners and contractors planning a project check Chipley building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Chipley

Washington County's Building Department issues building permits for construction inside Chipley city limits. Start with the City of Chipley: new development needs a Land Use Compliance Certification from the city's Planning and Zoning office at City Hall, 1442 Jackson Avenue (850-638-6350), and city permits must be approved by the City Administrator's office before payment. The signed certification must be presented to the Washington County Building Official before a certificate of occupancy is issued. Then apply for the building permit with Washington County: registered contractors may email applications to permits@washingtonfl.com, and all others apply in person at 1331 South Blvd., Chipley, Monday through Friday, 8 a.m. to 4 p.m. Schedule inspections with the county Building Department at (850) 638-6195 at least 24 to 48 hours ahead, with your permit number and inspection type.

Source: Chipley application instructions

Apply online: Chipley permit portal
Building Department Contact
Address
1331 South Blvd., Chipley, FL 32428
Hours
Monday to Friday, 8:00 a.m. to 4:00 p.m.

Chipley Permit Fee FAQs

How Much Does a Building Permit Cost in Chipley?

The building permit for a $50,000 residential remodel runs $686.20, including the documented surcharges and minimum fees. The estimate is built from Chipley's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Chipley?

The roofing permit for a residential re-roof runs $209.00, assuming a 2,000 sq ft (20-square) roof (the schedule prices per unit), based on Chipley's sourced fee schedule.

How Are Permit Fees Calculated in Chipley?

A residential building permit is tiered rates by job value, minimum $100.00. Electrical permits are flat fees; Plumbing permits are priced per fixture; Mechanical / HVAC permits are flat fees for the default job, while new construction is priced per unit; Roofing permits are priced per square. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Chipley?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (15% of the permit fee, minimum $35.00) and State Surcharge (Radon) (3% of the permit fee, minimum $4.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Chipley?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Washington County Building Department Fees (Schedule A eff. 9/1/2024; plan fees eff. 7/22/2024, rescanned 4/2026). See the official schedule. Last verified .

Other Jurisdictions in Washington County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.