FreeEvery fee straight from the official city and county fee schedules. No signup.

Vernon, FL Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Vernon, straight from the official fee schedule, with a free permit fee calculator below.

Washington County's Building Department issues building permits and collects permit fees for the City of Vernon under the Washington County Land Development Code (Ord. 2023-16, adopted jointly by the county and the Vernon City Council, effective December 14, 2023, as amended by Ord. 2026-01); Vernon has no building department of its own. See the Washington County fee schedule

In Vernon, a building permit for a $50,000 remodel runs $436.20 in permit fees, a re-roof $109.00, a $10,000 HVAC change-out $104.00, a $10,000 electrical panel upgrade or rewire $129.00, and a whole-house repipe $157.08. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Washington County Building Department Fees (Schedule A eff. 9/1/2024; plan fees eff. 7/22/2024, rescanned 4/2026)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.

Washington County's Building Department issues building permits and collects permit fees for the City of Vernon under the Washington County Land Development Code (Ord. 2023-16, adopted jointly by the county and the Vernon City Council, effective December 14, 2023, as amended by Ord. 2026-01); Vernon has no building department of its own. See the Washington County fee schedule

Apply online at the Vernon permit portal, or call (850) 638-6195.

How Vernon values a job: New construction valuation is based on the ICC Building Valuation Data square foot cost tables by occupancy and construction type; renovation, remodeling, and rehabilitation valuation is based on the contract price.

Schedule effective September 1, 2024. Last verified: September 26, 2026

This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed

Vernon Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Electrical Permit Fees in Vernon

Residential (1–2 family)
$125.00 flat
Residential (1–2 family): Mobile home, power pole, or swimming pool service
$100.00 flat‡
Residential (1–2 family): Multi-family (per unit)
$125.00 per unit (dwelling)
Residential (1–2 family): Service upgrade or temp pole
$100.00 flat‡
Commercial / 3+ units
$140.00 for the first $5,000, plus $0.008 per additional $1 of job value
Addition (per 500 sq ft)
$100.00 for the first 500 sq ft (addition), plus $20.00 per 500 sq ft (addition) or fraction thereof
State Surcharge (Radon)
3% of the permit fee, minimum $4.00‡
Certified Contractor Admin Fee (if applicable)
$35.00‡
Reinspection Fee (if applicable)
$75.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured Electrician in Vernon

Homeowners and contractors planning a project check Vernon electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Vernon Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

5 documented rates for this permit type; pick the one that matches your job.

Estimated electrical permit fee
$129.00
Included in this total
Electrical Permit Fee$125.00
$125.00 flat
State Surcharge (Radon)$4.00‡
Total Estimate$129.00

‡ Awaiting confirmation from the jurisdiction.

Permit fees for Vernon are administered by Washington County; the fees shown are the Washington County schedule.

Estimate only. Confirm with the Washington County building department before applying. Apply online. Phone: (850) 638-6195. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured Electrician in Vernon

Homeowners and contractors planning a project check Vernon electrical permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Vernon

Washington County's Building Department issues building permits for properties inside Vernon limits. First submit a Land Use Application to the Washington County Planning Department at 1331 South Blvd., Chipley (850-415-5093), checking Vernon as the municipality and attaching a letter from the City of Vernon stating that water and sewer will be provided or are available. After planning approval, registered contractors may email building permit applications to permits@washingtonfl.com, and all others apply in person at the Washington County Building Department, 1331 South Blvd., Chipley, Monday through Friday, 8 a.m. to 4 p.m. Schedule inspections by contacting the Building Department at (850) 638-6195 at least 24 to 48 hours ahead with your permit number and inspection type.

Source: Vernon application instructions

Apply online: Vernon permit portal
Building Department Contact
Address
1331 South Blvd., Chipley, FL 32428
Hours
Monday to Friday, 8:00 a.m. to 4:00 p.m.

Vernon Permit Fee FAQs

How Much Does a Building Permit Cost in Vernon?

The building permit for a $50,000 residential remodel runs $436.20, including the documented surcharges and minimum fees. The estimate is built from Vernon's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Vernon?

The roofing permit for a residential re-roof runs $109.00, assuming a 2,000 sq ft (20-square) roof (the schedule prices per unit), based on Vernon's sourced fee schedule.

How Are Permit Fees Calculated in Vernon?

A residential building permit is tiered rates by job value, minimum $100.00. Electrical permits are flat fees; Plumbing permits are priced per fixture; Mechanical / HVAC permits are flat fees for the default job, while new construction is priced per unit; Roofing permits are priced per square. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Surcharges Are Added to Permits in Vernon?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (15% of the permit fee, minimum $35.00) and State Surcharge (Radon) (3% of the permit fee, minimum $4.00). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Do I Need a Permit for a Small Residential Job in Vernon?

Florida's HB 803 (effective July 2026) exempts certain single-family work under $7,500 from permitting statewide, excluding electrical, plumbing, structural, mechanical, and gas work. Confirm with the building department whether your job qualifies before skipping a permit. Read what HB 803 changed and what it saves.

Where Do These Fees Come From?

Every figure on this page is sourced from Washington County Building Department Fees (Schedule A eff. 9/1/2024; plan fees eff. 7/22/2024, rescanned 4/2026). See the official schedule. Last verified .

Other Jurisdictions in Washington County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save. Wondering whether fees changed this year? See which Florida fee schedules are new.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.