Vernon, FL Permit Fees (2026)
Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Vernon, straight from the official fee schedule, with a free permit fee calculator below.
Washington County's Building Department issues building permits and collects permit fees for the City of Vernon under the Washington County Land Development Code (Ord. 2023-16, adopted jointly by the county and the Vernon City Council, effective December 14, 2023, as amended by Ord. 2026-01); Vernon has no building department of its own. See the Washington County fee schedule
In Vernon, a building permit for a $50,000 remodel runs $615.56 in permit fees, a $20,000 re-roof $179.00, a $10,000 HVAC change-out $174.00, a $10,000 electrical panel upgrade or rewire $199.00, and a $10,000 whole-house repipe $227.08. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume a 2,000 sq ft (20-square) roof and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.
Washington County Building Department Fees (Schedule A eff. 9/1/2024; plan fees eff. 7/22/2024, rescanned 4/2026)
Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits.
Washington County's Building Department issues building permits and collects permit fees for the City of Vernon under the Washington County Land Development Code (Ord. 2023-16, adopted jointly by the county and the Vernon City Council, effective December 14, 2023, as amended by Ord. 2026-01); Vernon has no building department of its own. See the Washington County fee schedule
How Vernon values a job: New construction valuation is based on the ICC Building Valuation Data square foot cost tables by occupancy and construction type; renovation, remodeling, and rehabilitation valuation is based on the contract price.
Schedule effective September 1, 2024. Last verified: September 8, 2026
This schedule predates Florida's HB 803 (July 2026). Jurisdictions statewide are adopting updated schedules; we check sources weekly. What HB 803 changed
Vernon Permit Fee Schedule
Every documented rule for each permit type, straight from the official schedule.
Plumbing Permit Fees in Vernon
‡ Awaiting confirmation from the jurisdiction.
Homeowners and contractors planning a project check Vernon plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageVernon Permit Fee Calculator
Pick a permit type and adjust the job value. Total updates instantly, itemized below.
Permit fees for Vernon are administered by Washington County; the fees shown are the Washington County schedule.
Estimate only. Confirm with the Washington County building department before applying.
Homeowners and contractors planning a project check Vernon plumbing permit fees here first. One sponsor per trade, flat monthly rate.
Advertise on This PageVernon Permit Fee FAQs
How Much Does a Building Permit Cost in Vernon?
How Much Does a Roofing Permit Cost in Vernon?
How Are Permit Fees Calculated in Vernon?
What Surcharges Are Added to Permits in Vernon?
Do I Need a Permit for a Small Residential Job in Vernon?
Where Do These Fees Come From?
Other Jurisdictions in Washington County
Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.
New to Florida permit fees? Read our Florida permit fee guide: how schedules are set, the statutory surcharges, and what HB 803 changed in 2026. Pulling a commercial permit or a small residential job? See what HB 803 lets you save.