FreeEvery fee straight from the official city and county fee schedules. No signup.

Tusayan, AZ Permit Fees (2026)

Building permit fees and building, electrical, plumbing, mechanical/HVAC, and roofing permit fees for Tusayan, straight from the official fee schedule, with a free permit fee calculator below.

Coconino County reviews, inspects and numbers building permits in Tusayan under an intergovernmental agreement with the Town (renewed through August 19, 2029), and applications are filed through the County's online permit portal; the agreement lets the County collect fees from applicants on its regular fee schedule, and the Town pays the County nothing. The Town signs off on each project first (Pre-Application Checklist) and issues the final permit, and it charges its own engineering and civil review fees separately (Res. 2023-04). See the Coconino County fee schedule

Coconino County, which administers building permits in Tusayan, adopted a new building permit fee schedule (Ordinance 2026-04, June 2, 2026) that takes effect January 1, 2027. This page shows the fees in effect until then. See the official notice

In Tusayan, a building permit for a $50,000 remodel runs $2,131.14 in permit fees, a $20,000 re-roof $75.00, an HVAC change-out $59.00, a $10,000 electrical panel upgrade or rewire $95.00, and a whole-house repipe $140.00. Totals include the documented surcharges and minimum fees; where the schedule prices by unit, figures assume one appliance and a 15-fixture scope. Each figure is that single permit only: a job that combines trades, like a kitchen remodel with electrical and plumbing work, pays each applicable permit. Pick a project to load it in the calculator below.

Jump to Permit Fee Calculator
Source

Coconino County Building Permitting Fees (Building and Safety fee schedule labeled effective 9/1/2021; replaced by Ordinance 2026-04 on 1/1/2027)

Covers building, electrical, plumbing, mechanical/HVAC, and roofing permits. Minimum permit fee: $50.00.

Coconino County reviews, inspects and numbers building permits in Tusayan under an intergovernmental agreement with the Town (renewed through August 19, 2029), and applications are filed through the County's online permit portal; the agreement lets the County collect fees from applicants on its regular fee schedule, and the Town pays the County nothing. The Town signs off on each project first (Pre-Application Checklist) and issues the final permit, and it charges its own engineering and civil review fees separately (Res. 2023-04). See the Coconino County fee schedule

Apply online at the Tusayan permit portal, or call 928-638-9909.

How Tusayan values a job: Building permit fees are priced on the construction valuation, set from the ICC Building Valuation Data square-foot costs (February 2019 table) by occupancy and construction type or from the applicant's submitted valuation; commercial projects over $5,000 use the bid value.

Last verified: November 3, 2026

Tusayan Permit Fee Schedule

Every documented rule for each permit type, straight from the official schedule.

Building Permit Fees in Tusayan

Residential (1–2 family): New home or other new residential building (1% of ICC-based valuation)
1% of job value
Printed as a permit fee multiplier of 0.010 times the ICC-based valuation
Residential (1–2 family): Residential fire sprinkler (suppression) system
$150.00 flat
Residential (1–2 family): Remodel or addition priced at 1% of valuation (alternative reading of Part I.C, unconfirmed)
1% of job value (printed as a permit fee multiplier of 0.010 times the valuation)‡
Commercial / 3+ units: New commercial building
1% of job value‡
Printed as a permit fee multiplier of 0.010 times the valuation (bid value for commercial projects over $5,000)
Remodel, addition, deck, or tenant improvement (Table III, on the submitted valuation)
tiered rates by job value‡
Each band starts from its own printed base, a few cents above the band below ($142.68 printed vs $142.60 computed at $2,000; $786.85 vs $786.68 at $25,000; $1,291.77 vs $1,291.60 at $50,000; $1,991.17 vs $1,990.77 at $100,000)
Up to $500
$79.00
Over $500, up to $2,000
$79.00 plus $4.24 per additional $100
Over $2,000, up to $25,000
$142.68 plus $28.00 per additional $1,000
Over $25,000, up to $50,000
$786.85 plus $20.19 per additional $1,000
Over $50,000, up to $100,000
$1,291.77 plus $13.98 per additional $1,000
Over $100,000, up to $500,000
$1,991.17 plus $11.20 per additional $1,000
Awning or canopy
$75.00 flat
Demolition of an existing building or manufactured home
$100.00 flat
Fence over 7 ft tall
$50.00 flat
Masonry fireplace
$80.00 flat
Membrane structure, such as a fabric or air-supported building
$150.00 flat
Prefabricated storage shed, 200 to 400 sq ft, skid set and anchored, no utilities
$200.00 flat
Spa, hot tub, fountain, or above-ground pool
$50.00 flat
Swimming pool, including all related electrical, plumbing, mechanical work and fences
$200.00 flat
Tank or cistern
$75.00 flat
Temporary structure
$120.00 flat
Plan Review Fee (select fee rules only)
65% of the permit fee
Investigation Fee (Work Started Without a Permit) (if applicable)
100% of the permit fee, minimum $100.00
Printed as equal to the building permit fee or $100.00, whichever is greater
Plan Review Deposit (Commercial Remodel or Tenant Improvement) (select fee rules only) (paid when you apply, counts toward the permit fee)
$100.00
Plan Review Deposit (Residential Remodel, Sunroom, Patio Cover, or Deck) (select fee rules only) (paid when you apply, counts toward the permit fee)
$75.00
Re-inspection Fee (if applicable)
$120.00
Temporary Certificate of Occupancy (Commercial) (if applicable)
$300.00
Temporary Certificate of Occupancy (Residential) (if applicable)
$120.00

‡ Awaiting confirmation from the jurisdiction.

Sponsor This Page
Be the Featured General Contractor in Tusayan

Homeowners and contractors planning a project check Tusayan building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

Tusayan Permit Fee Calculator

Pick a permit type and adjust the job value. Total updates instantly, itemized below.

Permit type
Project type
Kind of work
Job type

13 documented rates for this permit type; pick the one that matches your job.

$
$2,500$500,000
Estimated building permit fee
$2,131.14
Included in this total
Building Permit Fee$1,291.60‡
$786.85 + 25 × $20.19 per $1,000 over $25,000 (see the fee table above)
Each band starts from its own printed base, a few cents above the band below ($142.68 printed vs $142.60 computed at $2,000; $786.85 vs $786.68 at $25,000; $1,291.77 vs $1,291.60 at $50,000; $1,991.17 vs $1,990.77 at $100,000)
Plan Review Fee$839.54
Total Estimate$2,131.14
Paid when you apply, counts toward this total
Plan Review Deposit (Residential Remodel, Sunroom, Patio Cover, or Deck)$75.00
You pay this when you apply. It comes off the final permit bill, so it does not add to the total above.

‡ Awaiting confirmation from the jurisdiction.

Coconino County, which administers building permits in Tusayan, adopted a new building permit fee schedule (Ordinance 2026-04, June 2, 2026) that takes effect January 1, 2027. This page shows the fees in effect until then. See the official notice

Building permit fees are priced on the construction valuation, set from the ICC Building Valuation Data square-foot costs (February 2019 table) by occupancy and construction type or from the applicant's submitted valuation; commercial projects over $5,000 use the bid value.

Permit fees for Tusayan are administered by Coconino County; the fees shown are the Coconino County schedule.

Estimate only. Confirm with the Coconino County building department before applying. Apply online. Phone: 928-638-9909. Permit fees only; excludes impact fees, utility connection charges, and other non-permit charges.

Sponsor This Page
Be the Featured General Contractor in Tusayan

Homeowners and contractors planning a project check Tusayan building permit fees here first. One sponsor per trade, flat monthly rate.

Advertise on This Page

How to Apply for a Permit in Tusayan

Building permit plan reviews and inspections in Tusayan are done by Coconino County under an intergovernmental agreement with the Town.

Before applying for a building permit, submit a completed Pre-Application Checklist to the Town of Tusayan and receive Town approval. The Town strongly encourages a pre-application meeting; email the Town Manager to schedule one.

Then apply for the building permit through the Coconino County online permit portal. After the County completes its review, the Town issues the final building permit, and no construction may begin until the Town has issued its final signed permit.

Other agencies (Coconino County Flood Control District, Tusayan Sanitary District, Tusayan Fire District, Grand Canyon School District, Arizona State Fire Marshal) may require separate permits or plan sets.

Source: Tusayan application instructions

Apply online: Tusayan permit portal
Building Department Contact
Address
845 Mustang Drive, Tusayan, AZ 86023

Tusayan Permit Fee FAQs

How Much Does a Building Permit Cost in Tusayan?

The building permit for a $50,000 residential remodel runs $2,131.14, including the documented surcharges and minimum fees. The estimate is built from Tusayan's sourced fee schedule, and it covers the building permit alone; a job that combines trades pays each applicable permit. Calculate your job's value for an itemized total.

How Much Does a Roofing Permit Cost in Tusayan?

The roofing permit for a $20,000 residential re-roof runs $75.00, based on Tusayan's sourced fee schedule.

How Are Permit Fees Calculated in Tusayan?

A residential building permit is tiered rates by job value. Electrical permits are flat fees for the default job (Service panel upgrade or replacement, up to 400 A single-phase), while other work is priced per sq ft; Plumbing permits are priced per fixture; Mechanical / HVAC permits are priced per appliance; Roofing permits are flat fees. New construction is priced separately from remodel and alteration work; the calculator asks which kind of job yours is. Every rate comes straight from the sourced fee schedule above. Enter your job's details for an itemized total.

What Is the Minimum Permit Fee in Tusayan?

The sourced schedule sets a minimum permit fee of $50.00; small jobs pay at least that much before surcharges. The calculator applies it automatically.

What Surcharges Are Added to Permits in Tusayan?

On top of the base permit fee, the sourced schedule adds Plan Review Fee (65% of the permit fee). Each is included in the estimates it applies to; the fee schedule above shows which permits and job types each one covers.

Where Do These Fees Come From?

Every figure on this page is sourced from Coconino County Building Permitting Fees (Building and Safety fee schedule labeled effective 9/1/2021; replaced by Ordinance 2026-04 on 1/1/2027). See the official schedule. Last verified .

Other Jurisdictions in Coconino County

Jobs inside another city's limits are permitted by that city; unincorporated areas by the county.

Contact

Get in Touch

Missing a jurisdiction? Spotted a fee that looks off? Request coverage for a city or county, report an issue, or ask about sponsorship. We typically reply within one business day.